Schedule Viewer

Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer · Uploaded Apr 16, 2026 01:19 PM · 6139 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
1
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL06.WP4.011060 RPL06.Conn DHA.02 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 10/08/26 10/08/26 1.2 1.2
0%
166.2
RPL06.WP4.011560 RPL06.Conn DHA.01.01<>01 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Across-Row Not Started 10/08/26 10/12/26 3.8 3.8
0%
157.5
RPL06.WP4.011580 RPL06.Conn DHA.02.05<>05 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 10/08/26 10/12/26 3.8 3.8
0%
157.5
RPL06.WP4.011600 RPL06.Conn DHA.01 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 10/08/26 10/12/26 3.8 3.8
0%
176.2
RPL06.WP4.011620 RPL06.Conn DHA.02 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 10/08/26 10/12/26 3.8 3.8
0%
176.2
RPL06.WP4.011800 RPL06.Conn DHB.11.02<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 10/08/26 10/08/26 1.2 1.2
0%
161.2
RPL06.WP4.011900 RPL06.Conn DHB.11.04<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 10/08/26 10/13/26 5.0 5.0
0%
157.5
RPL06.WP4.011920 RPL06.Conn DHB.12.08<>07 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 10/08/26 10/13/26 5.0 5.0
0%
157.5
GCD.RPL06.3528 [RPL06] TC-C Ready : Production Cabling Start [DHB Rows 09-16] TC-C Ready: Production Cabling - DHB Not Started 10/09/26 10/09/26 0.0 0.0
0%
352.5
GCD.RPL06.4565 L3/L4 Finish EY - DHA EY Not Started 10/09/26 10/09/26 0.0 0.0
0%
161.2
RPL06.CON.WP3B.01160 RPL06.Conn EF2<>DHB14 - WBS Summary FE Cabling Not Started 10/09/26 01/04/27 71.2 71.2
0%
82.5
RPL06.CON.WP3B.01180 RPL06.Conn EF1<>DHB13 - WBS Summary EF2<>DHB.13 Not Started 10/09/26 10/23/26 13.8 13.8
0%
140.0
RPL06.CON.WP3B.01200 RPL06.Conn EF2<>DHB13 - WBS Summary EF2<>DHB.13 Not Started 10/09/26 10/23/26 13.8 13.8
0%
140.0
RPL06.CON.WP3B.01860 RPL06.Conn EF1<>DHA.02 - WBS Summary EF1<>DHA.02 Not Started 10/09/26 10/23/26 13.8 13.8
0%
152.5
RPL06.EY.DHA.01590 RPL06.EY.DHC - Install Mechanical/ refrigerant Tie-ins Build back Exterior Leave Out #17 (South) Not Started 10/09/26 10/15/26 6.2 6.2
0%
125.0
RPL06.EY.DHA.02000 RPL06.EY.DHA - Exterior Leave Out #17 (CC - South) WBS Summary Build back Exterior Leave Out #17 (South) Not Started 10/09/26 11/05/26 25.0 25.0
0%
125.0
RPL06.INT.DHA.01390 RPL06.Interior.DHA - Control Fault Domain 2 - Install Copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 10/09/26 10/29/26 18.8 18.8
0%
45.0
RPL06.INT.DHB.01640 RPL06.Interior.DHB - Control Fault Domain 4 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 10/09/26 10/29/26 18.8 18.8
0%
41.2
RPL06.INT.DHB.01650 RPL06.Interior.DHB - Control Fault Domain 4 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 10/09/26 10/29/26 18.8 18.8
0%
35.0
RPL06.INT.DHB.02260 RPL06.Interior.DHB - Control Fault Domain 4 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 10/09/26 10/29/26 18.8 18.8
0%
35.0
RPL06.INT.DHB.02760 RPL06.Interior.DHB - Control Fault Domain 4 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 10/09/26 10/29/26 18.8 18.8
0%
35.0
RPL06.INT.SSB.06280 RPL06.Interior.SSB LO #16 - Electrical Trim Out Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 10/09/26 10/12/26 2.5 2.5
0%
68.8
RPL06.INT.SSB.06300 RPL06.Interior.SSB LO #16 - Plumbing Trim Out Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 10/09/26 10/12/26 2.5 2.5
0%
70.0
RPL06.INT.SSB.06320 RPL06.Interior.SSB LO #16 - Security Trim Out Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 10/09/26 10/12/26 2.5 2.5
0%
70.0
RPL06.INT.SSB.06340 RPL06.Interior.SSB LO #16 - Fire Life Safety Trim Out Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 10/09/26 10/09/26 1.2 1.2
0%
71.2
RPL06.INT.SSB.06360 RPL06.Interior.SSB LO #16 - Install Asset Tags Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 10/09/26 10/13/26 3.8 3.8
0%
68.8
RPL06.INT.SSB.14520 RPL06.Interior.SSB LO #01 to #05 - Plumbing Trim Out Finishes Not Started 10/09/26 10/15/26 6.2 6.2
0%
103.8
RPL06.INT.SSB.14540 RPL06.Interior.SSB LO #01 to #05 - Fire Life Safety Trim Out Finishes Not Started 10/09/26 10/19/26 8.8 8.8
0%
103.8
RPL06.WP3B.011120 RPL06.Conn EF1<>DHA.02 Pull Pigtails (384F) P1&4 (LV) EF1<>DHA.02 Not Started 10/09/26 10/12/26 2.5 2.5
0%
86.2
RPL06.WP3B.012060 RPL06.Conn EF2<>DHB.13 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.13 Not Started 10/09/26 10/12/26 2.5 2.5
0%
80.0
RPL06.WP3B.012540 RPL06.Conn EF1<>DHA.01 Install (A-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.01 Not Started 10/09/26 10/09/26 1.2 1.2
0%
78.8
RPL06.WP4.011360 RPL06.Conn DHA.01 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 10/09/26 10/12/26 2.5 2.5
0%
90.0
RPL06.WP4.011380 RPL06.Conn DHA.02 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 10/09/26 10/12/26 2.5 2.5
0%
166.2
RPL06.WP4.011480 RPL06.Conn DHB.13 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 10/09/26 10/09/26 1.2 1.2
0%
152.5
RPL06.WP4.011500 RPL06.Conn DHB.14 Pull Ext. Trunk (384F) [SSW<>JXSW] SSW<>JXSW Not Started 10/09/26 10/09/26 1.2 1.2
0%
152.5
RPL06.WP4.011680 RPL06.Conn DHB.14.13 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 10/09/26 10/22/26 12.5 12.5
0%
113.8
RPL06.WP4.012020 RPL06.Conn DHB.13 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 10/09/26 10/09/26 1.2 1.2
0%
142.5
RPL06.WP4.012040 RPL06.Conn DHB.14 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 10/09/26 10/09/26 1.2 1.2
0%
142.5
RPL06.WP4.013020 RPL06.Conn DHB.13.09 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] Jumpers (AI Confirmed) Not Started 10/09/26 10/22/26 12.5 12.5
0%
113.8
ICM.B6.2510.A [SSDCB1] L3/4 Start - DHA Commissioning Not Started 10/12/26 10/12/26 0.0 0.0
0%
161.2
RPL06.CX.DHA.01030 RPL06.CX.DHA - L3/L4 - House Power (for electrical) DHA HOUSE POWER Not Started 10/12/26 10/23/26 12.5 12.5
0%
18.8
RPL06.CX.DHB.01070 RPL06.CX.DHB - L3/L4 - House Power (for mechainical) DHB HOUSE POWER Not Started 10/12/26 10/23/26 12.5 12.5
0%
18.8
RPL06.EY.DHA.01390 RPL06.EY.DHA - Install Remaining EY Paving Hardscape and Landscape Not Started 10/12/26 10/16/26 6.2 6.2
0%
176.2
RPL06.EY.DHC.01290 RPL06.EY.DHC - MV Loop - L2 Checklist Completion Tie-ins Not Started 10/12/26 10/23/26 12.5 12.5
0%
103.8
RPL06.EY.DHD.01330 RPL06.EY.DHD - Install Early EY Paving Hardscape and Landscape Not Started 10/12/26 10/16/26 6.2 6.2
0%
241.2
RPL06.INT.DHA.03680 RPL06.Interior.DHA - OFE - Control Fault Domain 4 (HAC) Control Fault Domain 4 Not Started 10/12/26 10/28/26 16.2 16.2
0%
-10.0
RPL06.INT.SSB.02600 RPL06.Interior.SSB - BoW - ACT - Close Up Inspection Balance of Walls and OverHead Not Started 10/12/26 10/16/26 6.2 6.2
0%
120.0
RPL06.OFCI.6860 OFCI Delivery: FE Fiber for CFD B.3 (ROJ ) (RVCD ) Data Hall B Not Started 10/12/26 10/30/26 18.8 18.8
0%
62.5
RPL06.WP3B.013980 RPL06.Conn EF1<>DHA.01 Splice (A-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.01 Not Started 10/12/26 10/19/26 7.5 7.5
0%
78.8
RPL06.WP3B.015420 RPL06.Conn EF1<>DHA.01 Install (Z-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.01 Not Started 10/12/26 10/12/26 1.2 1.2
0%
78.8
RPL06.WP4.011700 RPL06.Conn DHB.13 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 10/12/26 10/12/26 1.2 1.2
0%
152.5
RPL06.WP4.011720 RPL06.Conn DHB.14 Pull Trunk (192F) [FSW<>SSW] FSW<>SSW Not Started 10/12/26 10/12/26 1.2 1.2
0%
152.5
RPL06.WP4.012220 RPL06.Conn DHB.13.09<>09 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 10/12/26 10/14/26 3.8 3.8
0%
142.5
RPL06.WP4.012240 RPL06.Conn DHB.14.13<>13 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Across-Row Not Started 10/12/26 10/14/26 3.8 3.8
0%
142.5
RPL06.WP4.012260 RPL06.Conn DHB.13 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 10/12/26 10/14/26 3.8 3.8
0%
161.2
RPL06.WP4.012280 RPL06.Conn DHB.14 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] In-Rack Not Started 10/12/26 10/14/26 3.8 3.8
0%
161.2
RPL06.CON.WP2.07920 RPL06.Conn - EF2<>MDF2 (North) Install Cabling (Pull, Splice & Terminate) OSP (MDF RPL10 <> MDF RPL06) Not Started 10/13/26 10/20/26 7.5 7.5
0%
272.5
RPL06.CX.MCUP.01270 RPL06.CX.mCup Loop 2 - L3/L4 - mCUP - Flush and Fill - mCup5 and Dry Coolers Fill and Flush Not Started 10/13/26 10/20/26 7.5 7.5
0%
98.8
RPL06.CX.MCUP.01330 RPL06.CX.mCup Loop 2 - L3/L4 - mCUP - Flush and Fill - mCup6 and Dry Coolers Fill and Flush Not Started 10/13/26 10/20/26 7.5 7.5
0%
98.8
RPL06.INT.DHA.01440 RPL06.Interior.DHA - Control Fault Domain 3 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 10/13/26 11/02/26 18.8 18.8
0%
55.0
RPL06.INT.DHA.01450 RPL06.Interior.DHA - Control Fault Domain 3 - Pull EPMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 10/13/26 11/02/26 18.8 18.8
0%
55.0
RPL06.INT.DHA.01460 RPL06.Interior.DHA - Control Fault Domain 3 - Set UPS and Panel (2) and GS.IDF A1 (Stick Built) Remaining Tie-ins post Mech Side Aisle install Not Started 10/13/26 11/02/26 18.8 18.8
0%
48.8
RPL06.INT.DHB.01710 RPL06.Interior.DHB - Control Fault Domain 3 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 10/13/26 11/02/26 18.8 18.8
0%
41.2
RPL06.INT.ENDC.1540 RPL06.Interior.End-Corridor - BoW - QC - Backings/Walls Balance of Walls & Overhead Not Started 10/13/26 10/19/26 6.2 6.2
0%
131.2
RPL06.WP3B.012080 RPL06.Conn EF2<>DHB.14 Pull Pigtails (384F) P2&3 (LV) EF2<>DHB.14 Not Started 10/13/26 10/14/26 2.5 2.5
0%
80.0
RPL06.WP3B.012560 RPL06.Conn EF1<>DHA.02 Install (A-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.02 Not Started 10/13/26 10/13/26 1.2 1.2
0%
152.5
RPL06.WP3B.013500 RPL06.Conn EF2<>DHB.13 Install (A-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.13 Not Started 10/13/26 10/13/26 1.2 1.2
0%
140.0
RPL06.WP4.011980 RPL06.Conn DHB.13 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 10/13/26 10/13/26 1.2 1.2
0%
152.5
RPL06.WP4.012000 RPL06.Conn DHB.14 Pull Trunk (384F) [RSW<>FSW] Trunks Not Started 10/13/26 10/13/26 1.2 1.2
0%
152.5
RPL06.WP4.012140 RPL06.Conn DHA.01.01<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Across-Row Not Started 10/13/26 10/13/26 1.2 1.2
0%
172.5
RPL06.WP4.012160 RPL06.Conn DHA.02.05<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 10/13/26 10/13/26 1.2 1.2
0%
172.5
RPL06.WP4.012180 RPL06.Conn DHA.01.03<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Across-Row Not Started 10/13/26 10/15/26 3.8 3.8
0%
157.5
RPL06.WP4.012200 RPL06.Conn DHA.02.07<>07 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] Jumpers Not Started 10/13/26 10/15/26 3.8 3.8
0%
157.5
RPL06.CON.WP2.08000 RPL06.Conn - EF1<>MDF1 (South) Install Cabling (Pull, Splice & Terminate) OSP (MDF RPL10 <> MDF RPL06) Not Started 10/14/26 10/21/26 7.5 7.5
0%
275.0
RPL06.CX.DHB.01200 RPL06.CX.DHB - L3/L4 - Remaining Electrical Equipment DHB ELECTRICAL Not Started 10/14/26 10/20/26 6.2 6.2
0%
140.0
RPL06.INT.CTRC.06820 RPL06.Interior.Center-Corridor - Final Finishes & Fixtures - Hang Drywall Wall & Ceiling and Fire/Caulking Restrooms Not Started 10/14/26 10/20/26 6.2 6.2
0%
50.0
RPL06.INT.CTRC.06840 RPL06.Interior.Center-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (P Restrooms Not Started 10/14/26 10/20/26 6.2 6.2
0%
37.5
RPL06.INT.CTRC.1560 RPL06.Interior.Center-Corridor - BoW - Hang Drywall Balance of Walls & Overhead Not Started 10/14/26 10/22/26 8.8 8.8
0%
50.0
RPL06.INT.ENDC.01400 RPL06.Interior.End-Corridor - Electrical L2 Checklist Completion Fit out Not Started 10/14/26 10/27/26 12.5 12.5
0%
177.5
RPL06.INT.ENDC.06900 RPL06.Interior.End-Corridor - Final Finishes & Fixtures - Mechanical L2 Checklist Completion Restrooms Not Started 10/14/26 10/27/26 12.5 12.5
0%
190.0
RPL06.INT.SBC.03640 RPL06.Interior.SSB-Corridor - BoW - Install Vertical Tube Steel Support for Cable Tray (IFP Add) Balance of Walls & Overhead Not Started 10/14/26 10/20/26 6.2 6.2
0%
63.8
RPL06.INT.SSB.01600 RPL06.Interior.SSB - Loading Dock and Storage - Mechanical L2 Checklist Completion Loading Dock and Storage Not Started 10/14/26 10/27/26 12.5 12.5
0%
146.2
RPL06.INT.SSB.06380 RPL06.Interior.SSB LO #16 - Install Flooring Tiles/Resinous Flooring in specific rooms Leave Out Wall #16 (SSB - North of Loading Dock) Not Started 10/14/26 10/16/26 3.8 3.8
0%
68.8
RPL06.INT.SSB.14600 RPL06.Interior.SSB LO #01 to #05 - Install Asset Tags Finishes Not Started 10/14/26 10/22/26 8.8 8.8
0%
72.5
RPL06.WP3B.014000 RPL06.Conn EF1<>DHA.02 Splice (A-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.02 Not Started 10/14/26 10/21/26 7.5 7.5
0%
152.5
RPL06.WP3B.014940 RPL06.Conn EF2<>DHB.13 Splice (A-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.13 Not Started 10/14/26 10/21/26 7.5 7.5
0%
140.0
RPL06.WP3B.015440 RPL06.Conn EF1<>DHA.02 Install (Z-End) Pigtails (384F) P1&4 (LV) EF1<>DHA.02 Not Started 10/14/26 10/14/26 1.2 1.2
0%
152.5
RPL06.WP3B.016380 RPL06.Conn EF2<>DHB.13 Install (Z-End) Pigtails (384F) P2&3 (LV) EF2<>DHB.13 Not Started 10/14/26 10/14/26 1.2 1.2
0%
140.0
RPL06.WP4.012340 RPL06.Conn DHB.11.04<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 10/14/26 10/14/26 1.2 1.2
0%
157.5
RPL06.WP4.012360 RPL06.Conn DHB.12.08<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] Across-Row Not Started 10/14/26 10/14/26 1.2 1.2
0%
157.5
RPL06.CX.DHA.01320 RPL06.CX.DHA - L3/L4 - Control Fault Domain 02 - FW Flush and Fill Control Fault Domain 2 Not Started 10/15/26 10/23/26 8.8 8.8
0%
65.0
RPL06.CX.DHB.01280 RPL06.CX.DHB - L3/L4 - Control Fault Domain 01 - TW Flush and Fill Control Fault Domain 1 Not Started 10/15/26 10/26/26 10.0 10.0
0%
43.8
RPL06.CX.DHB.01320 RPL06.CX.DHB - L3/L4 - Control Fault Domain 02 - FW Flush and Fill Control Fault Domain 2 Not Started 10/15/26 10/23/26 8.8 8.8
0%
45.0
RPL06.INT.CC.9060 RPL06.Interior.CC Ext. LO #17 - Duct Drops / Trim out Exterior Leave Out Wall #17 (CC - South) Not Started 10/15/26 10/16/26 2.5 2.5
0%
67.5
RPL06.INT.CC.9080 RPL06.Interior.CC Ext. LO #17 - Install Remaining Refrigerant Line Exterior Leave Out Wall #17 (CC - South) Not Started 10/15/26 10/15/26 1.2 1.2
0%
96.2
RPL06.INT.CC.9100 RPL06.Interior.CC Ext. LO #17 - Install Remaining Lights Exterior Leave Out Wall #17 (CC - South) Not Started 10/15/26 10/20/26 5.0 5.0
0%
67.5
RPL06.INT.CC.9120 RPL06.Interior.CC Ext. LO #17 - Fire Safing / Wall Finishes Exterior Leave Out Wall #17 (CC - South) Not Started 10/15/26 10/19/26 3.8 3.8
0%
65.0
RPL06.INT.CC.9220 RPL06.Interior.CC Ext. LO #17 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? Exterior Leave Out Wall #17 (CC - South) Not Started 10/15/26 10/19/26 3.8 3.8
0%
68.8
RPL06.INT.DHA.03700 RPL06.Interior.DHA - OFE - Control Fault Domain 4 (Mech Side Aisle) Control Fault Domain 4 Not Started 10/15/26 10/29/26 13.8 13.8
0%
13.8
RPL06.INT.DHB.02660 RPL06.Interior.DHB - OFE - Control Fault Domain 5 (HAC) Control Fault Domain 5 Not Started 10/15/26 10/30/26 15.0 15.0
0%
2.5