Schedule Viewer
Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
2
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.INT.DHA.03920 |
RPL06.Conn DHA - CFD3 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 11/10/26 | 11/13/26 | 3.8 | 3.8 |
|
123.8 |
RPL06.INT.ENDC.1800 |
RPL06.Interior.End-Corridor - BoW - Install Door (Verify with Trades before installation) | Balance of Walls & Overhead | Not Started | 11/10/26 | 11/19/26 | 8.8 | 8.8 |
|
150.0 |
RPL06.INT.SSB.14660 |
RPL06.Interior.SSB LO #01 to #05 - Mechanical L2 Checklist Completion | Finishes | Not Started | 11/10/26 | 11/24/26 | 12.5 | 12.5 |
|
72.5 |
RPL06.WP3B.016900 |
RPL06.Conn EF1<>DHA.03 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.03 | Not Started | 11/10/26 | 11/12/26 | 2.5 | 2.5 |
|
72.5 |
RPL06.WP4.015480 |
RPL06.Conn DHB.15.19<>19 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 11/10/26 | 11/10/26 | 1.2 | 1.2 |
|
136.2 |
RPL06.WP4.015500 |
RPL06.Conn DHB.16.23<>23 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 11/10/26 | 11/10/26 | 1.2 | 1.2 |
|
136.2 |
RPL06.WP4.015640 |
RPL06.Conn DHB.15.18<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/10/26 | 11/16/26 | 5.0 | 5.0 |
|
123.8 |
RPL06.WP4.015660 |
RPL06.Conn DHB.16.22<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/10/26 | 11/16/26 | 5.0 | 5.0 |
|
123.8 |
RPL06.CON.WP2.11060 |
RPL06.Conn - GSMDF1(South)<>DH B - CFD3 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 11/12/26 | 11/16/26 | 3.8 | 3.8 |
|
126.2 |
RPL06.CON.WP2.12060 |
RPL06.Conn - GSMDF2(North)<>DH B - CFD3 Rack #50 Pull, Install & Test PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 11/12/26 | 11/16/26 | 3.8 | 3.8 |
|
126.2 |
RPL06.CX.MCUP.01110 |
RPL06.CX.mCup Loop 2 - L3/L4 - mCUP - IST System Testing | mCUP 5-6 | Not Started | 11/12/26 | 11/25/26 | 12.5 | 12.5 |
|
238.8 |
RPL06.INT.CTRC.1780 |
RPL06.Interior.Center-Corridor - BoW - Install Asset Tags | Balance of Walls & Overhead | Not Started | 11/12/26 | 11/20/26 | 8.8 | 8.8 |
|
50.0 |
RPL06.INT.SSB.01640 |
RPL06.Interior.SSB - Loading Dock and Storage - Final Punch Walk | Loading Dock and Storage | Not Started | 11/12/26 | 11/13/26 | 2.5 | 2.5 |
|
138.8 |
RPL06.INT.SSB.06480 |
RPL06.Interior.SSB LO #16 - Final Clean | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 11/12/26 | 11/17/26 | 5.0 | 5.0 |
|
68.8 |
RPL06.WP3B.016920 |
RPL06.Conn EF1<>DHA.04 Test Pigtails (384F) P1&4 (LV) | EF1<>DHA.04 | Not Started | 11/12/26 | 11/13/26 | 2.5 | 2.5 |
|
135.0 |
RPL06.WP4.015360 |
RPL06.Conn DHA.03.10 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 11/12/26 | 11/25/26 | 12.5 | 12.5 |
|
110.0 |
RPL06.WP4.015380 |
RPL06.Conn DHA.04.14 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 11/12/26 | 11/25/26 | 12.5 | 12.5 |
|
110.0 |
RPL06.CX.DHD.01050 |
RPL06.CX.DHD - L3/L4 - House Power (for mechainical) | DHD HOUSE POWER | Not Started | 11/13/26 | 11/30/26 | 12.5 | 12.5 |
|
123.8 |
RPL06.INT.CTRC.07160 |
RPL06.Interior.Center-Corridor (N) - Install Cable Tray - North (Remaining at LO) | Fit out (North) | Not Started | 11/13/26 | 11/19/26 | 6.2 | 6.2 |
|
31.2 |
RPL06.INT.CTRC.2500 |
RPL06.Interior.Center-Corridor LO #11 & #13 - Close Interior LO #11 & #13 DHA/CC (For HACs in DHA) WBS Summary | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 11/13/26 | 01/19/27 | 53.8 | 53.8 |
|
18.8 |
RPL06.INT.CTRC.3540 |
RPL06.Interior.Center-Corridor LO #11 & #13 - Install IMP Wall at Leave Out (DH A) | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 11/13/26 | 11/17/26 | 3.8 | 3.8 |
|
-10.0 |
RPL06.INT.CTRC.3560 |
RPL06.Interior.Center-Corridor LO #11 & #13 - Tie In MEPF with IMP Wall buildback | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 11/13/26 | 11/18/26 | 5.0 | 5.0 |
|
-10.0 |
RPL06.INT.SSBC.01380 |
RPL06.Interior.SSB-Corridor - Install & QC Asset Tagging | Fit out | Not Started | 11/13/26 | 11/16/26 | 2.5 | 2.5 |
|
135.0 |
RPL06.INT.SSBC.01440 |
RPL06.Interior.SSB-Corridor - Electrical L2 Checklist Completion | Fit out | Not Started | 11/13/26 | 11/30/26 | 12.5 | 12.5 |
|
67.5 |
RPL06.OFCI.6980 |
OFCI Delivery: FE Fiber for CFD A.4 (ROJ ) (RVCD ) | Data Hall A | Not Started | 11/13/26 | 12/07/26 | 18.8 | 18.8 |
|
62.5 |
RPL06.WP3B.017860 |
RPL06.Conn EF2<>DHB.15 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.15 | Not Started | 11/13/26 | 11/16/26 | 2.5 | 2.5 |
|
76.2 |
RPL06.WP4.015920 |
RPL06.Conn DHA.03.10<>09 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/13/26 | 11/13/26 | 1.2 | 1.2 |
|
142.5 |
RPL06.WP4.015940 |
RPL06.Conn DHA.04.14<>13 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/13/26 | 11/13/26 | 1.2 | 1.2 |
|
142.5 |
RPL06.WP4.016080 |
RPL06.Conn DHA.03.12<>11 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/13/26 | 11/18/26 | 5.0 | 5.0 |
|
138.8 |
RPL06.WP4.016100 |
RPL06.Conn DHA.04.16<>15 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/13/26 | 11/18/26 | 5.0 | 5.0 |
|
138.8 |
GCD.RPL06.4125 |
[RPL06] TC-C Ready : Production Cabling Start [DHA Rows 17-24] | TC-C Ready: Production Cabling - DHA | Not Started | 11/16/26 | 11/16/26 | 0.0 | 0.0 |
|
321.2 |
RPL06.CON.WP2.13060 |
RPL06.Conn - GSMDF1(South)<>DH A - CFD3 Rack #50 Pull, Install & Test PON Trunks | MDF1 <> DH A - Rack#50 LV side | Not Started | 11/16/26 | 11/18/26 | 3.8 | 3.8 |
|
136.2 |
RPL06.CON.WP2.14060 |
RPL06.Conn - GSMDF2(North)<>DH A - CFD3 Rack #01 Pull, Install & Test PON Trunks | MDF2 <> DH A - Rack#01 MES side | Not Started | 11/16/26 | 11/18/26 | 3.8 | 3.8 |
|
136.2 |
RPL06.CON.WP3B.02060 |
RPL06.Conn EF1<>DHA.05 - WBS Summary | EF1<>DHA.05 | Not Started | 11/16/26 | 12/01/26 | 12.5 | 12.5 |
|
75.0 |
RPL06.CON.WP4.01600 |
RPL06.Conn WP4 FENW DHB CFD4 Infrastructure | Infrastructure | Not Started | 11/16/26 | 12/15/26 | 25.0 | 25.0 |
|
110.0 |
RPL06.CX.DHA.01220 |
RPL06.CX.DHA - L3/L4 - Remaining Electrical Equipment | DHA ELECTRICAL | Not Started | 11/16/26 | 11/20/26 | 6.2 | 6.2 |
|
125.0 |
RPL06.CX.DHA.01340 |
RPL06.CX.DHA - L3/L4 - Control Fault Domain 02 - TW Flush and Fill | Control Fault Domain 2 | Not Started | 11/16/26 | 11/25/26 | 10.0 | 10.0 |
|
47.5 |
RPL06.CX.DHA.01560 |
RPL06.CX.DHA - L3/L4 - Control Fault Domain 04 - FW Flush and Fill | Control Fault Domain 4 | Not Started | 11/16/26 | 11/24/26 | 8.8 | 8.8 |
|
58.8 |
RPL06.INT.CTRC.06920 |
RPL06.Interior.Center-Corridor - Final Finishes & Fixtures - Fixture Install (Lights) | Restrooms | Not Started | 11/16/26 | 11/24/26 | 8.8 | 8.8 |
|
56.2 |
RPL06.INT.CTRC.06940 |
RPL06.Interior.Center-Corridor - Final Finishes & Fixtures - Framing RO Verification, Tile Finish & ADA Verification (P | Restrooms | Not Started | 11/16/26 | 11/20/26 | 6.2 | 6.2 |
|
37.5 |
RPL06.INT.CTRC.2720 |
RPL06.Interior.Center-Corridor LO #10 & #12 - Install Security Lowside OH | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 11/16/26 | 11/18/26 | 3.8 | 3.8 |
|
7.5 |
RPL06.INT.CTRC.2760 |
RPL06.Interior.Center-Corridor LO #10 & #12 - Install Controls / EPMS / BMS OH | Interior Leave Out Wall #10, #12 (DHB/CC) | Not Started | 11/16/26 | 11/18/26 | 3.8 | 3.8 |
|
2.5 |
RPL06.INT.DHA.01690 |
RPL06.Interior.DHA - Control Fault Domain 5 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/08/26 | 18.8 | 18.8 |
|
40.0 |
RPL06.INT.DHA.01700 |
RPL06.Interior.DHA - Control Fault Domain 5 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/08/26 | 18.8 | 18.8 |
|
13.8 |
RPL06.INT.DHA.01760 |
RPL06.Interior.DHA - Control Fault Domain 4 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/08/26 | 18.8 | 18.8 |
|
42.5 |
RPL06.INT.DHA.02260 |
RPL06.Interior.DHA - Control Fault Domain 5 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/08/26 | 18.8 | 18.8 |
|
13.8 |
RPL06.INT.DHA.03860 |
RPL06.Interior.DHA - Control Fault Domain 5 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/08/26 | 18.8 | 18.8 |
|
13.8 |
RPL06.INT.DHB.01700 |
RPL06.Conn DHB - CFD4 - Set Passive Racks for WP#3b (16) | Infrastructure | Not Started | 11/16/26 | 11/18/26 | 3.8 | 3.8 |
|
52.5 |
RPL06.INT.DHB.01860 |
RPL06.Interior.DHB - Control Fault Domain 5 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/08/26 | 18.8 | 18.8 |
|
17.5 |
RPL06.INT.DHB.01900 |
RPL06.Interior.DHB - Control Fault Domain 5 - Install copper from GS.IDF to BMS and EPMS panels (UG from Corr IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/08/26 | 18.8 | 18.8 |
|
26.2 |
RPL06.INT.DHB.02860 |
RPL06.Conn DHB - CFD4 - Set Passive Racks for PON (16) | Infrastructure | Not Started | 11/16/26 | 11/18/26 | 3.8 | 3.8 |
|
107.5 |
RPL06.INT.DHD.01140 |
RPL06.Interior.DHD - Control Fault Domain 1 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/15/26 | 25.0 | 25.0 |
|
48.8 |
RPL06.INT.DHD.01150 |
RPL06.Interior.DHD - Control Fault Domain 1 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/15/26 | 25.0 | 25.0 |
|
36.2 |
RPL06.INT.DHD.01990 |
RPL06.Interior.DHD - Control Fault Domain 1 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/15/26 | 25.0 | 25.0 |
|
36.2 |
RPL06.INT.DHD.02510 |
RPL06.Interior.DHD - Control Fault Domain 1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 11/16/26 | 12/15/26 | 25.0 | 25.0 |
|
36.2 |
RPL06.WP3B.011180 |
RPL06.Conn EF1<>DHA.05 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 11/16/26 | 11/16/26 | 1.2 | 1.2 |
|
75.0 |
RPL06.WP4.015400 |
RPL06.Conn DHA.05 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 11/16/26 | 11/16/26 | 1.2 | 1.2 |
|
85.0 |
RPL06.WP4.015420 |
RPL06.Conn DHA.06 Pull Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 11/16/26 | 11/16/26 | 1.2 | 1.2 |
|
132.5 |
RPL06.WP4.015800 |
RPL06.Conn DHA.05.17 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 11/16/26 | 12/01/26 | 12.5 | 12.5 |
|
95.0 |
RPL06.WP4.015820 |
RPL06.Conn DHA.06.21 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 11/16/26 | 12/01/26 | 12.5 | 12.5 |
|
95.0 |
RPL06.WP4.016120 |
RPL06.Conn DHB.15.18 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 11/16/26 | 12/01/26 | 12.5 | 12.5 |
|
95.0 |
RPL06.WP4.016140 |
RPL06.Conn DHB.16.22 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 11/16/26 | 12/01/26 | 12.5 | 12.5 |
|
95.0 |
RPL06.WP4.016160 |
RPL06.Conn DHA.05 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 11/16/26 | 11/16/26 | 1.2 | 1.2 |
|
123.8 |
RPL06.WP4.016180 |
RPL06.Conn DHA.06 Pull Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 11/16/26 | 11/16/26 | 1.2 | 1.2 |
|
123.8 |
RPL06.CON.WP3B.02020 |
RPL06.Conn EF1<>DHA.06 - WBS Summary | EF1<>DHA.06 | Not Started | 11/17/26 | 12/02/26 | 12.5 | 12.5 |
|
121.2 |
RPL06.INT.CTRC.01430 |
RPL06.Interior.Center-Corridor (N) - Electrical Trim | Fit out (North) | Not Started | 11/17/26 | 11/20/26 | 5.0 | 5.0 |
|
72.5 |
RPL06.INT.CTRC.3550 |
RPL06.Interior.Center-Corridor LO #11 & #13 - Install IMP Wall at Leave Out (DH C) | Interior Leave Out Wall #11, #13 (DHA/CC) | Not Started | 11/17/26 | 11/19/26 | 3.8 | 3.8 |
|
18.8 |
RPL06.INT.DHC.02290 |
RPL06.Interior.DHC - OFE - Control Fault Domain 1 (HAC) | Control Fault Domain 1 | Not Started | 11/17/26 | 12/07/26 | 16.2 | 16.2 |
|
1.2 |
RPL06.INT.ENDC.1940 |
RPL06.Interior.End-Corridor - BoW - Install Vertical Tube Steel for Cable Tray (IFP Add) | Balance of Walls & Overhead | Not Started | 11/17/26 | 11/20/26 | 5.0 | 5.0 |
|
131.2 |
RPL06.INT.SBC.04000 |
RPL06.Interior.SSB-Corridor - BoW - Electrical L2 Checklist Completion | Balance of Walls & Overhead | Not Started | 11/17/26 | 12/02/26 | 12.5 | 12.5 |
|
63.8 |
RPL06.INT.SSB.01620 |
RPL06.Interior.SSB - BoW - Mechanical L2 Checklist Completion | Balance of Walls and OverHead | Not Started | 11/17/26 | 11/30/26 | 10.0 | 10.0 |
|
120.0 |
RPL06.INT.SSBC.01430 |
RPL06.Interior.SSB-Corridor - Final Punch Walk | Fit out | Not Started | 11/17/26 | 11/18/26 | 2.5 | 2.5 |
|
135.0 |
RPL06.WP3B.011200 |
RPL06.Conn EF1<>DHA.06 Pull Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 11/17/26 | 11/17/26 | 1.2 | 1.2 |
|
77.5 |
RPL06.WP3B.012620 |
RPL06.Conn EF1<>DHA.05 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 11/17/26 | 11/17/26 | 1.2 | 1.2 |
|
75.0 |
RPL06.WP3B.017880 |
RPL06.Conn EF2<>DHB.16 Test Pigtails (384F) P2&3 (LV) | EF2<>DHB.16 | Not Started | 11/17/26 | 11/18/26 | 2.5 | 2.5 |
|
118.8 |
RPL06.WP4.015840 |
RPL06.Conn DHA.05 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 11/17/26 | 11/17/26 | 1.2 | 1.2 |
|
85.0 |
RPL06.WP4.015860 |
RPL06.Conn DHA.06 Pull Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 11/17/26 | 11/17/26 | 1.2 | 1.2 |
|
132.5 |
RPL06.WP4.016400 |
RPL06.Conn DHA.05.17<>17 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 11/17/26 | 11/19/26 | 3.8 | 3.8 |
|
123.8 |
RPL06.WP4.016420 |
RPL06.Conn DHA.06.21<>21 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 11/17/26 | 11/19/26 | 3.8 | 3.8 |
|
123.8 |
RPL06.WP4.016440 |
RPL06.Conn DHA.05 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 11/17/26 | 11/19/26 | 3.8 | 3.8 |
|
142.5 |
RPL06.WP4.016460 |
RPL06.Conn DHA.06 Install Ext. Trunk (24F) [PON (Passive, In-Rack)] | In-Rack | Not Started | 11/17/26 | 11/19/26 | 3.8 | 3.8 |
|
142.5 |
RPL06.WP4.016600 |
RPL06.Conn DHB.15.18<>17 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/17/26 | 11/17/26 | 1.2 | 1.2 |
|
127.5 |
RPL06.WP4.016620 |
RPL06.Conn DHB.16.22<>21 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/17/26 | 11/17/26 | 1.2 | 1.2 |
|
127.5 |
RPL06.WP4.016720 |
RPL06.Conn DHB.15.20<>19 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/17/26 | 11/20/26 | 5.0 | 5.0 |
|
123.8 |
RPL06.WP4.016740 |
RPL06.Conn DHB.16.24<>23 Pull Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 11/17/26 | 11/20/26 | 5.0 | 5.0 |
|
123.8 |
RPL06.CON.WP2.08880 |
RPL06.Conn - GSIDF/DH A1- Install & Test Network (FIM) | Network | Not Started | 11/18/26 | 11/19/26 | 2.5 | 2.5 |
|
316.2 |
RPL06.INT.CTRC.01420 |
RPL06.Interior.Center-Corridor (N) - Install Battery | Fit out (North) | Not Started | 11/18/26 | 12/03/26 | 12.5 | 12.5 |
|
56.2 |
RPL06.INT.CTRC.8340 |
RPL06.Interior.Center-Corridor LO #11 - Frame Out All Remaining Walls | Remaining of LO Wall #11 (Spoke Parts) | Not Started | 11/18/26 | 11/20/26 | 3.8 | 3.8 |
|
30.0 |
RPL06.INT.SSB.06485 |
RPL06.Interior.SSB LO #16 - Final Punch Walk | Leave Out Wall #16 (SSB - North of Loading Dock) | Not Started | 11/18/26 | 11/24/26 | 6.2 | 6.2 |
|
68.8 |
RPL06.WP3B.012640 |
RPL06.Conn EF1<>DHA.06 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.06 | Not Started | 11/18/26 | 11/18/26 | 1.2 | 1.2 |
|
121.2 |
RPL06.WP3B.014060 |
RPL06.Conn EF1<>DHA.05 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 11/18/26 | 11/25/26 | 7.5 | 7.5 |
|
75.0 |
RPL06.WP3B.015500 |
RPL06.Conn EF1<>DHA.05 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHA.05 | Not Started | 11/18/26 | 11/18/26 | 1.2 | 1.2 |
|
75.0 |
RPL06.WP4.016200 |
RPL06.Conn DHA.05 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 11/18/26 | 11/19/26 | 2.5 | 2.5 |
|
85.0 |
RPL06.WP4.016220 |
RPL06.Conn DHA.06 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 11/18/26 | 11/19/26 | 2.5 | 2.5 |
|
132.5 |
GCD.RPL06.3530 |
[RPL06] TC-C Ready : Production Cabling Start [DHB Rows 25-32] | TC-C Ready: Production Cabling - DHB | Not Started | 11/19/26 | 11/19/26 | 0.0 | 0.0 |
|
317.5 |
GCD.RPL06.4665 |
L3/L4 Start - DHA Rows 17-24 | DH | Not Started | 11/19/26 | 11/19/26 | 0.0 | 0.0 |
|
127.5 |
RPL06.CON.WP2.11080 |
RPL06.Conn - GSMDF1(South)<>DH B - CFD4 Rack #01 Pull, Install & Test PON Trunks | MDF1 <> DH B - Rack#01 MES side | Not Started | 11/19/26 | 11/23/26 | 3.8 | 3.8 |
|
123.8 |
RPL06.CON.WP2.12080 |
RPL06.Conn - GSMDF2(North)<>DH B - CFD4 Rack #50 Pull, Install & Test PON Trunks | MDF2 <> DH B - Rack#50 LV side | Not Started | 11/19/26 | 11/23/26 | 3.8 | 3.8 |
|
123.8 |
RPL06.CON.WP3B.01360 |
RPL06.Conn EF2<>DHB.17 - WBS Summary | EF2<>DHB.17 | Not Started | 11/19/26 | 12/04/26 | 12.5 | 12.5 |
|
106.2 |
RPL06.CX.DHA.01120 |
RPL06.CX.DHA - L3/L4 - Elec. Domain 05/06 | DHA ELECTRICAL | Not Started | 11/19/26 | 11/24/26 | 5.0 | 5.0 |
|
48.8 |