Last schedule upload: D3-R25005-00-RPL06 — 6139 activities — 04/16/2026 08:19 AM CT
RPL06 - GC LIVE SCHEDULE - Data Date 2026.04.12.xer
· Uploaded Apr 16, 2026 01:19 PM
· 6139 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
4
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL06.INT.EC.LO.9520 |
RPL06.Interior.EC LO #15 - Duct Drops / Trim out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/04/27 | 03/05/27 | 2.5 | 2.5 |
|
7.5 |
RPL06.INT.EC.LO.9540 |
RPL06.Interior.EC LO #15 - Fire Safing / Wall Finishes | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/04/27 | 03/05/27 | 2.5 | 2.5 |
|
60.0 |
RPL06.INT.EC.LO.9600 |
RPL06.Interior.EC LO #15 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/04/27 | 03/08/27 | 3.8 | 3.8 |
|
58.8 |
RPL06.INT.EC.LO.9660 |
RPL06.Interior.EC LO #15 - Install Remaining Lights | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/04/27 | 03/09/27 | 5.0 | 5.0 |
|
1.2 |
RPL06.INT.ENDC.1660 |
RPL06.Interior.End-Corridor - BoW - Final Paint and Tube Steel Paint (IFP Add) | Balance of Walls & Overhead | Not Started | 03/04/27 | 03/10/27 | 6.2 | 6.2 |
|
52.5 |
RPL06.WP3B.012360 |
RPL06.Conn EF2<>DHC.28 Pull Pigtails (384F) P2&3 (MES) | EF2<>DHC.28 | Not Started | 03/04/27 | 03/05/27 | 2.5 | 2.5 |
|
127.5 |
RPL06.WP3B.013780 |
RPL06.Conn EF2<>DHC.27 Install (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.27 | Not Started | 03/04/27 | 03/04/27 | 1.2 | 1.2 |
|
60.0 |
RPL06.WP3B.014500 |
RPL06.Conn EF1<>DHC.27 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.27 | Not Started | 03/04/27 | 03/11/27 | 7.5 | 7.5 |
|
61.2 |
RPL06.WP3B.015940 |
RPL06.Conn EF1<>DHC.27 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.27 | Not Started | 03/04/27 | 03/04/27 | 1.2 | 1.2 |
|
61.2 |
RPL06.WP4.037420 |
RPL06.Conn DHC.27 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/04/27 | 03/04/27 | 1.2 | 1.2 |
|
72.5 |
RPL06.WP4.037440 |
RPL06.Conn DHC.28 Pull Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/04/27 | 03/04/27 | 1.2 | 1.2 |
|
142.5 |
RPL06.WP4.037480 |
RPL06.Conn DHA.07.25<>25 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 03/04/27 | 03/04/27 | 1.2 | 1.2 |
|
55.0 |
RPL06.WP4.037500 |
RPL06.Conn DHA.08.29<>29 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 03/04/27 | 03/04/27 | 1.2 | 1.2 |
|
55.0 |
RPL06.WP4.037520 |
RPL06.Conn DHB.20.37<>37 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 03/04/27 | 03/04/27 | 1.2 | 1.2 |
|
42.5 |
RPL06.WP4.037540 |
RPL06.Conn DHB.19.34<>33 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | In-Row | Not Started | 03/04/27 | 03/04/27 | 1.2 | 1.2 |
|
42.5 |
RPL06.WP4.037760 |
RPL06.Conn DHA.07 Install (Z-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 03/04/27 | 03/05/27 | 2.5 | 2.5 |
|
50.0 |
RPL06.WP4.037780 |
RPL06.Conn DHA.08 Install (Z-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 03/04/27 | 03/05/27 | 2.5 | 2.5 |
|
50.0 |
RPL06.WP4.037800 |
RPL06.Conn DHB.19 Install (Z-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 03/04/27 | 03/05/27 | 2.5 | 2.5 |
|
-6.2 |
RPL06.WP4.037820 |
RPL06.Conn DHB.20 Install (Z-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 03/04/27 | 03/05/27 | 2.5 | 2.5 |
|
-10.0 |
GCD.RPL06.5405 |
L3/L4 Start - DHC Rows 25-32 | DH | Not Started | 03/05/27 | 03/05/27 | 0.0 | 0.0 |
|
136.2 |
RPL06.CX.DHC.01140 |
RPL06.CX.DHC - L3/L4 - Elec. Domain 07/08 | DHC ELECTRICAL | Not Started | 03/05/27 | 03/10/27 | 5.0 | 5.0 |
|
47.5 |
RPL06.INT.EC.9640 |
RPL06.Interior.EC LO #15 - Hang Drywall | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 03/05/27 | 03/10/27 | 5.0 | 5.0 |
|
63.8 |
RPL06.WP3B.013080 |
RPL06.Conn EF1<>DHC.28 Install (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.28 | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
128.8 |
RPL06.WP3B.015220 |
RPL06.Conn EF2<>DHC.27 Splice (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.27 | Not Started | 03/05/27 | 03/12/27 | 7.5 | 7.5 |
|
60.0 |
RPL06.WP3B.016660 |
RPL06.Conn EF2<>DHC.27 Install (Z-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.27 | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
60.0 |
RPL06.WP4.032780 |
RPL06.Conn DHC.26 Install (A-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
140.0 |
RPL06.WP4.033320 |
RPL06.Conn DHC.26 Install (A-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
142.5 |
RPL06.WP4.033360 |
RPL06.Conn DHD.36 Install (A-End) Ext. Trunk (384F) [SSW<>JXSW] | SSW<>JXSW | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
127.5 |
RPL06.WP4.033860 |
RPL06.Conn DHD.36 Install (A-End) Trunk (192F) [FSW<>SSW] | FSW<>SSW | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
130.0 |
RPL06.WP4.033960 |
RPL06.Conn DHC.26 Install (A-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/05/27 | 03/10/27 | 5.0 | 5.0 |
|
142.5 |
RPL06.WP4.034600 |
RPL06.Conn DHD.36 Install (A-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/05/27 | 03/10/27 | 5.0 | 5.0 |
|
130.0 |
RPL06.WP4.036380 |
RPL06.Conn DHC.26.21 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
150.0 |
RPL06.WP4.037200 |
RPL06.Conn DHD.36.29 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
137.5 |
RPL06.WP4.037880 |
RPL06.Conn DHA.07.27<>27 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
55.0 |
RPL06.WP4.037900 |
RPL06.Conn DHA.08.31<>31 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
55.0 |
RPL06.WP4.037920 |
RPL06.Conn DHB.20.39<>39 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | In-Row | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
42.5 |
RPL06.WP4.037940 |
RPL06.Conn DHB.19.36<>35 Install (Z-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | In-Row | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
42.5 |
RPL06.WP4.037960 |
RPL06.Conn DHC.21.03 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
150.0 |
RPL06.WP4.037980 |
RPL06.Conn DHC.22.07 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
150.0 |
RPL06.WP4.038140 |
RPL06.Conn DHC.21.04 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/05/27 | 03/18/27 | 12.5 | 12.5 |
|
137.5 |
RPL06.WP4.038160 |
RPL06.Conn DHC.22.08 Pull Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/05/27 | 03/18/27 | 12.5 | 12.5 |
|
137.5 |
RPL06.WP4.038220 |
RPL06.Conn DHD.29.04 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
137.5 |
RPL06.WP4.038240 |
RPL06.Conn DHD.30.08 Install (A-End) Duplex Jumper (LC<>LC) [RSW<>FSW (AI Confirmed)] | Jumpers (AI Confirmed) | Not Started | 03/05/27 | 03/08/27 | 2.5 | 2.5 |
|
137.5 |
RPL06.WP4.039140 |
RPL06.Conn DHC.25.20<>19 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
147.5 |
RPL06.WP4.039500 |
RPL06.Conn DHC.26.24<>23 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
147.5 |
RPL06.WP4.039800 |
RPL06.Conn DHD.35.28<>27 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
135.0 |
RPL06.WP4.039820 |
RPL06.Conn DHD.36.32<>31 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, Across-Row)] | Across-Row | Not Started | 03/05/27 | 03/05/27 | 1.2 | 1.2 |
|
135.0 |
GCD.RPL06.2002 |
L3 Finish - DHB | DH | Not Started | 03/08/27 | 03/08/27 | 0.0 | 0.0 |
|
25.0 |
GCD.RPL06.3905 |
L3/L4 Finish - DHB Rows 33-40 | DH | Not Started | 03/08/27 | 03/08/27 | 0.0 | 0.0 |
|
25.0 |
RPL06.EY.DHC.01450 |
RPL06.EY.DHC - Install Remaining Electrical Tie-ins | Tie-ins | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
116.2 |
RPL06.EY.DHC.01510 |
RPL06.EY.DHC - Install Floor Mounted Outdoor Split AC Units (Qty4) | OFE | Not Started | 03/08/27 | 03/09/27 | 2.5 | 2.5 |
|
113.8 |
RPL06.EY.DHD.01440 |
RPL06.EY.DHD - Install Remaining Mechanical/ refrigerant Tie-ins | Tie-ins | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
103.8 |
RPL06.EY.ENDC.01120 |
RPL06.EY.End - Install Perm Paving | Hardscape and Landscape | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
166.2 |
RPL06.EY.ENDC.01130 |
RPL06.EY.End - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 03/08/27 | 04/05/27 | 25.0 | 25.0 |
|
51.2 |
RPL06.EY.ENDC.01160 |
RPL06.EY.End - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 03/08/27 | 05/17/27 | 62.5 | 62.5 |
|
166.2 |
RPL06.EY.ENDC.02120 |
RPL06.EY.End - Install Remaining Permanent Duct with insulation to AHU Units | Temp Conditions | Not Started | 03/08/27 | 03/17/27 | 10.0 | 10.0 |
|
66.2 |
RPL06.INT.EC.9280 |
RPL06.Interior.ECr LO #14 - Plumbing Trim Out | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
71.2 |
RPL06.INT.EC.9300 |
RPL06.Interior.ECr LO #14 - Fire Life Safety Trim Out | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 03/08/27 | 03/12/27 | 6.2 | 6.2 |
|
71.2 |
RPL06.INT.EC.9680 |
RPL06.Interior.EC LO #15 - Install Flooring Tiles/Resinous Flooring in specific rooms **?? | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
73.8 |
RPL06.INT.ENDC.6140 |
RPL06.Interior.EC Ext. Leave Out #18 - Drop Remaining Duct | Exterior Leave Out Wall #18 EC - North for DHB&D HACs | Not Started | 03/08/27 | 03/09/27 | 2.5 | 2.5 |
|
101.2 |
RPL06.WP3B.013800 |
RPL06.Conn EF2<>DHC.28 Install (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.28 | Not Started | 03/08/27 | 03/08/27 | 1.2 | 1.2 |
|
127.5 |
RPL06.WP3B.014520 |
RPL06.Conn EF1<>DHC.28 Splice (A-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.28 | Not Started | 03/08/27 | 03/15/27 | 7.5 | 7.5 |
|
128.8 |
RPL06.WP3B.015960 |
RPL06.Conn EF1<>DHC.28 Install (Z-End) Pigtails (384F) P1&4 (LV) | EF1<>DHC.28 | Not Started | 03/08/27 | 03/08/27 | 1.2 | 1.2 |
|
128.8 |
RPL06.WP4.038460 |
RPL06.Conn DHA.07 Install (Z-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/08/27 | 03/11/27 | 5.0 | 5.0 |
|
50.0 |
RPL06.WP4.038480 |
RPL06.Conn DHA.08 Install (Z-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/08/27 | 03/11/27 | 5.0 | 5.0 |
|
50.0 |
RPL06.WP4.038500 |
RPL06.Conn DHB.19 Install (Z-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/08/27 | 03/11/27 | 5.0 | 5.0 |
|
-6.2 |
RPL06.WP4.038520 |
RPL06.Conn DHB.20 Install (Z-End) Trunk (384F) [RSW<>FSW] | Trunks | Not Started | 03/08/27 | 03/11/27 | 5.0 | 5.0 |
|
-10.0 |
RPL06.WP4.039760 |
RPL06.Conn DHC.27.25<>25 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/08/27 | 03/08/27 | 1.2 | 1.2 |
|
147.5 |
RPL06.WP4.039780 |
RPL06.Conn DHC.28.29<>29 Install (A-End) Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/08/27 | 03/08/27 | 1.2 | 1.2 |
|
147.5 |
RPL06.WP4.040120 |
RPL06.Conn DHC.27.27<>27 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
135.0 |
RPL06.WP4.040140 |
RPL06.Conn DHC.28.31<>31 Pull Simplex Jumper (SC<>LC) [PON (Active, In-Row)] | Jumpers | Not Started | 03/08/27 | 03/10/27 | 3.8 | 3.8 |
|
135.0 |
RPL06.WP4.047640 |
RPL06.Conn BE ISP DHA.CFD2 (RSL) FTSW > STSW EX384f [Across-Row] | Across-Row | Not Started | 03/08/27 | 03/19/27 | 12.5 | 12.5 |
|
3.8 |
RPL06.CX.DHB.01220 |
RPL06.CX.DHB - TAB Verification | DHB DATA HALL LEVEL TESTING | Not Started | 03/09/27 | 03/15/27 | 6.2 | 6.2 |
|
18.8 |
RPL06.CX.DHD.01090 |
RPL06.CX.DHD - L3/L4 - Control Fault Domain 01 | Control Fault Domain 1 | Not Started | 03/09/27 | 03/31/27 | 20.0 | 20.0 |
|
41.2 |
RPL06.INT.EC.LO.9560 |
RPL06.Interior.EC LO #15 - Electrical Trim Out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
58.8 |
RPL06.INT.EC.LO.9580 |
RPL06.Interior.EC LO #15 - Security Trim Out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
58.8 |
RPL06.INT.EC.LO.9780 |
RPL06.Interior.EC LO #15 - Install Remaining Refrigerant Line | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/09/27 | 03/10/27 | 2.5 | 2.5 |
|
66.2 |
RPL06.INT.ENDC.5100 |
RPL06.Interior.EC Ext. Leave Out #19 - Install Electrical Lowside OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 03/09/27 | 03/12/27 | 5.0 | 5.0 |
|
42.5 |
RPL06.INT.ENDC.5120 |
RPL06.Interior.EC Ext. Leave Out #19 - Install Plumbing Lowside OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 03/09/27 | 03/12/27 | 5.0 | 5.0 |
|
42.5 |
RPL06.INT.ENDC.5140 |
RPL06.Interior.EC Ext. Leave Out #19 - Install Fire Life Safety Lowside OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 03/09/27 | 03/12/27 | 5.0 | 5.0 |
|
42.5 |
RPL06.INT.ENDC.5160 |
RPL06.Interior.EC Ext. Leave Out #19 - Install Security Lowside OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 03/09/27 | 03/12/27 | 5.0 | 5.0 |
|
42.5 |
RPL06.INT.ENDC.5180 |
RPL06.Interior.EC Ext. Leave Out #19 - Install Controls / EPMS / BMS OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 03/09/27 | 03/15/27 | 6.2 | 6.2 |
|
41.2 |
RPL06.INT.ENDC.5200 |
RPL06.Interior.EC Ext. Leave Out #19 - Fire Safing OH | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 03/09/27 | 03/10/27 | 2.5 | 2.5 |
|
45.0 |
RPL06.INT.ENDC.5520 |
RPL06.Interior.EC Ext. Leave Out #19 - Install Remaining Refrigerant Line | Exterior Leave Out Wall #19 EC - South for DHA&C HACs | Not Started | 03/09/27 | 03/11/27 | 3.8 | 3.8 |
|
98.8 |
RPL06.PR.DHA.FE.0035 |
RPL06.PR.DHA FENW PZ2 (Row 09-24) - ENS Ready for PZ2 | FENW | Not Started | 03/09/27 | 03/09/27 | 0.0 | 0.0 |
|
60.0 |
RPL06.PR.DHA.FE.0040 |
RPL06.PR.DHA FENW PZ2 (Row 09-24) - Provisioning, Auditing, Issue Remediation (FSW, SSW) | FENW | Not Started | 03/09/27 | 04/13/27 | 31.2 | 31.2 |
|
165.0 |
RPL06.WP3B.015240 |
RPL06.Conn EF2<>DHC.28 Splice (A-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.28 | Not Started | 03/09/27 | 03/16/27 | 7.5 | 7.5 |
|
127.5 |
RPL06.WP3B.016680 |
RPL06.Conn EF2<>DHC.28 Install (Z-End) Pigtails (384F) P2&3 (MES) | EF2<>DHC.28 | Not Started | 03/09/27 | 03/09/27 | 1.2 | 1.2 |
|
127.5 |
RPL06.EY.DHC.01440 |
RPL06.EY.DHC - Install Remaining Mechanical/ refrigerant Tie-ins | Tie-ins | Not Started | 03/10/27 | 03/16/27 | 6.2 | 6.2 |
|
113.8 |
RPL06.EY.ENDC.01180 |
RPL06.EY.End - Install BMS/EPMS Tie-ins | Tie-ins | Not Started | 03/10/27 | 03/31/27 | 18.8 | 18.8 |
|
55.0 |
RPL06.INT.EC.9320 |
RPL06.Interior.ECr LO #14 - Install Door (Verify with Trades before installation) | Remaining of LO Wall #14 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 03/10/27 | 03/16/27 | 6.2 | 6.2 |
|
68.8 |
RPL06.INT.EC.LO.9680 |
RPL06.Interior.EC LO #15 - Install Asset Tags | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/10/27 | 03/12/27 | 3.8 | 3.8 |
|
1.2 |
RPL06.INT.ENDC.4020 |
RPL06.Interior.EC Ext. Leave Out #18 - Install Remaining Vertical Tube Steel Support for Cable Tray (IFP Add) | Exterior Leave Out Wall #18 EC - North for DHB&D HACs | Not Started | 03/10/27 | 03/10/27 | 1.2 | 1.2 |
|
110.0 |
RPL06.INT.ENDC.5800 |
RPL06.Interior.EC Ext. Leave Out #18 - Install Remaining Lights | Exterior Leave Out Wall #18 EC - North for DHB&D HACs | Not Started | 03/10/27 | 03/23/27 | 12.5 | 12.5 |
|
40.0 |
RPL06.INT.ENDC.5980 |
RPL06.Interior.EC Ext. Leave Out #18 - Mechanical L2 Checklist Completion | Exterior Leave Out Wall #18 EC - North for DHB&D HACs | Not Started | 03/10/27 | 03/23/27 | 12.5 | 12.5 |
|
101.2 |
RPL06.EY.ENDC.01140 |
RPL06.EY.End - Install Mechanical Main (include penetration detail) | Tie-ins | Not Started | 03/11/27 | 04/01/27 | 18.8 | 18.8 |
|
41.2 |
RPL06.INT.EC.9700 |
RPL06.Interior.EC LO #15 - Install Remaining Lights | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 03/11/27 | 03/16/27 | 5.0 | 5.0 |
|
66.2 |
RPL06.INT.EC.9720 |
RPL06.Interior.EC LO #15 - Tape Finish Paint | Remaining of LO #15 (Ancillary, Elec Room, Humidifier Room & IDF) | Not Started | 03/11/27 | 03/17/27 | 6.2 | 6.2 |
|
63.8 |
RPL06.INT.EC.LO.9620 |
RPL06.Interior.EC LO #15 - Plumbing Trim Out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
58.8 |
RPL06.INT.EC.LO.9640 |
RPL06.Interior.EC LO #15 - Fire Life Safety Trim Out | Interior Leave Out Wall #15 DHC/EC for DHA&C HACs | Not Started | 03/11/27 | 03/11/27 | 1.2 | 1.2 |
|
58.8 |