Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:19 PM · 6139 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL06.EY.DHA.02080 RPL06.EY.DHA - Install reminder of CSUs post LO buildback (Qty1) OFE Not Started 09/23/26 09/24/26 2.5 2.5
0%
150.0
RPL06.INT.CC.9380 RPL06.Interior.CC Ext. LO #17 - Install Security Lowside OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 09/23/26 09/24/26 2.5 2.5
0%
81.2
RPL06.INT.CC.9400 RPL06.Interior.CC Ext. LO #17 - Install Controls / EPMS / BMS OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 09/23/26 09/24/26 2.5 2.5
0%
66.2
RPL06.INT.CC.9420 RPL06.Interior.CC Ext. LO #17 - Mechanical Tie-In Exterior Leave Out Wall #17 (CC - South) Not Started 09/23/26 09/25/26 3.8 3.8
0%
65.0
RPL06.INT.CC.9440 RPL06.Interior.CC Ext. LO #17 - Electrical Tie-In Exterior Leave Out Wall #17 (CC - South) Not Started 09/23/26 09/25/26 3.8 3.8
0%
65.0
RPL06.INT.CTRC.06780 RPL06.Interior.Center-Corridor - Final Finishes & Fixtures - Frame/Blocking Walls & Ceilings Restrooms Not Started 09/23/26 10/06/26 12.5 12.5
0%
37.5
RPL06.INT.CTRC.1480 RPL06.Interior.Center-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection Balance of Walls & Overhead Not Started 09/23/26 10/01/26 8.8 8.8
0%
60.0
RPL06.INT.CTRC.1500 RPL06.Interior.Center-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy Balance of Walls & Overhead Not Started 09/23/26 09/29/26 6.2 6.2
0%
50.0
RPL06.INT.DHC.01350 RPL06.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 3 Not Started 09/23/26 01/07/27 90.0 90.0
0%
3.8
RPL06.INT.DHC.01370 RPL06.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 09/23/26 09/28/26 5.0 5.0
0%
128.8
RPL06.INT.DHC.02390 RPL06.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle) Control Fault Domain 3 Not Started 09/23/26 09/28/26 5.0 5.0
0%
76.2
RPL06.INT.ENDC.01330 RPL06.Interior.End-Corridor - Electrical Trim Fit out Not Started 09/23/26 09/28/26 5.0 5.0
0%
177.5
RPL06.INT.ENDC.01340 RPL06.Interior.End-Corridor - Install Grounding Fit out Not Started 09/23/26 10/06/26 12.5 12.5
0%
261.2
RPL06.INT.SSB.02540 RPL06.Interior.SSB - BoW - ACT - Ceiling Grid Balance of Walls and OverHead Not Started 09/23/26 09/29/26 6.2 6.2
0%
123.8
RPL06.INT.SSB.02720 RPL06.Interior.SSB - BoW - Install Acoustic Baffle Ceiling Walls in specific rooms Balance of Walls and OverHead Not Started 09/23/26 09/25/26 3.8 3.8
0%
178.8
RPL06.WP3B.012020 RPL06.Conn EF2<>DHB.11 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.11 Not Started 09/23/26 09/24/26 2.5 2.5
0%
81.2
RPL06.WP4.010080 RPL06.Conn DHB.11 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 09/23/26 09/23/26 1.2 1.2
0%
95.0
RPL06.WP4.010100 RPL06.Conn DHB.12 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 09/23/26 09/23/26 1.2 1.2
0%
167.5
RPL06.WP4.010200 RPL06.Conn DHB.11.01 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 09/23/26 10/06/26 12.5 12.5
0%
128.8
RPL06.WP4.010220 RPL06.Conn DHB.12.05 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 09/23/26 10/06/26 12.5 12.5
0%
128.8
RPL06.WP4.010440 RPL06.Conn DHB.11 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 09/23/26 09/23/26 1.2 1.2
0%
157.5
RPL06.WP4.010460 RPL06.Conn DHB.12 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 09/23/26 09/23/26 1.2 1.2
0%
157.5
RPL06.CON.WP3.01840 RPL06.Conn EF1 (South) Install OSP Pathway (for RPL06) - P4 Infrastructure Not Started 09/24/26 09/25/26 2.5 2.5
0%
98.8
RPL06.CON.WP3A.01680 RPL06.Conn EF2 (North) Install OSP Pathway (for RPL06) - P2 Infrastructure Not Started 09/24/26 09/25/26 2.5 2.5
0%
98.8
RPL06.INT.DHC.01390 RPL06.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 09/24/26 09/29/26 5.0 5.0
0%
128.8
RPL06.INT.SSB.14220 RPL06.Interior.SSB LO #01 to #05 - Fire Safing OH and In-wall Finishes Not Started 09/24/26 09/24/26 1.2 1.2
0%
72.5
RPL06.WP4.010240 RPL06.Conn DHB.11 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 09/24/26 09/24/26 1.2 1.2
0%
95.0
RPL06.WP4.010260 RPL06.Conn DHB.12 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 09/24/26 09/24/26 1.2 1.2
0%
167.5
RPL06.WP4.010560 RPL06.Conn DHB.11.01<>01 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 09/24/26 09/28/26 3.8 3.8
0%
157.5
RPL06.WP4.010580 RPL06.Conn DHB.12.05<>05 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 09/24/26 09/28/26 3.8 3.8
0%
157.5
RPL06.WP4.010600 RPL06.Conn DHB.11 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 09/24/26 09/28/26 3.8 3.8
0%
176.2
RPL06.WP4.010620 RPL06.Conn DHB.12 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 09/24/26 09/28/26 3.8 3.8
0%
176.2
GCD.RPL06.2251 L3/L4 Finish EY - DHB EY Not Started 09/25/26 09/25/26 0.0 0.0
0%
161.2
RPL.GF.D.N6120.XG Prod EF1 Infrastructure Ready Give Milestones (XREFs) Not Started 09/25/26 09/25/26 0.0 0.0
0%
363.8
RPL.GF.D.N6130.XG Prod EF2 Infrastructure Ready Give Milestones (XREFs) Not Started 09/25/26 09/25/26 0.0 0.0
0%
363.8
RPL06.CON.WP3B.01080 RPL06.Conn EF2<>DHB12 - WBS Summary EF2<>DHB.12 Not Started 09/25/26 10/09/26 13.8 13.8
0%
152.5
RPL06.EY.DHA.01450 RPL06.EY.DHA - Install Remaining Electrical Tie-ins Tie-ins Not Started 09/25/26 10/06/26 10.0 10.0
0%
152.5
RPL06.INT.CC.9500 RPL06.Interior.CC Ext. LO #17 - Install Electrical Lowside OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 09/25/26 09/28/26 2.5 2.5
0%
66.2
RPL06.INT.DHA.01310 RPL06.Interior.DHA - Control Fault Domain 2 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 09/25/26 10/15/26 18.8 18.8
0%
57.5
RPL06.INT.DHA.01320 RPL06.Interior.DHA - Control Fault Domain 2 - Pull EPMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 09/25/26 10/15/26 18.8 18.8
0%
57.5
RPL06.INT.DHA.01330 RPL06.Interior.DHA - Control Fault Domain 2 - Set UPS and Panel (2) Remaining Tie-ins post Mech Side Aisle install Not Started 09/25/26 10/15/26 18.8 18.8
0%
45.0
RPL06.INT.DHA.03640 RPL06.Interior.DHA - OFE - Control Fault Domain 3 (Mech Side Aisle) Control Fault Domain 3 Not Started 09/25/26 10/12/26 15.0 15.0
0%
16.2
RPL06.INT.DHC.01410 RPL06.Interior.DHC - Control Fault Domain 3 - Install Duct (LV Side) LV Side Tie-ins Not Started 09/25/26 09/30/26 5.0 5.0
0%
133.8
RPL06.INT.DHC.01440 RPL06.Interior.DHC - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary Control Fault Domain 3 Not Started 09/25/26 02/17/27 121.2 121.2
0%
65.0
RPL06.INT.SSB.14400 RPL06.Interior.SSB LO #01 to #05 - Tape Finish Paint Finishes Not Started 09/25/26 09/29/26 3.8 3.8
0%
72.5
RPL06.WP3B.012040 RPL06.Conn EF2<>DHB.12 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.12 Not Started 09/25/26 09/28/26 2.5 2.5
0%
90.0
RPL06.WP3B.013460 RPL06.Conn EF2<>DHB.11 Install (A-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.11 Not Started 09/25/26 09/25/26 1.2 1.2
0%
81.2
RPL06.WP4.010400 RPL06.Conn DHB.11 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 09/25/26 09/25/26 1.2 1.2
0%
95.0
RPL06.WP4.010420 RPL06.Conn DHB.12 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 09/25/26 09/25/26 1.2 1.2
0%
167.5
GCD.RPL06.4605 L3/L4 Start EY - DHA EY Not Started 09/28/26 09/28/26 0.0 0.0
0%
173.8
ICM.B6.2510.B [SSDCB1] L3/4 Start - DHB Commissioning Not Started 09/28/26 09/28/26 0.0 0.0
0%
161.2
RPL06.CON.WP3.01860 RPL06.Conn EF1 (South) Splice, Test & Install OSP Cable for RPL10<>RPL06 Cabling Not Started 09/28/26 10/01/26 5.0 5.0
0%
160.0
RPL06.CON.WP3A.01780 RPL06.Conn EF2 (North) Splice, Test & Install OSP Cable for RPL10<>RPL06 Cabling Not Started 09/28/26 10/01/26 5.0 5.0
0%
160.0
RPL06.CX.DHA.01000 RPL06.CX.DHA - L3, L4, IST - WBS Summary DHA Not Started 09/28/26 05/20/27 201.2 201.2
0%
150.0
RPL06.CX.DHA.01010 RPL06.CX.DHA - L3 - WBS Summary (Electrical) DHA ELECTRICAL Not Started 09/28/26 01/07/27 86.2 86.2
0%
87.5
RPL06.CX.DHA.01020 RPL06.CX.DHA - L3/L4 - MV Skids (10) Loop DHA ELECTRICAL Not Started 09/28/26 10/09/26 12.5 12.5
0%
18.8
RPL06.CX.DHB.01030 RPL06.CX.DHB - L3/L4 - House Power (for electrical) DHB HOUSE POWER Not Started 09/28/26 10/09/26 12.5 12.5
0%
18.8
RPL06.EY.DHA.01340 RPL06.EY.DHA - Install Lighting Hardscape and Landscape Not Started 09/28/26 10/09/26 12.5 12.5
0%
176.2
RPL06.EY.DHB.01390 RPL06.EY.DHB - Install Remaining EY Paving Hardscape and Landscape Not Started 09/28/26 10/02/26 6.2 6.2
0%
176.2
RPL06.INT.CC.9480 RPL06.Interior.CC Ext. LO #17 - Fire Safing OH and In-wall Exterior Leave Out Wall #17 (CC - South) Not Started 09/28/26 09/29/26 2.5 2.5
0%
65.0
RPL06.INT.DHB.02600 RPL06.Interior.DHB - OFE - Control Fault Domain 4 (HAC) Control Fault Domain 4 Not Started 09/28/26 10/14/26 16.2 16.2
0%
2.5
RPL06.INT.SBC.03580 RPL06.Interior.SSB-Corridor - BoW - Tape Finish 1st Coat Paint (Both side) & 2nd coat at equipment walls Balance of Walls & Overhead Not Started 09/28/26 09/30/26 3.8 3.8
0%
63.8
RPL06.INT.SSB.01540 RPL06.Interior.SSB - Loading Dock and Storage - Fire Life Safety Trim Out / Fire Alarm Trim Out Loading Dock and Storage Not Started 09/28/26 10/06/26 8.8 8.8
0%
146.2
RPL06.INT.SSB.03120 RPL06.Interior.SSB - Loading Dock and Storage - Install Store Front Glazing Loading Dock and Storage Not Started 09/28/26 09/29/26 2.5 2.5
0%
171.2
RPL06.WP3B.016340 RPL06.Conn EF2<>DHB.11 Install (Z-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.11 Not Started 09/28/26 10/05/26 7.5 7.5
0%
81.2
RPL06.CX.MCUP.01070 RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - DHB & DHA (Phase2) Fill and Flush Not Started 09/29/26 10/05/26 6.2 6.2
0%
43.8
RPL06.EY.DHA.01460 RPL06.EY.DHA - Install Remaining Mechanical Tie-ins Tie-ins Not Started 09/29/26 10/12/26 12.5 12.5
0%
147.5
RPL06.EY.DHA.01520 RPL06.EY.DHA - Install Floor Mounted Outdoor Split AC Units (Qty 2) OFE Not Started 09/29/26 10/08/26 10.0 10.0
0%
125.0
RPL06.EY.DHB.01470 RPL06.EY.DHB - Remaining L2 Checklist Completion Tie-ins Not Started 09/29/26 10/05/26 6.2 6.2
0%
147.5
RPL06.INT.CC.9580 RPL06.Interior.CC Ext. LO #17 - Install Door Frame Hardware Exterior Leave Out Wall #17 (CC - South) Not Started 09/29/26 10/02/26 5.0 5.0
0%
78.8
RPL06.INT.DHB.01530 RPL06.Interior.DHB - Control Fault Domain 3 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 09/29/26 10/19/26 18.8 18.8
0%
47.5
RPL06.INT.DHB.01540 RPL06.Interior.DHB - Control Fault Domain 3 - Pull EPMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 09/29/26 10/19/26 18.8 18.8
0%
47.5
RPL06.INT.DHB.01550 RPL06.Interior.DHB - Control Fault Domain 3 - Set UPS and Panel (2) and GS.IDF B1 (Stick Built) Remaining Tie-ins post Mech Side Aisle install Not Started 09/29/26 10/19/26 18.8 18.8
0%
41.2
RPL06.INT.DHB.01570 RPL06.Interior.DHB - Control Fault Domain 2 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 09/29/26 10/19/26 18.8 18.8
0%
43.8
RPL06.INT.DHC.01490 RPL06.Interior.DHC - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary Control Fault Domain 4 Not Started 09/29/26 01/22/27 97.5 97.5
0%
1.2
RPL06.INT.DHC.01510 RPL06.Interior.DHC - Control Fault Domain 3 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 09/29/26 10/02/26 5.0 5.0
0%
157.5
RPL06.INT.DHC.02450 RPL06.Interior.DHC - OFE - Control Fault Domain 4 (LV Side Aisle) Control Fault Domain 4 Not Started 09/29/26 10/02/26 5.0 5.0
0%
83.8
RPL06.INT.ENDC.01350 RPL06.Interior.End-Corridor - Plumbing Trim Fit out Not Started 09/29/26 10/02/26 5.0 5.0
0%
177.5
RPL06.INT.ENDC.07000 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Final Clean Restrooms Not Started 09/29/26 10/02/26 5.0 5.0
0%
190.0
RPL06.INT.ENDC.1480 RPL06.Interior.End-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection Balance of Walls & Overhead Not Started 09/29/26 10/07/26 8.8 8.8
0%
141.2
RPL06.INT.ENDC.1500 RPL06.Interior.End-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy Balance of Walls & Overhead Not Started 09/29/26 10/05/26 6.2 6.2
0%
131.2
RPL06.INT.SSB.06240 RPL06.Interior.SSB LO #16 - Install Remaining Lights Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 09/29/26 10/07/26 8.8 8.8
0%
68.8
RPL06.WP3B.013480 RPL06.Conn EF2<>DHB.12 Install (A-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.12 Not Started 09/29/26 09/29/26 1.2 1.2
0%
152.5
RPL06.WP4.010680 RPL06.Conn DHB.11.01<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 09/29/26 09/29/26 1.2 1.2
0%
172.5
RPL06.WP4.010720 RPL06.Conn DHB.11.03<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 09/29/26 10/01/26 3.8 3.8
0%
157.5
RPL06.WP4.010740 RPL06.Conn DHB.12.06<>05 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 09/29/26 10/02/26 5.0 5.0
0%
157.5
RPL.06.D.63330.XR Pull and Term MV Skids - RPL06 DHC Receive Milestones (XREFs) Not Started 09/30/26 09/30/26 0.0 0.0
0%
126.2
RPL.06.D.63730.XG RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHC Give Milestones (XREFs) Not Started 09/30/26 09/30/26 0.0 0.0
0%
360.0
RPL.06.D.63830.XR 100MW Cx Temp Power to MV Skids RPL06 DHC Available Receive Milestones (XREFs) Not Started 09/30/26 09/30/26 0.0 0.0
0%
126.2
RPL.06.D.64080.XG Ready for MV Cable Pull DH C (MVs - Qty 8)* Give Milestones (XREFs) Not Started 09/30/26 09/30/26 0.0 0.0
0%
360.0
RPL06.INT.CC.9520 RPL06.Interior.CC Ext. LO #17 - Install Backing Exterior Leave Out Wall #17 (CC - South) Not Started 09/30/26 10/01/26 2.5 2.5
0%
65.0
RPL06.INT.CTRC.1520 RPL06.Interior.Center-Corridor - BoW - Install Backing at Exterior Wall Balance of Walls & Overhead Not Started 09/30/26 10/06/26 6.2 6.2
0%
50.0
RPL06.INT.DHC.01530 RPL06.Interior.DHC - Control Fault Domain 3 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 09/30/26 10/05/26 5.0 5.0
0%
177.5
RPL06.INT.SSB.02400 RPL06.Interior.SSB - Final Finishes & Fixtures - Final Clean Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) Not Started 09/30/26 10/05/26 5.0 5.0
0%
235.0
RPL06.INT.SSB.02560 RPL06.Interior.SSB - BoW - ACT - Device Tiles Balance of Walls and OverHead Not Started 09/30/26 10/06/26 6.2 6.2
0%
123.8
RPL06.INT.SSB.02580 RPL06.Interior.SSB - BoW - ACT - MEP Devices Balance of Walls and OverHead Not Started 09/30/26 10/06/26 6.2 6.2
0%
123.8
RPL06.INT.SSB.14460 RPL06.Interior.SSB LO #01 to #05 - Mechanical Trim out Finishes Not Started 09/30/26 10/06/26 6.2 6.2
0%
87.5
RPL06.INT.SSB.14480 RPL06.Interior.SSB LO #01 to #05 - Final Paint Finishes Not Started 09/30/26 10/08/26 8.8 8.8
0%
112.5
RPL06.INT.SSB.14560 RPL06.Interior.SSB LO #01 to #05 - Install Remaining Lights Finishes Not Started 09/30/26 10/13/26 12.5 12.5
0%
72.5
RPL06.INT.SSB.14580 RPL06.Interior.SSB LO #01 to #05 - Install Flooring Tiles/Resinous Flooring in specific rooms Finishes Not Started 09/30/26 10/08/26 8.8 8.8
0%
93.8