Schedule Viewer
Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer
· Uploaded Jun 03, 2026 01:35 PM
· 9281 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
71
Completed
29
In Progress
71
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.INT.SSBC.02340 |
RPL10.Interior.SSB-Corridor - BoW - Shell Space Walls (micro plan for finishes) | Balance of Walls & OverHead | Complete | 04/13/26 | 04/15/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1800 |
RPL10.MCUP.Loop 1 - Tie-in BMS #5 | Tie-Ins BMS | Complete | 04/13/26 | 05/22/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1980 |
RPL10.MCUP.Loop 1 - Tie-in Mechanical #7 WBS Summary | Tie-in Mechanical #7 | Complete | 04/13/26 | 05/15/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.2700 |
RPL10.MCUP.Loop 1 - Facility Water Tie-in Mechanical #7 | Tie-in Mechanical #7 | Complete | 04/13/26 | 04/15/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.2720 |
RPL10.MCUP.Loop 1 - Condenser Water Tie-in Mechanical #7 | Tie-in Mechanical #7 | Complete | 04/13/26 | 05/15/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.1580 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical (LOE) | Tie-Ins Mechanical | Active | 04/13/26 | 06/10/26 | 30.0 | 15.0 |
|
132.5 |
RPL10.MCUP.LP2.1600 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical #2 WBS Summary | Tie-in Mechanical #2 | Active | 04/13/26 | 05/29/26 | 20.0 | 5.0 |
|
136.2 |
RPL10.MCUP.LP2.2560 |
RPL10.MCUP.Loop 2 - Set Remaining Facility water piping rack with All Racks Welding | OFE | Complete | 04/13/26 | 05/22/26 | 12.5 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.2600 |
RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #2 | Tie-in Mechanical #2 | Active | 04/13/26 | 05/29/26 | 3.8 | 5.0 |
|
136.2 |
RPL10.SSBC.BB.1340 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - Arch Finishes - Frame, Hang Drywall, Paint, Final Finishes (LOE) | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Active | 04/13/26 | 05/26/26 | 25.0 | 1.2 |
|
170.0 |
RPL10.SSBC.BB.1440 |
RPL10.Int.Build Back.SSB-Corr - Interior Leave Out (SSB Corridor) #2, #3, #4 WBS Summary | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Active | 04/13/26 | 06/17/26 | 58.8 | 21.2 |
|
170.0 |
RPL10.SSBC.BB.3155 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3 - Frame | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Complete | 04/13/26 | 04/14/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.SSBC.BB.3175 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3 - MEPF - In Wall | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Complete | 04/13/26 | 04/14/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.SSBC.BB.3215 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3 - Tape, Float and Paint | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Complete | 04/13/26 | 05/01/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.EY.EF1.01620 |
RPL10.EY.EF1 - Install RPL-1 FSP Columns Cap Erect Shoring & Decking & F/R/P | Fiber Support Platform - RPL-1 | Complete | 04/14/26 | 04/24/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.EY.SSB.01175 |
RPL10.EY.SSB - Install Mechanical Tie-ins | Tie-ins | Complete | 04/14/26 | 05/11/26 | 12.5 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01380 |
RPL10.Interior.Center-Corridor - BoW - Install Cable Tray (Early) | Balance of Walls & OverHead | Complete | 04/14/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.01080 |
RPL10.Interior.End-Corridor - BoW - Install Electrical Lowside OH and In-wall | Balance of Walls & Overhead | Complete | 04/14/26 | 05/13/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.1520 |
RPL10.Interior.End-Corridor - BoW - Install Backing and In-Wall BoW | Balance of Walls & Overhead | Complete | 04/14/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.6400 |
RPL10.Interior.End-Corridor - Priority - QC - P7 Wall - Backing/In-Wall | Priority Wall (P7) - Grid Line 10-02 | Complete | 04/14/26 | 04/15/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01203 |
RPL10.Interior.NS1 - MES Skids - CDU Tie-Ins | NS1 - MES Skids | Active | 04/14/26 | 05/29/26 | 30.0 | 5.0 |
|
133.8 |
RPL10.MCUP.LP2.1480 |
RPL10.MCUP.Loop 2 - Set Electrical Skids #6 | OFE | Complete | 04/14/26 | 04/15/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.1500 |
RPL10.MCUP.Loop 2 - Set Electrical Skids #8 | OFE | Complete | 04/14/26 | 04/15/26 | 2.5 | 0.0 |
|
0.0 |
RPL.10.D.X3760.XG |
RMUs/MV Skids Set - mCUP South | Give Milestones (XREFs) | Complete | 04/15/26 | 04/15/26 | 0.0 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01330 |
RPL10.Interior.Center-Corridor - BoW - Hang Drywall BoW | Balance of Walls & OverHead | Complete | 04/15/26 | 04/24/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01910 |
RPL10.Interior.Center-Corridor - BoW - Install Backing | Balance of Walls & OverHead | Complete | 04/15/26 | 04/21/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.1300 |
RPL10.Interior.End-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & Overhead | Complete | 04/15/26 | 05/18/26 | 10.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01350 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS2 Control Fault Domain 4 | Active | 04/15/26 | 05/29/26 | 46.2 | 5.0 |
|
11.2 |
RPL10.INT.NS2.02565 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle) - Row 10 | OFE NS2 Control Fault Domain 4 | Complete | 04/15/26 | 04/15/26 | 1.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.03285 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle) - Remaining (11-13) | OFE NS2 Control Fault Domain 4 | Complete | 04/15/26 | 04/20/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.INT.SSB.01130 |
RPL10.Interior.SSB - BoW - Paint (1st Coat) | Balance of Walls and OverHead | Complete | 04/15/26 | 04/17/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.SSBC.BB.3195 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3 - Hang Drywall | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Complete | 04/15/26 | 04/20/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.06820 |
RPL10.Interior.End-Corridor - BoW - Install Remaining Unistruts & Hangers | Balance of Walls & Overhead | Complete | 04/16/26 | 04/22/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01112 |
RPL10.Interior.NS2 - MES Skids - Final Piping Tie-Ins & Inspections | NS2 - MES Skids | Active | 04/16/26 | 05/26/26 | 30.0 | 1.2 |
|
32.5 |
RPL10.INT.NS2.02465 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 6 SQ1.2 - (HAC) | OFE NS2 Control Fault Domain 6 | Complete | 04/16/26 | 05/08/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.SSB.01290 |
RPL10.Interior.SSB - BoW - Frame Hard Lid | Balance of Walls and OverHead | Complete | 04/16/26 | 04/22/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1940 |
RPL10.MCUP.Loop 1 - Tie-in BMS #7 | Tie-Ins BMS | Complete | 04/16/26 | 05/22/26 | 10.0 | 0.0 |
|
0.0 |
RPL.CM.D.N5665.XR |
Smalling Widening (LA 183 to Jaggers) | Logistics - Off-Site Receive XREF Milsetones | Complete | 04/17/26 | 04/17/26 | 0.0 | 0.0 |
|
0.0 |
RPL.CM.D.N5670.XR |
Smalling Repave (LA 183 to Jaggers) | Logistics - Off-Site Receive XREF Milsetones | Complete | 04/17/26 | 04/17/26 | 0.0 | 0.0 |
|
0.0 |
RPL10.EY.EF1.01150 |
RPL10.EY.EF1 - Install RPL-2 FSP Columns F/R/P | Fiber Support Platform - RPL-2 | Complete | 04/17/26 | 04/22/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.EY.ENDC.01270 |
RPL10.Interior.End-Corridor - Install Temp Conditioning Return Duct (Inside) | Priority Walls & OverHead | Complete | 04/17/26 | 04/24/26 | 11.2 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01210 |
RPL10.Interior.Center-Corridor - BoW - Install Electrical Lowside OH and In-wall | Balance of Walls & OverHead | Complete | 04/17/26 | 04/29/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01930 |
RPL10.Interior.Center-Corridor - BoW - QC BoW - Backing/In-Wall | Balance of Walls & OverHead | Complete | 04/17/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.SSB.07060 |
RPL10.Interior.SSB - Kitchen - Hang Drywall, Tape, Float, Paint (Remaining) | Kitchen and Office Spaces | Complete | 04/17/26 | 04/28/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.SSBC.02280 |
RPL10.Interior.SSB-Corridor - BoW - Install Electrical Carrier MDF (10.N2.09) | Balance of Walls & OverHead | Complete | 04/17/26 | 05/04/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.INT.SSBC.02600 |
RPL10.Interior.SSB-Corridor - BoW - Install Fire Safing/ Seal all Penetrations (Lowside space) | Balance of Walls & OverHead | Complete | 04/17/26 | 04/23/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.2040 |
RPL10.MCUP.Loop 1 - Install Mcup Paving *Start 04/10 | Hardscape and Landscape | Active | 04/17/26 | 06/24/26 | 18.8 | 27.5 |
|
443.8 |
RPL10.MCUP.LP2.1560 |
RPL10.MCUP.Loop 2 - Tie-in Electrical (LOE) | Tie-Ins Electrical | Active | 04/17/26 | 06/01/26 | 26.2 | 6.2 |
|
131.2 |
RPL10.MCUP.LP2.1620 |
RPL10.MCUP.Loop 2 - Tie-in Electrical #2 | Tie-Ins Electrical | Active | 04/17/26 | 05/29/26 | 11.2 | 5.0 |
|
132.5 |
RPL10.MCUP.LP2.1740 |
RPL10.MCUP.Loop 2 - Tie-in Electrical #4 | Tie-Ins Electrical | Active | 04/17/26 | 06/01/26 | 8.8 | 5.0 |
|
131.2 |
RPL10.SSB.BB.1000 |
RPL10.Ext.Build Back.SSB - Exterior Leave Out #5 ( East SSB Area) WBS Summary | Build Back Exterior Leave Out Wall #5 (East SSB) | Active | 04/17/26 | 07/17/26 | 80.0 | 22.5 |
|
405.0 |
RPL10.SSB.BB.1140 |
RPL10.Ext.Build Back.SSB - LO #5 - F/R/P Stem wall | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 04/17/26 | 04/20/26 | 3.8 | 0.0 |
|
0.0 |
JCL.C.1360 |
RPL10 - Cost Risk LOE-19 Connectivity Package 2 - GS Carrier SFZ | Cost LOEs | Active | 04/20/26 | 12/21/26 | 233.8 | 181.2 |
|
126.2 |
RPL.CM.D.C5500.XR |
Galaxy Road | Logistics - Onsite Receive XREF Milestones | Complete | 04/20/26 | 04/20/26 | 0.0 | 0.0 |
|
0.0 |
RPL.CM.D.N5605.XR |
LA 183 /Burn Road - Traffic Signal | Logistics - Off-Site Receive XREF Milsetones | Complete | 04/20/26 | 04/20/26 | 0.0 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01140 |
RPL10.EY.NS4 - Install Tent Electrical Panels | Tent and Temp Conditions | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01150 |
RPL10.EY.NS4 - Install Tent Heating and Cooling Equipment | Tent and Temp Conditions | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01190 |
RPL10.EY.NS4 - Install Tent Mechanical Tie-ins | Tent and Temp Conditions | Complete | 04/20/26 | 04/24/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01230 |
RPL10.Interior.Center-Corridor - BoW - Install Security Lowside OH and In-wall | Balance of Walls & OverHead | Complete | 04/20/26 | 05/04/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.INT.EF1.01750 |
RPL10.Interior.EF1 - Piping Tie-Ins to FW Loop (From MES Skids) | Tie-Ins | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.EF2.01210 |
RPL10.Interior.EF2 - Tie-ins - WBS Summary | Tie-Ins | Active | 04/20/26 | 08/24/26 | 111.2 | 75.0 |
|
145.0 |
RPL10.INT.EF2.01810 |
RPL10.Interior.EF2 - Piping Tie-Ins to FW Loop (From MES Skids) | Tie-Ins | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01225 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Complete | 04/20/26 | 04/21/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01770 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/20/26 | 04/20/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01800 |
RPL10.Interior.NS1 - Tie-ins - Control Fault Domain 2 SQ5.1 - WBS Summary | Tie-Ins NS1 Control Fault Domain 2 | Active | 04/20/26 | 07/14/26 | 75.0 | 43.8 |
|
83.8 |
RPL10.INT.NS1.01910 |
RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/20/26 | 04/20/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01940 |
RPL10.Interior.NS1 - Tie-ins - Control Fault Domain 1 SQ6.1 - WBS Summary | Tie-Ins NS1 Control Fault Domain 1 | Active | 04/20/26 | 07/10/26 | 72.5 | 41.2 |
|
92.5 |
RPL10.INT.NS1.02480 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 5 SQ2.1 (HAC) | OFE NS1 Control Fault Domain 5 | Complete | 04/20/26 | 04/30/26 | 18.8 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01065 |
RPL10.Interior.NS2 - OFE - Electrical Panels (ATS) - Set / Anchor | OFE | Complete | 04/20/26 | 04/28/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01130 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/20/26 | 04/20/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01160 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 6 SQ1.2 - WBS Summary | Tie-Ins NS2 Control Fault Domain 6 | Active | 04/20/26 | 07/14/26 | 75.0 | 43.8 |
|
8.8 |
RPL10.INT.NS2.01220 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Complete | 04/20/26 | 05/12/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01260 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/20/26 | 04/20/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01300 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 5 SQ2.2 - WBS Summary | Tie-Ins NS2 Control Fault Domain 5 | Active | 04/20/26 | 07/21/26 | 75.0 | 50.0 |
|
12.5 |
RPL10.INT.NS2.02020 |
RPL10.Interior.NS2 - OFE - Ancillary Skids - Set / Place / Anchor (04.01.26) | OFE | Complete | 04/20/26 | 04/24/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS3.02360 |
RPL10.Interior.NS3 - Priority - Install Security | OverHead | Complete | 04/20/26 | 04/21/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.NS4.02360 |
RPL10.Interior.NS4 - Priority - Install Security | OverHead | Complete | 04/20/26 | 04/21/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.SSBC.02900 |
RPL10.Interior.SSB-Corridor - BoW - Final Paint | Balance of Walls & OverHead | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1780 |
RPL10.MCUP.Loop 1 - Tie-in EPMS #5 | Tie-Ins EPMS | Complete | 04/20/26 | 05/22/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1840 |
RPL10.MCUP.Loop 1 - Install Sleeves MEPL | Hardscape and Landscape | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.1900 |
RPL10.MCUP.Loop 1 - Tie-in EPMS #7 | Tie-Ins EPMS | Complete | 04/20/26 | 05/22/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.1520 |
RPL10.MCUP.Loop 2 - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Active | 04/20/26 | 08/14/26 | 103.8 | 72.5 |
|
411.2 |
RPL10.MCUP.LP2.1540 |
RPL10.MCUP.Loop 2 - Install Sleeves MEPL | Hardscape and Landscape | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.1800 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical #4 WBS Summary | Tie-in Mechanical #4 | Active | 04/20/26 | 05/29/26 | 11.2 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.1920 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical #6 WBS Summary | Tie-in Mechanical #6 | Active | 04/20/26 | 05/29/26 | 11.2 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.2020 |
RPL10.MCUP.Loop 2 - Tie-in Mechanical #8 WBS Summary | Tie-in Mechanical #8 | Active | 04/20/26 | 05/29/26 | 13.8 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.2640 |
RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #4 | Tie-in Mechanical #4 | Active | 04/20/26 | 05/29/26 | 3.8 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.2680 |
RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #6 | Tie-in Mechanical #6 | Active | 04/20/26 | 05/29/26 | 3.8 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.2720 |
RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #8 | Tie-in Mechanical #8 | Active | 04/20/26 | 05/29/26 | 3.8 | 5.0 |
|
131.2 |
RPL10.SSB.BB.1160 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Waterproofing and Flashing | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 04/20/26 | 04/20/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.WP2.GSIDF.2000 |
RPL10.Conn Ext IDF Huts - Install GS Cabling Pull/Term/Test (13x GS.IDF) ~5060 LF - WBS Summary | Exterior | Active | 04/20/26 | 10/01/26 | 145.0 | 113.8 |
|
743.8 |
RPL10.WP2.GSIDF.2800 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) mCup NX11 WBS Summary | GSIDFNX11 | Active | 04/20/26 | 07/10/26 | 72.5 | 41.2 |
|
816.2 |
RPL10.WP2.GSIDF.2820 |
RPL10.Conn GSIDFNX11 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.WP2.GSIDF.2880 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) mCup NX12 WBS Summary | GSIDFNX12 | Active | 04/20/26 | 07/21/26 | 81.2 | 50.0 |
|
807.5 |
RPL10.WP2.GSIDF.2900 |
RPL10.Conn GSIDFNX12 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.WP2.GSIDF.2960 |
RPL10.Conn GSIDFNX13 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Complete | 04/20/26 | 04/24/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01160 |
RPL10.EY.NS4 - Install Tent Overhead Doors | Tent and Temp Conditions | Complete | 04/21/26 | 04/28/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01180 |
RPL10.Interior.Center-Corridor - BoW - Install Plumbing Lowside OH and In-wall | Balance of Walls & OverHead | Complete | 04/21/26 | 04/27/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.6300 |
RPL10.Interior.End-Corridor - Priority - P7 Wall Tape Finish Paint (Both Sides) | Priority Wall (P7) - Grid Line 10-02 | Complete | 04/21/26 | 04/29/26 | 10.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01145 |
RPL10.Interior.NS1 - OFE - Electrical Panels (ATS) - Set / Anchor | OFE | Complete | 04/21/26 | 04/28/26 | 6.2 | 0.0 |
|
0.0 |