Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.INT.SBC.03920 |
RPL06.Interior.SSB-Corridor - BoW - Install Asset Tags & QC | Balance of Walls & Overhead | Not Started | 10/15/26 | 10/23/26 | 8.8 | 8.8 |
|
73.8 |
RPL06.INT.SSB.02200 |
RPL06.Interior.SSB - Final Finishes & Fixtures - Mechanical L2 Checklist Completion | Final Finishes & Fixtures (Includes TFW, Restrooms, etc.) | Not Started | 10/15/26 | 10/28/26 | 12.5 | 12.5 |
|
235.0 |
RPL06.WP3B.013520 |
RPL06.Conn EF2<>DHB.14 Install (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.14 | Not Started | 10/15/26 | 10/15/26 | 1.2 | 1.2 |
|
137.5 |
RPL06.WP4.012420 |
RPL06.Conn DHB.13.09<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 10/15/26 | 10/15/26 | 1.2 | 1.2 |
|
157.5 |
RPL06.WP4.012440 |
RPL06.Conn DHB.14.13<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 10/15/26 | 10/15/26 | 1.2 | 1.2 |
|
157.5 |
RPL06.WP4.012540 |
RPL06.Conn DHB.13.11<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 10/15/26 | 10/19/26 | 3.8 | 3.8 |
|
142.5 |
RPL06.WP4.012560 |
RPL06.Conn DHB.14.15<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 10/15/26 | 10/19/26 | 3.8 | 3.8 |
|
142.5 |
RPL06.EY.DHA.01610 |
RPL06.EY.DHC - Install Electrical Tie-ins | Build back Exterior Leave Out #17 (South) | Not Started | 10/16/26 | 10/22/26 | 6.2 | 6.2 |
|
125.0 |
RPL06.INT.CTRC.1900 |
RPL06.Interior.Center-Corridor - BoW - F/R/P Pads | Balance of Walls & Overhead | Not Started | 10/16/26 | 10/22/26 | 6.2 | 6.2 |
|
50.0 |
RPL06.INT.DHA.01480 |
RPL06.Interior.DHA - Control Fault Domain 2 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/16/26 | 11/05/26 | 18.8 | 18.8 |
|
45.0 |
RPL06.INT.DHB.01670 |
RPL06.Interior.DHB - Control Fault Domain 4 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/16/26 | 11/05/26 | 18.8 | 18.8 |
|
41.2 |
RPL06.INT.DHB.01680 |
RPL06.Interior.DHB - Control Fault Domain 4 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/16/26 | 11/05/26 | 18.8 | 18.8 |
|
41.2 |
RPL06.INT.DHB.01690 |
RPL06.Interior.DHB - Control Fault Domain 4 - Set UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/16/26 | 11/05/26 | 18.8 | 18.8 |
|
35.0 |
RPL06.WP3B.014960 |
RPL06.Conn EF2<>DHB.14 Splice (A-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.14 | Not Started | 10/16/26 | 10/23/26 | 7.5 | 7.5 |
|
137.5 |
RPL06.WP3B.016400 |
RPL06.Conn EF2<>DHB.14 Install (Z-End) Pigtails (384F) P2&3 (LV) | EF2<>DHB.14 | Not Started | 10/16/26 | 10/16/26 | 1.2 | 1.2 |
|
137.5 |
RPL06.WP4.012380 |
RPL06.Conn DHA.01.03<>03 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 10/16/26 | 10/16/26 | 1.2 | 1.2 |
|
170.0 |
RPL06.WP4.012400 |
RPL06.Conn DHA.02.07<>07 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 10/16/26 | 10/16/26 | 1.2 | 1.2 |
|
170.0 |
RPL06.WP4.012580 |
RPL06.Conn DHA.01.02<>01 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 10/16/26 | 10/21/26 | 5.0 | 5.0 |
|
157.5 |
RPL06.WP4.012600 |
RPL06.Conn DHA.02.06<>05 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 10/16/26 | 10/21/26 | 5.0 | 5.0 |
|
157.5 |
GCD.RPL06.4625 |
L3/L4 Start - DHA Rows 01-08 | DH | Not Started | 10/19/26 | 10/19/26 | 0.0 | 0.0 |
|
155.0 |
GCD.RPL06.4965 |
L3/L4 Start EY - DHD | EY | Not Started | 10/19/26 | 10/19/26 | 0.0 | 0.0 |
|
238.8 |
GCD.RPL06.5845 |
RMU Loop Ready for Energization - DHD Loop | EY | Not Started | 10/19/26 | 10/19/26 | 0.0 | 0.0 |
|
93.8 |
RPL06.CX.DHA.01040 |
RPL06.CX.DHA - L3/L4 - Elec. Domain 01/02 | DHA ELECTRICAL | Not Started | 10/19/26 | 10/27/26 | 8.8 | 8.8 |
|
28.8 |
RPL06.CX.DHD.00000 |
RPL06.CX.DHD - L3, L4, IST - WBS Summary | DHD | Not Started | 10/19/26 | 08/18/27 | 260.0 | 260.0 |
|
72.5 |
RPL06.CX.DHD.01000 |
RPL06.CX.DHD - L3 - WBS Summary (Electrical) | DHD ELECTRICAL | Not Started | 10/19/26 | 03/29/27 | 135.0 | 135.0 |
|
103.8 |
RPL06.CX.DHD.01010 |
RPL06.CX.DHD - L3/L4 - MV Skids (8) Loop | DHD ELECTRICAL | Not Started | 10/19/26 | 10/28/26 | 10.0 | 10.0 |
|
93.8 |
RPL06.EY.DHA.01430 |
RPL06.EY.DHA - Install Irrigation | Hardscape and Landscape | Not Started | 10/19/26 | 10/30/26 | 12.5 | 12.5 |
|
320.0 |
RPL06.EY.DHA.01440 |
RPL06.EY.DHA - Install Exterior Signage | Hardscape and Landscape | Not Started | 10/19/26 | 10/30/26 | 12.5 | 12.5 |
|
176.2 |
RPL06.EY.DHB.01480 |
RPL06.EY.DHB - Install Landscaping | Hardscape and Landscape | Not Started | 10/19/26 | 10/30/26 | 12.5 | 12.5 |
|
332.5 |
RPL06.EY.DHC.01300 |
RPL06.EY.DHC - Install Sleeves MEPL | Hardscape and Landscape | Not Started | 10/19/26 | 10/23/26 | 6.2 | 6.2 |
|
240.0 |
RPL06.EY.DHC.01320 |
RPL06.EY.DHC - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 10/19/26 | 04/01/27 | 138.8 | 138.8 |
|
206.2 |
RPL06.EY.DHD.01340 |
RPL06.EY.DHD - Install Lighting | Hardscape and Landscape | Not Started | 10/19/26 | 10/30/26 | 12.5 | 12.5 |
|
241.2 |
RPL06.INT.SSB.02620 |
RPL06.Interior.SSB - BoW - ACT - Install ACT Tiles | Balance of Walls and OverHead | Not Started | 10/19/26 | 10/23/26 | 6.2 | 6.2 |
|
120.0 |
RPL06.INT.SSB.06400 |
RPL06.Interior.SSB LO #16 - Electrical L2 Checklist Completion | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 10/19/26 | 10/30/26 | 12.5 | 12.5 |
|
68.8 |
RPL06.INT.SSB.06420 |
RPL06.Interior.SSB LO #16 - Mechanical L2 Checklist Completion | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 10/19/26 | 10/30/26 | 12.5 | 12.5 |
|
68.8 |
RPL06.CON.WP2.08720 |
RPL06.Conn - GSIDF/DH B1 - WBS Summary | Int. IDF Stick Built - GSIDF6B1 | Not Started | 10/20/26 | 11/05/26 | 16.2 | 16.2 |
|
327.5 |
RPL06.CON.WP2.08740 |
RPL06.Conn - GSIDF/DH B1 - Install Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 10/20/26 | 10/23/26 | 5.0 | 5.0 |
|
137.5 |
RPL06.INT.CC.9140 |
RPL06.Interior.CC Ext. LO #17 - Electrical Trim Out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 10/20/26 | 10/20/26 | 1.2 | 1.2 |
|
65.0 |
RPL06.INT.CC.9160 |
RPL06.Interior.CC Ext. LO #17 - Security Trim Out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 10/20/26 | 10/20/26 | 1.2 | 1.2 |
|
65.0 |
RPL06.INT.DHA.01500 |
RPL06.Interior.DHA - Control Fault Domain 3 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/20/26 | 11/09/26 | 18.8 | 18.8 |
|
73.8 |
RPL06.INT.DHA.01530 |
RPL06.Interior.DHA - Control Fault Domain 3 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/20/26 | 11/09/26 | 18.8 | 18.8 |
|
48.8 |
RPL06.INT.ENDC.1560 |
RPL06.Interior.End-Corridor - BoW - Hang Drywall | Balance of Walls & Overhead | Not Started | 10/20/26 | 10/28/26 | 8.8 | 8.8 |
|
131.2 |
RPL06.WP3B.016860 |
RPL06.Conn EF1<>DHA.01 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.01 | Not Started | 10/20/26 | 10/21/26 | 2.5 | 2.5 |
|
78.8 |
RPL06.WP4.012860 |
RPL06.Conn DHB.13.11<>11 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 10/20/26 | 10/20/26 | 1.2 | 1.2 |
|
155.0 |
RPL06.WP4.012880 |
RPL06.Conn DHB.14.15<>15 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Across-Row | Not Started | 10/20/26 | 10/20/26 | 1.2 | 1.2 |
|
155.0 |
RPL06.WP4.012940 |
RPL06.Conn DHB.13.10<>09 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 10/20/26 | 10/23/26 | 5.0 | 5.0 |
|
142.5 |
RPL06.WP4.012960 |
RPL06.Conn DHB.14.14<>13 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 10/20/26 | 10/23/26 | 5.0 | 5.0 |
|
142.5 |
GCD.RPL06.2606 |
L3/L4 Start - DHB Rows 09-16 | DH | Not Started | 10/21/26 | 10/21/26 | 0.0 | 0.0 |
|
140.0 |
RPL06.CON.WP2.07940 |
RPL06.Conn - GSMDF2 (North) Test Network (FIM) | Network | Not Started | 10/21/26 | 10/23/26 | 3.8 | 3.8 |
|
272.5 |
RPL06.CX.DHA.01060 |
RPL06.CX.DHA - L3/L4 - UPS Start-up | DHA ELECTRICAL | Not Started | 10/21/26 | 11/03/26 | 12.5 | 12.5 |
|
76.2 |
RPL06.CX.DHB.01080 |
RPL06.CX.DHB - L3/L4 - Elec. Domain 03/04 | DHB ELECTRICAL | Not Started | 10/21/26 | 10/26/26 | 5.0 | 5.0 |
|
43.8 |
RPL06.CX.MCUP.01370 |
RPL06.CX.mCup Loop 2 - L3/L4 - mCUP - Flush and Fill - DHD & DHC (Phase 4) | Fill and Flush | Not Started | 10/21/26 | 10/27/26 | 6.2 | 6.2 |
|
98.8 |
RPL06.INT.CTRC.06860 |
RPL06.Interior.Center-Corridor - Final Finishes & Fixtures - Install Cement Board/ Drywall | Restrooms | Not Started | 10/21/26 | 10/27/26 | 6.2 | 6.2 |
|
37.5 |
RPL06.INT.SBC.03660 |
RPL06.Interior.SSB-Corridor - BoW - Install Horizontal Steel Supports for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 10/21/26 | 10/26/26 | 5.0 | 5.0 |
|
63.8 |
RPL06.WP4.012740 |
RPL06.Conn DHA.01.02 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/21/26 | 11/03/26 | 12.5 | 12.5 |
|
128.8 |
RPL06.WP4.012760 |
RPL06.Conn DHA.02.06 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/21/26 | 11/03/26 | 12.5 | 12.5 |
|
128.8 |
RPL06.WP4.012820 |
RPL06.Conn DHB.11.03 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/21/26 | 11/03/26 | 12.5 | 12.5 |
|
128.8 |
RPL06.WP4.012840 |
RPL06.Conn DHB.12.07 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/21/26 | 11/03/26 | 12.5 | 12.5 |
|
128.8 |
RPL06.INT.CC.9180 |
RPL06.Interior.CC Ext. LO #17 - Plumbing Trim Out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 10/22/26 | 10/22/26 | 1.2 | 1.2 |
|
65.0 |
RPL06.INT.CC.9200 |
RPL06.Interior.CC Ext. LO #17 - Fire Life Safety Trim Out | Exterior Leave Out Wall #17 (CC - South) | Not Started | 10/22/26 | 10/22/26 | 1.2 | 1.2 |
|
65.0 |
RPL06.INT.DHB.02680 |
RPL06.Interior.DHB - OFE - Control Fault Domain 5 (Mech Side Aisle) | Control Fault Domain 5 | Not Started | 10/22/26 | 11/04/26 | 12.5 | 12.5 |
|
17.5 |
RPL06.WP3B.016880 |
RPL06.Conn EF1<>DHA.02 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.02 | Not Started | 10/22/26 | 10/23/26 | 2.5 | 2.5 |
|
152.5 |
RPL06.WP3B.017820 |
RPL06.Conn EF2<>DHB.13 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.13 | Not Started | 10/22/26 | 10/23/26 | 2.5 | 2.5 |
|
140.0 |
RPL06.WP4.013040 |
RPL06.Conn DHA.01.02<>01 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 10/22/26 | 10/22/26 | 1.2 | 1.2 |
|
161.2 |
RPL06.WP4.013060 |
RPL06.Conn DHA.02.06<>05 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 10/22/26 | 10/22/26 | 1.2 | 1.2 |
|
161.2 |
RPL06.WP4.013100 |
RPL06.Conn DHA.01.04<>03 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 10/22/26 | 10/27/26 | 5.0 | 5.0 |
|
157.5 |
RPL06.WP4.013120 |
RPL06.Conn DHA.02.08<>07 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 10/22/26 | 10/27/26 | 5.0 | 5.0 |
|
157.5 |
RPL06.CON.WP4.03200 |
RPL06.Conn WP4 FENW DHA CFD2 Infrastructure | Infrastructure | Not Started | 10/23/26 | 11/20/26 | 25.0 | 25.0 |
|
141.2 |
RPL06.EY.DHA.01570 |
RPL06.EY.DHC - Install BMS Tie-ins | Build back Exterior Leave Out #17 (South) | Not Started | 10/23/26 | 11/05/26 | 12.5 | 12.5 |
|
125.0 |
RPL06.INT.CC.9240 |
RPL06.Interior.CC Ext. LO #17 - Install Asset Tags | Exterior Leave Out Wall #17 (CC - South) | Not Started | 10/23/26 | 10/23/26 | 1.2 | 1.2 |
|
65.0 |
RPL06.INT.CTRC.1580 |
RPL06.Interior.Center-Corridor - BoW - Tape Finish Paint | Balance of Walls & Overhead | Not Started | 10/23/26 | 10/27/26 | 3.8 | 3.8 |
|
50.0 |
RPL06.INT.DHA.01340 |
RPL06.Conn DHA - CFD2 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 10/23/26 | 10/27/26 | 3.8 | 3.8 |
|
72.5 |
RPL06.INT.DHA.01550 |
RPL06.Interior.DHA - Control Fault Domain 4 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/23/26 | 11/13/26 | 18.8 | 18.8 |
|
48.8 |
RPL06.INT.DHA.01560 |
RPL06.Interior.DHA - Control Fault Domain 4 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/23/26 | 11/13/26 | 18.8 | 18.8 |
|
42.5 |
RPL06.INT.DHA.02240 |
RPL06.Interior.DHA - Control Fault Domain 4 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/23/26 | 11/13/26 | 18.8 | 18.8 |
|
42.5 |
RPL06.INT.DHA.03840 |
RPL06.Interior.DHA - Control Fault Domain 4 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/23/26 | 11/13/26 | 18.8 | 18.8 |
|
42.5 |
RPL06.INT.DHA.03900 |
RPL06.Conn DHA - CFD2 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 10/23/26 | 10/27/26 | 3.8 | 3.8 |
|
138.8 |
RPL06.INT.DHB.01730 |
RPL06.Interior.DHB - Control Fault Domain 4 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/23/26 | 11/13/26 | 18.8 | 18.8 |
|
52.5 |
RPL06.INT.DHB.01760 |
RPL06.Interior.DHB - Control Fault Domain 4 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 10/23/26 | 11/13/26 | 18.8 | 18.8 |
|
35.0 |
RPL06.INT.SSB.02960 |
RPL06.Interior.SSB - Loading Dock and Storage - Install Flooring | Loading Dock and Storage | Not Started | 10/23/26 | 10/29/26 | 6.2 | 6.2 |
|
138.8 |
RPL06.INT.SSB.14620 |
RPL06.Interior.SSB LO #01 to #05 - Install Door (Verify with Trades before installation) | Finishes | Not Started | 10/23/26 | 11/02/26 | 8.8 | 8.8 |
|
72.5 |
RPL06.OFCI.6960 |
OFCI Delivery: FE Fiber for CFD A.3 (ROJ ) (RVCD ) | Data Hall A | Not Started | 10/23/26 | 11/13/26 | 18.8 | 18.8 |
|
75.0 |
RPL06.WP4.013140 |
RPL06.Conn DHB.14.14 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/23/26 | 11/05/26 | 12.5 | 12.5 |
|
113.8 |
RPL06.WP4.015020 |
RPL06.Conn DHB.13.10 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 10/23/26 | 11/05/26 | 12.5 | 12.5 |
|
113.8 |
GCD.RPL06.5885 |
RMU Loop Ready for Energization - DHC Loop | EY | Not Started | 10/26/26 | 10/26/26 | 0.0 | 0.0 |
|
103.8 |
RPL06.CON.WP2.08020 |
RPL06.Conn - GSMDF1 (South) Test Network (FIM) | Network | Not Started | 10/26/26 | 10/28/26 | 3.8 | 3.8 |
|
272.5 |
RPL06.CON.WP2.08760 |
RPL06.Conn - GSIDF/DH B1 - Install Cabling (Pull, Splice & terminate) | Cabling | Not Started | 10/26/26 | 11/02/26 | 7.5 | 7.5 |
|
328.8 |
RPL06.CON.WP2.08800 |
RPL06.Conn - GSIDF/DH B1 - Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 10/26/26 | 11/05/26 | 11.2 | 11.2 |
|
137.5 |
RPL06.CX.DHA.01070 |
RPL06.CX.DHA - L3/L4 - House Power (for mechainical) | DHA HOUSE POWER | Not Started | 10/26/26 | 11/06/26 | 12.5 | 12.5 |
|
18.8 |
RPL06.CX.DHB.01100 |
RPL06.CX.DHB - L3/L4 - Control Fault Domain 01 | Control Fault Domain 1 | Not Started | 10/26/26 | 12/02/26 | 31.2 | 31.2 |
|
18.8 |
RPL06.CX.DHB.01380 |
RPL06.CX.DHB - L3/L4 - Control Fault Domain 03 - FW Flush and Fill | Control Fault Domain 3 | Not Started | 10/26/26 | 11/03/26 | 8.8 | 8.8 |
|
46.2 |
RPL06.EY.DHC.01330 |
RPL06.EY.DHC - Install Early EY Paving | Hardscape and Landscape | Not Started | 10/26/26 | 10/30/26 | 6.2 | 6.2 |
|
240.0 |
RPL06.EY.ENDC.1950 |
RPL06.EY.DHD.T1 - HAC Prefab prior to install for DH D | Tent 1 | Not Started | 10/26/26 | 10/30/26 | 6.2 | 6.2 |
|
12.5 |
RPL06.INT.SBC.03680 |
RPL06.Interior.SSB-Corridor - BoW - Install Door (Verify with Trades before installation) | Balance of Walls & Overhead | Not Started | 10/26/26 | 11/03/26 | 8.8 | 8.8 |
|
73.8 |
RPL06.INT.SSB.03160 |
RPL06.Interior.SSB - BoW - Final Paint | Balance of Walls and OverHead | Not Started | 10/26/26 | 10/30/26 | 6.2 | 6.2 |
|
120.0 |
RPL06.WP3B.017840 |
RPL06.Conn EF2<>DHB.14 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.14 | Not Started | 10/26/26 | 10/27/26 | 2.5 | 2.5 |
|
137.5 |
RPL06.WP4.013400 |
RPL06.Conn DHB.13.10<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 10/26/26 | 10/26/26 | 1.2 | 1.2 |
|
146.2 |
RPL06.WP4.013420 |
RPL06.Conn DHB.14.14<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 10/26/26 | 10/26/26 | 1.2 | 1.2 |
|
146.2 |
RPL06.WP4.013520 |
RPL06.Conn DHB.13.12<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 10/26/26 | 10/29/26 | 5.0 | 5.0 |
|
142.5 |
RPL06.WP4.013540 |
RPL06.Conn DHB.14.16<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Jumpers | Not Started | 10/26/26 | 10/29/26 | 5.0 | 5.0 |
|
142.5 |