Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.EY.DHA.02080 |
RPL06.EY.DHA - Install reminder of CSUs post LO buildback (Qty1) | OFE | Not Started | 09/23/26 | 09/24/26 | 2.5 | 2.5 |
|
150.0 |
RPL06.INT.CC.9380 |
RPL06.Interior.CC Ext. LO #17 - Install Security Lowside OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/23/26 | 09/24/26 | 2.5 | 2.5 |
|
81.2 |
RPL06.INT.CC.9400 |
RPL06.Interior.CC Ext. LO #17 - Install Controls / EPMS / BMS OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/23/26 | 09/24/26 | 2.5 | 2.5 |
|
66.2 |
RPL06.INT.CC.9420 |
RPL06.Interior.CC Ext. LO #17 - Mechanical Tie-In | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/23/26 | 09/25/26 | 3.8 | 3.8 |
|
65.0 |
RPL06.INT.CC.9440 |
RPL06.Interior.CC Ext. LO #17 - Electrical Tie-In | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/23/26 | 09/25/26 | 3.8 | 3.8 |
|
65.0 |
RPL06.INT.CTRC.06780 |
RPL06.Interior.Center-Corridor - Final Finishes & Fixtures - Frame/Blocking Walls & Ceilings | Restrooms | Not Started | 09/23/26 | 10/06/26 | 12.5 | 12.5 |
|
37.5 |
RPL06.INT.CTRC.1480 |
RPL06.Interior.Center-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection | Balance of Walls & Overhead | Not Started | 09/23/26 | 10/01/26 | 8.8 | 8.8 |
|
60.0 |
RPL06.INT.CTRC.1500 |
RPL06.Interior.Center-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy | Balance of Walls & Overhead | Not Started | 09/23/26 | 09/29/26 | 6.2 | 6.2 |
|
50.0 |
RPL06.INT.DHC.01350 |
RPL06.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 3 | Not Started | 09/23/26 | 01/07/27 | 90.0 | 90.0 |
|
3.8 |
RPL06.INT.DHC.01370 |
RPL06.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 09/23/26 | 09/28/26 | 5.0 | 5.0 |
|
128.8 |
RPL06.INT.DHC.02390 |
RPL06.Interior.DHC - OFE - Control Fault Domain 3 (LV Side Aisle) | Control Fault Domain 3 | Not Started | 09/23/26 | 09/28/26 | 5.0 | 5.0 |
|
76.2 |
RPL06.INT.ENDC.01330 |
RPL06.Interior.End-Corridor - Electrical Trim | Fit out | Not Started | 09/23/26 | 09/28/26 | 5.0 | 5.0 |
|
177.5 |
RPL06.INT.ENDC.01340 |
RPL06.Interior.End-Corridor - Install Grounding | Fit out | Not Started | 09/23/26 | 10/06/26 | 12.5 | 12.5 |
|
261.2 |
RPL06.INT.SSB.02540 |
RPL06.Interior.SSB - BoW - ACT - Ceiling Grid | Balance of Walls and OverHead | Not Started | 09/23/26 | 09/29/26 | 6.2 | 6.2 |
|
123.8 |
RPL06.INT.SSB.02720 |
RPL06.Interior.SSB - BoW - Install Acoustic Baffle Ceiling Walls in specific rooms | Balance of Walls and OverHead | Not Started | 09/23/26 | 09/25/26 | 3.8 | 3.8 |
|
178.8 |
RPL06.WP3B.012020 |
RPL06.Conn EF2<>DHB.11 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.11 | Not Started | 09/23/26 | 09/24/26 | 2.5 | 2.5 |
|
81.2 |
RPL06.WP4.010080 |
RPL06.Conn DHB.11 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 09/23/26 | 09/23/26 | 1.2 | 1.2 |
|
95.0 |
RPL06.WP4.010100 |
RPL06.Conn DHB.12 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 09/23/26 | 09/23/26 | 1.2 | 1.2 |
|
167.5 |
RPL06.WP4.010200 |
RPL06.Conn DHB.11.01 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/23/26 | 10/06/26 | 12.5 | 12.5 |
|
128.8 |
RPL06.WP4.010220 |
RPL06.Conn DHB.12.05 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 09/23/26 | 10/06/26 | 12.5 | 12.5 |
|
128.8 |
RPL06.WP4.010440 |
RPL06.Conn DHB.11 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 09/23/26 | 09/23/26 | 1.2 | 1.2 |
|
157.5 |
RPL06.WP4.010460 |
RPL06.Conn DHB.12 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 09/23/26 | 09/23/26 | 1.2 | 1.2 |
|
157.5 |
RPL06.CON.WP3.01840 |
RPL06.Conn EF1 (South) Install OSP Pathway (for RPL06) - P4 | Infrastructure | Not Started | 09/24/26 | 09/25/26 | 2.5 | 2.5 |
|
98.8 |
RPL06.CON.WP3A.01680 |
RPL06.Conn EF2 (North) Install OSP Pathway (for RPL06) - P2 | Infrastructure | Not Started | 09/24/26 | 09/25/26 | 2.5 | 2.5 |
|
98.8 |
RPL06.INT.DHC.01390 |
RPL06.Interior.DHC - Control Fault Domain 2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 09/24/26 | 09/29/26 | 5.0 | 5.0 |
|
128.8 |
RPL06.INT.SSB.14220 |
RPL06.Interior.SSB LO #01 to #05 - Fire Safing OH and In-wall | Finishes | Not Started | 09/24/26 | 09/24/26 | 1.2 | 1.2 |
|
72.5 |
RPL06.WP4.010240 |
RPL06.Conn DHB.11 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 09/24/26 | 09/24/26 | 1.2 | 1.2 |
|
95.0 |
RPL06.WP4.010260 |
RPL06.Conn DHB.12 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 09/24/26 | 09/24/26 | 1.2 | 1.2 |
|
167.5 |
RPL06.WP4.010560 |
RPL06.Conn DHB.11.01<>01 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/24/26 | 09/28/26 | 3.8 | 3.8 |
|
157.5 |
RPL06.WP4.010580 |
RPL06.Conn DHB.12.05<>05 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/24/26 | 09/28/26 | 3.8 | 3.8 |
|
157.5 |
RPL06.WP4.010600 |
RPL06.Conn DHB.11 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 09/24/26 | 09/28/26 | 3.8 | 3.8 |
|
176.2 |
RPL06.WP4.010620 |
RPL06.Conn DHB.12 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 09/24/26 | 09/28/26 | 3.8 | 3.8 |
|
176.2 |
GCD.RPL06.2251 |
L3/L4 Finish EY - DHB | EY | Not Started | 09/25/26 | 09/25/26 | 0.0 | 0.0 |
|
161.2 |
RPL.GF.D.N6120.XG |
Prod EF1 Infrastructure Ready | Give Milestones (XREFs) | Not Started | 09/25/26 | 09/25/26 | 0.0 | 0.0 |
|
363.8 |
RPL.GF.D.N6130.XG |
Prod EF2 Infrastructure Ready | Give Milestones (XREFs) | Not Started | 09/25/26 | 09/25/26 | 0.0 | 0.0 |
|
363.8 |
RPL06.CON.WP3B.01080 |
RPL06.Conn EF2<>DHB12 - WBS Summary | EF2<>DHB.12 | Not Started | 09/25/26 | 10/09/26 | 13.8 | 13.8 |
|
152.5 |
RPL06.EY.DHA.01450 |
RPL06.EY.DHA - Install Remaining Electrical Tie-ins | Tie-ins | Not Started | 09/25/26 | 10/06/26 | 10.0 | 10.0 |
|
152.5 |
RPL06.INT.CC.9500 |
RPL06.Interior.CC Ext. LO #17 - Install Electrical Lowside OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/25/26 | 09/28/26 | 2.5 | 2.5 |
|
66.2 |
RPL06.INT.DHA.01310 |
RPL06.Interior.DHA - Control Fault Domain 2 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/25/26 | 10/15/26 | 18.8 | 18.8 |
|
57.5 |
RPL06.INT.DHA.01320 |
RPL06.Interior.DHA - Control Fault Domain 2 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/25/26 | 10/15/26 | 18.8 | 18.8 |
|
57.5 |
RPL06.INT.DHA.01330 |
RPL06.Interior.DHA - Control Fault Domain 2 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/25/26 | 10/15/26 | 18.8 | 18.8 |
|
45.0 |
RPL06.INT.DHA.03640 |
RPL06.Interior.DHA - OFE - Control Fault Domain 3 (Mech Side Aisle) | Control Fault Domain 3 | Not Started | 09/25/26 | 10/12/26 | 15.0 | 15.0 |
|
16.2 |
RPL06.INT.DHC.01410 |
RPL06.Interior.DHC - Control Fault Domain 3 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 09/25/26 | 09/30/26 | 5.0 | 5.0 |
|
133.8 |
RPL06.INT.DHC.01440 |
RPL06.Interior.DHC - Tie-ins - Control Fault Domain 3 (including IDF) - WBS Summary | Control Fault Domain 3 | Not Started | 09/25/26 | 02/17/27 | 121.2 | 121.2 |
|
65.0 |
RPL06.INT.SSB.14400 |
RPL06.Interior.SSB LO #01 to #05 - Tape Finish Paint | Finishes | Not Started | 09/25/26 | 09/29/26 | 3.8 | 3.8 |
|
72.5 |
RPL06.WP3B.012040 |
RPL06.Conn EF2<>DHB.12 Pull Pigtails (384F) P2&3 (LV) | EF2<>DHB.12 | Not Started | 09/25/26 | 09/28/26 | 2.5 | 2.5 |
|
90.0 |
RPL06.WP3B.013460 |
RPL06.Conn EF2<>DHB.11 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.11 | Not Started | 09/25/26 | 09/25/26 | 1.2 | 1.2 |
|
81.2 |
RPL06.WP4.010400 |
RPL06.Conn DHB.11 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 09/25/26 | 09/25/26 | 1.2 | 1.2 |
|
95.0 |
RPL06.WP4.010420 |
RPL06.Conn DHB.12 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 09/25/26 | 09/25/26 | 1.2 | 1.2 |
|
167.5 |
GCD.RPL06.4605 |
L3/L4 Start EY - DHA | EY | Not Started | 09/28/26 | 09/28/26 | 0.0 | 0.0 |
|
173.8 |
ICM.B6.2510.B |
[SSDCB1] L3/4 Start - DHB | Commissioning | Not Started | 09/28/26 | 09/28/26 | 0.0 | 0.0 |
|
161.2 |
RPL06.CON.WP3.01860 |
RPL06.Conn EF1 (South) Splice, Test & Install OSP Cable for RPL10<>RPL06 | Cabling | Not Started | 09/28/26 | 10/01/26 | 5.0 | 5.0 |
|
160.0 |
RPL06.CON.WP3A.01780 |
RPL06.Conn EF2 (North) Splice, Test & Install OSP Cable for RPL10<>RPL06 | Cabling | Not Started | 09/28/26 | 10/01/26 | 5.0 | 5.0 |
|
160.0 |
RPL06.CX.DHA.01000 |
RPL06.CX.DHA - L3, L4, IST - WBS Summary | DHA | Not Started | 09/28/26 | 05/20/27 | 201.2 | 201.2 |
|
150.0 |
RPL06.CX.DHA.01010 |
RPL06.CX.DHA - L3 - WBS Summary (Electrical) | DHA ELECTRICAL | Not Started | 09/28/26 | 01/07/27 | 86.2 | 86.2 |
|
87.5 |
RPL06.CX.DHA.01020 |
RPL06.CX.DHA - L3/L4 - MV Skids (10) Loop | DHA ELECTRICAL | Not Started | 09/28/26 | 10/09/26 | 12.5 | 12.5 |
|
18.8 |
RPL06.CX.DHB.01030 |
RPL06.CX.DHB - L3/L4 - House Power (for electrical) | DHB HOUSE POWER | Not Started | 09/28/26 | 10/09/26 | 12.5 | 12.5 |
|
18.8 |
RPL06.EY.DHA.01340 |
RPL06.EY.DHA - Install Lighting | Hardscape and Landscape | Not Started | 09/28/26 | 10/09/26 | 12.5 | 12.5 |
|
176.2 |
RPL06.EY.DHB.01390 |
RPL06.EY.DHB - Install Remaining EY Paving | Hardscape and Landscape | Not Started | 09/28/26 | 10/02/26 | 6.2 | 6.2 |
|
176.2 |
RPL06.INT.CC.9480 |
RPL06.Interior.CC Ext. LO #17 - Fire Safing OH and In-wall | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/28/26 | 09/29/26 | 2.5 | 2.5 |
|
65.0 |
RPL06.INT.DHB.02600 |
RPL06.Interior.DHB - OFE - Control Fault Domain 4 (HAC) | Control Fault Domain 4 | Not Started | 09/28/26 | 10/14/26 | 16.2 | 16.2 |
|
2.5 |
RPL06.INT.SBC.03580 |
RPL06.Interior.SSB-Corridor - BoW - Tape Finish 1st Coat Paint (Both side) & 2nd coat at equipment walls | Balance of Walls & Overhead | Not Started | 09/28/26 | 09/30/26 | 3.8 | 3.8 |
|
63.8 |
RPL06.INT.SSB.01540 |
RPL06.Interior.SSB - Loading Dock and Storage - Fire Life Safety Trim Out / Fire Alarm Trim Out | Loading Dock and Storage | Not Started | 09/28/26 | 10/06/26 | 8.8 | 8.8 |
|
146.2 |
RPL06.INT.SSB.03120 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Store Front Glazing | Loading Dock and Storage | Not Started | 09/28/26 | 09/29/26 | 2.5 | 2.5 |
|
171.2 |
RPL06.WP3B.016340 |
RPL06.Conn EF2<>DHB.11 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.11 | Not Started | 09/28/26 | 10/05/26 | 7.5 | 7.5 |
|
81.2 |
RPL06.CX.MCUP.01070 |
RPL06.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - DHB & DHA (Phase2) | Fill and Flush | Not Started | 09/29/26 | 10/05/26 | 6.2 | 6.2 |
|
43.8 |
RPL06.EY.DHA.01460 |
RPL06.EY.DHA - Install Remaining Mechanical Tie-ins | Tie-ins | Not Started | 09/29/26 | 10/12/26 | 12.5 | 12.5 |
|
147.5 |
RPL06.EY.DHA.01520 |
RPL06.EY.DHA - Install Floor Mounted Outdoor Split AC Units (Qty 2) | OFE | Not Started | 09/29/26 | 10/08/26 | 10.0 | 10.0 |
|
125.0 |
RPL06.EY.DHB.01470 |
RPL06.EY.DHB - Remaining L2 Checklist Completion | Tie-ins | Not Started | 09/29/26 | 10/05/26 | 6.2 | 6.2 |
|
147.5 |
RPL06.INT.CC.9580 |
RPL06.Interior.CC Ext. LO #17 - Install Door Frame Hardware | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/29/26 | 10/02/26 | 5.0 | 5.0 |
|
78.8 |
RPL06.INT.DHB.01530 |
RPL06.Interior.DHB - Control Fault Domain 3 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/26 | 10/19/26 | 18.8 | 18.8 |
|
47.5 |
RPL06.INT.DHB.01540 |
RPL06.Interior.DHB - Control Fault Domain 3 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/26 | 10/19/26 | 18.8 | 18.8 |
|
47.5 |
RPL06.INT.DHB.01550 |
RPL06.Interior.DHB - Control Fault Domain 3 - Set UPS and Panel (2) and GS.IDF B1 (Stick Built) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/26 | 10/19/26 | 18.8 | 18.8 |
|
41.2 |
RPL06.INT.DHB.01570 |
RPL06.Interior.DHB - Control Fault Domain 2 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 09/29/26 | 10/19/26 | 18.8 | 18.8 |
|
43.8 |
RPL06.INT.DHC.01490 |
RPL06.Interior.DHC - OFE - Control Fault Domain 4 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | Control Fault Domain 4 | Not Started | 09/29/26 | 01/22/27 | 97.5 | 97.5 |
|
1.2 |
RPL06.INT.DHC.01510 |
RPL06.Interior.DHC - Control Fault Domain 3 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 09/29/26 | 10/02/26 | 5.0 | 5.0 |
|
157.5 |
RPL06.INT.DHC.02450 |
RPL06.Interior.DHC - OFE - Control Fault Domain 4 (LV Side Aisle) | Control Fault Domain 4 | Not Started | 09/29/26 | 10/02/26 | 5.0 | 5.0 |
|
83.8 |
RPL06.INT.ENDC.01350 |
RPL06.Interior.End-Corridor - Plumbing Trim | Fit out | Not Started | 09/29/26 | 10/02/26 | 5.0 | 5.0 |
|
177.5 |
RPL06.INT.ENDC.07000 |
RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Final Clean | Restrooms | Not Started | 09/29/26 | 10/02/26 | 5.0 | 5.0 |
|
190.0 |
RPL06.INT.ENDC.1480 |
RPL06.Interior.End-Corridor - BoW - MEPF Hard Lid Rough-In/ Close of Inspection | Balance of Walls & Overhead | Not Started | 09/29/26 | 10/07/26 | 8.8 | 8.8 |
|
141.2 |
RPL06.INT.ENDC.1500 |
RPL06.Interior.End-Corridor - BoW - Install Blocking/Steel support Assembly for Metal Canopy | Balance of Walls & Overhead | Not Started | 09/29/26 | 10/05/26 | 6.2 | 6.2 |
|
131.2 |
RPL06.INT.SSB.06240 |
RPL06.Interior.SSB LO #16 - Install Remaining Lights | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 09/29/26 | 10/07/26 | 8.8 | 8.8 |
|
68.8 |
RPL06.WP3B.013480 |
RPL06.Conn EF2<>DHB.12 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.12 | Not Started | 09/29/26 | 09/29/26 | 1.2 | 1.2 |
|
152.5 |
RPL06.WP4.010680 |
RPL06.Conn DHB.11.01<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/29/26 | 09/29/26 | 1.2 | 1.2 |
|
172.5 |
RPL06.WP4.010720 |
RPL06.Conn DHB.11.03<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 09/29/26 | 10/01/26 | 3.8 | 3.8 |
|
157.5 |
RPL06.WP4.010740 |
RPL06.Conn DHB.12.06<>05 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 09/29/26 | 10/02/26 | 5.0 | 5.0 |
|
157.5 |
RPL.06.D.63330.XR |
Pull and Term MV Skids - RPL06 DHC | Receive Milestones (XREFs) | Not Started | 09/30/26 | 09/30/26 | 0.0 | 0.0 |
|
126.2 |
RPL.06.D.63730.XG |
RMUs/MV Skids Set (Ready for Longhorn Pulls) - DHC | Give Milestones (XREFs) | Not Started | 09/30/26 | 09/30/26 | 0.0 | 0.0 |
|
360.0 |
RPL.06.D.63830.XR |
100MW Cx Temp Power to MV Skids RPL06 DHC Available | Receive Milestones (XREFs) | Not Started | 09/30/26 | 09/30/26 | 0.0 | 0.0 |
|
126.2 |
RPL.06.D.64080.XG |
Ready for MV Cable Pull DH C (MVs - Qty 8)* | Give Milestones (XREFs) | Not Started | 09/30/26 | 09/30/26 | 0.0 | 0.0 |
|
360.0 |
RPL06.INT.CC.9520 |
RPL06.Interior.CC Ext. LO #17 - Install Backing | Exterior Leave Out Wall #17 (CC - South) | Not Started | 09/30/26 | 10/01/26 | 2.5 | 2.5 |
|
65.0 |
RPL06.INT.CTRC.1520 |
RPL06.Interior.Center-Corridor - BoW - Install Backing at Exterior Wall | Balance of Walls & Overhead | Not Started | 09/30/26 | 10/06/26 | 6.2 | 6.2 |
|
50.0 |
RPL06.INT.DHC.01530 |
RPL06.Interior.DHC - Control Fault Domain 3 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 09/30/26 | 10/05/26 | 5.0 | 5.0 |
|
177.5 |
RPL06.INT.SSB.02400 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Final Clean | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 09/30/26 | 10/05/26 | 5.0 | 5.0 |
|
235.0 |
RPL06.INT.SSB.02560 |
RPL06.Interior.SSB - BoW - ACT - Device Tiles | Balance of Walls and OverHead | Not Started | 09/30/26 | 10/06/26 | 6.2 | 6.2 |
|
123.8 |
RPL06.INT.SSB.02580 |
RPL06.Interior.SSB - BoW - ACT - MEP Devices | Balance of Walls and OverHead | Not Started | 09/30/26 | 10/06/26 | 6.2 | 6.2 |
|
123.8 |
RPL06.INT.SSB.14460 |
RPL06.Interior.SSB LO #01 to #05 - Mechanical Trim out | Finishes | Not Started | 09/30/26 | 10/06/26 | 6.2 | 6.2 |
|
87.5 |
RPL06.INT.SSB.14480 |
RPL06.Interior.SSB LO #01 to #05 - Final Paint | Finishes | Not Started | 09/30/26 | 10/08/26 | 8.8 | 8.8 |
|
112.5 |
RPL06.INT.SSB.14560 |
RPL06.Interior.SSB LO #01 to #05 - Install Remaining Lights | Finishes | Not Started | 09/30/26 | 10/13/26 | 12.5 | 12.5 |
|
72.5 |
RPL06.INT.SSB.14580 |
RPL06.Interior.SSB LO #01 to #05 - Install Flooring Tiles/Resinous Flooring in specific rooms | Finishes | Not Started | 09/30/26 | 10/08/26 | 8.8 | 8.8 |
|
93.8 |