Schedule Viewer

Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer · Uploaded Jun 03, 2026 01:35 PM · 9281 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
71
Completed
29
In Progress
71
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.INT.SSBC.02340 RPL10.Interior.SSB-Corridor - BoW - Shell Space Walls (micro plan for finishes) Balance of Walls & OverHead Complete 04/13/26 04/15/26 5.0 0.0
100%
0.0
RPL10.MCUP.LP1.1800 RPL10.MCUP.Loop 1 - Tie-in BMS #5 Tie-Ins BMS Complete 04/13/26 05/22/26 8.8 0.0
100%
0.0
RPL10.MCUP.LP1.1980 RPL10.MCUP.Loop 1 - Tie-in Mechanical #7 WBS Summary Tie-in Mechanical #7 Complete 04/13/26 05/15/26 3.8 0.0
100%
0.0
RPL10.MCUP.LP1.2700 RPL10.MCUP.Loop 1 - Facility Water Tie-in Mechanical #7 Tie-in Mechanical #7 Complete 04/13/26 04/15/26 3.8 0.0
100%
0.0
RPL10.MCUP.LP1.2720 RPL10.MCUP.Loop 1 - Condenser Water Tie-in Mechanical #7 Tie-in Mechanical #7 Complete 04/13/26 05/15/26 3.8 0.0
100%
0.0
RPL10.MCUP.LP2.1580 RPL10.MCUP.Loop 2 - Tie-in Mechanical (LOE) Tie-Ins Mechanical Active 04/13/26 06/10/26 30.0 15.0
0%
132.5
RPL10.MCUP.LP2.1600 RPL10.MCUP.Loop 2 - Tie-in Mechanical #2 WBS Summary Tie-in Mechanical #2 Active 04/13/26 05/29/26 20.0 5.0
0%
136.2
RPL10.MCUP.LP2.2560 RPL10.MCUP.Loop 2 - Set Remaining Facility water piping rack with All Racks Welding OFE Complete 04/13/26 05/22/26 12.5 0.0
100%
0.0
RPL10.MCUP.LP2.2600 RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #2 Tie-in Mechanical #2 Active 04/13/26 05/29/26 3.8 5.0
0%
136.2
RPL10.SSBC.BB.1340 RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - Arch Finishes - Frame, Hang Drywall, Paint, Final Finishes (LOE) Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Active 04/13/26 05/26/26 25.0 1.2
0%
170.0
RPL10.SSBC.BB.1440 RPL10.Int.Build Back.SSB-Corr - Interior Leave Out (SSB Corridor) #2, #3, #4 WBS Summary Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Active 04/13/26 06/17/26 58.8 21.2
0%
170.0
RPL10.SSBC.BB.3155 RPL10.Int.Build Back.SSB-Corr - LO #2,3 - Frame Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Complete 04/13/26 04/14/26 25.0 0.0
100%
0.0
RPL10.SSBC.BB.3175 RPL10.Int.Build Back.SSB-Corr - LO #2,3 - MEPF - In Wall Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Complete 04/13/26 04/14/26 25.0 0.0
100%
0.0
RPL10.SSBC.BB.3215 RPL10.Int.Build Back.SSB-Corr - LO #2,3 - Tape, Float and Paint Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Complete 04/13/26 05/01/26 25.0 0.0
100%
0.0
RPL10.EY.EF1.01620 RPL10.EY.EF1 - Install RPL-1 FSP Columns Cap Erect Shoring & Decking & F/R/P Fiber Support Platform - RPL-1 Complete 04/14/26 04/24/26 7.5 0.0
100%
0.0
RPL10.EY.SSB.01175 RPL10.EY.SSB - Install Mechanical Tie-ins Tie-ins Complete 04/14/26 05/11/26 12.5 0.0
100%
0.0
RPL10.INT.CTRC.01380 RPL10.Interior.Center-Corridor - BoW - Install Cable Tray (Early) Balance of Walls & OverHead Complete 04/14/26 04/24/26 6.2 0.0
100%
0.0
RPL10.INT.ENDC.01080 RPL10.Interior.End-Corridor - BoW - Install Electrical Lowside OH and In-wall Balance of Walls & Overhead Complete 04/14/26 05/13/26 8.8 0.0
100%
0.0
RPL10.INT.ENDC.1520 RPL10.Interior.End-Corridor - BoW - Install Backing and In-Wall BoW Balance of Walls & Overhead Complete 04/14/26 04/24/26 6.2 0.0
100%
0.0
RPL10.INT.ENDC.6400 RPL10.Interior.End-Corridor - Priority - QC - P7 Wall - Backing/In-Wall Priority Wall (P7) - Grid Line 10-02 Complete 04/14/26 04/15/26 2.5 0.0
100%
0.0
RPL10.INT.NS1.01203 RPL10.Interior.NS1 - MES Skids - CDU Tie-Ins NS1 - MES Skids Active 04/14/26 05/29/26 30.0 5.0
0%
133.8
RPL10.MCUP.LP2.1480 RPL10.MCUP.Loop 2 - Set Electrical Skids #6 OFE Complete 04/14/26 04/15/26 2.5 0.0
100%
0.0
RPL10.MCUP.LP2.1500 RPL10.MCUP.Loop 2 - Set Electrical Skids #8 OFE Complete 04/14/26 04/15/26 2.5 0.0
100%
0.0
RPL.10.D.X3760.XG RMUs/MV Skids Set - mCUP South Give Milestones (XREFs) Complete 04/15/26 04/15/26 0.0 0.0
100%
0.0
RPL10.INT.CTRC.01330 RPL10.Interior.Center-Corridor - BoW - Hang Drywall BoW Balance of Walls & OverHead Complete 04/15/26 04/24/26 8.8 0.0
100%
0.0
RPL10.INT.CTRC.01910 RPL10.Interior.Center-Corridor - BoW - Install Backing Balance of Walls & OverHead Complete 04/15/26 04/21/26 6.2 0.0
100%
0.0
RPL10.INT.ENDC.1300 RPL10.Interior.End-Corridor - BoW - Install Plumbing Lowside OH and In-wall Balance of Walls & Overhead Complete 04/15/26 05/18/26 10.0 0.0
100%
0.0
RPL10.INT.NS2.01350 RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS2 Control Fault Domain 4 Active 04/15/26 05/29/26 46.2 5.0
0%
11.2
RPL10.INT.NS2.02565 RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle) - Row 10 OFE NS2 Control Fault Domain 4 Complete 04/15/26 04/15/26 1.2 0.0
100%
0.0
RPL10.INT.NS2.03285 RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (LV Side Aisle) - Remaining (11-13) OFE NS2 Control Fault Domain 4 Complete 04/15/26 04/20/26 3.8 0.0
100%
0.0
RPL10.INT.SSB.01130 RPL10.Interior.SSB - BoW - Paint (1st Coat) Balance of Walls and OverHead Complete 04/15/26 04/17/26 3.8 0.0
100%
0.0
RPL10.SSBC.BB.3195 RPL10.Int.Build Back.SSB-Corr - LO #2,3 - Hang Drywall Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Complete 04/15/26 04/20/26 25.0 0.0
100%
0.0
RPL10.INT.ENDC.06820 RPL10.Interior.End-Corridor - BoW - Install Remaining Unistruts & Hangers Balance of Walls & Overhead Complete 04/16/26 04/22/26 6.2 0.0
100%
0.0
RPL10.INT.NS2.01112 RPL10.Interior.NS2 - MES Skids - Final Piping Tie-Ins & Inspections NS2 - MES Skids Active 04/16/26 05/26/26 30.0 1.2
0%
32.5
RPL10.INT.NS2.02465 RPL10.Interior.NS2 - OFE - Control Fault Domain 6 SQ1.2 - (HAC) OFE NS2 Control Fault Domain 6 Complete 04/16/26 05/08/26 25.0 0.0
100%
0.0
RPL10.INT.SSB.01290 RPL10.Interior.SSB - BoW - Frame Hard Lid Balance of Walls and OverHead Complete 04/16/26 04/22/26 6.2 0.0
100%
0.0
RPL10.MCUP.LP1.1940 RPL10.MCUP.Loop 1 - Tie-in BMS #7 Tie-Ins BMS Complete 04/16/26 05/22/26 10.0 0.0
100%
0.0
RPL.CM.D.N5665.XR Smalling Widening (LA 183 to Jaggers) Logistics - Off-Site Receive XREF Milsetones Complete 04/17/26 04/17/26 0.0 0.0
100%
0.0
RPL.CM.D.N5670.XR Smalling Repave (LA 183 to Jaggers) Logistics - Off-Site Receive XREF Milsetones Complete 04/17/26 04/17/26 0.0 0.0
100%
0.0
RPL10.EY.EF1.01150 RPL10.EY.EF1 - Install RPL-2 FSP Columns F/R/P Fiber Support Platform - RPL-2 Complete 04/17/26 04/22/26 7.5 0.0
100%
0.0
RPL10.EY.ENDC.01270 RPL10.Interior.End-Corridor - Install Temp Conditioning Return Duct (Inside) Priority Walls & OverHead Complete 04/17/26 04/24/26 11.2 0.0
100%
0.0
RPL10.INT.CTRC.01210 RPL10.Interior.Center-Corridor - BoW - Install Electrical Lowside OH and In-wall Balance of Walls & OverHead Complete 04/17/26 04/29/26 6.2 0.0
100%
0.0
RPL10.INT.CTRC.01930 RPL10.Interior.Center-Corridor - BoW - QC BoW - Backing/In-Wall Balance of Walls & OverHead Complete 04/17/26 04/24/26 6.2 0.0
100%
0.0
RPL10.INT.SSB.07060 RPL10.Interior.SSB - Kitchen - Hang Drywall, Tape, Float, Paint (Remaining) Kitchen and Office Spaces Complete 04/17/26 04/28/26 6.2 0.0
100%
0.0
RPL10.INT.SSBC.02280 RPL10.Interior.SSB-Corridor - BoW - Install Electrical Carrier MDF (10.N2.09) Balance of Walls & OverHead Complete 04/17/26 05/04/26 8.8 0.0
100%
0.0
RPL10.INT.SSBC.02600 RPL10.Interior.SSB-Corridor - BoW - Install Fire Safing/ Seal all Penetrations (Lowside space) Balance of Walls & OverHead Complete 04/17/26 04/23/26 6.2 0.0
100%
0.0
RPL10.MCUP.LP1.2040 RPL10.MCUP.Loop 1 - Install Mcup Paving *Start 04/10 Hardscape and Landscape Active 04/17/26 06/24/26 18.8 27.5
100%
443.8
RPL10.MCUP.LP2.1560 RPL10.MCUP.Loop 2 - Tie-in Electrical (LOE) Tie-Ins Electrical Active 04/17/26 06/01/26 26.2 6.2
0%
131.2
RPL10.MCUP.LP2.1620 RPL10.MCUP.Loop 2 - Tie-in Electrical #2 Tie-Ins Electrical Active 04/17/26 05/29/26 11.2 5.0
0%
132.5
RPL10.MCUP.LP2.1740 RPL10.MCUP.Loop 2 - Tie-in Electrical #4 Tie-Ins Electrical Active 04/17/26 06/01/26 8.8 5.0
0%
131.2
RPL10.SSB.BB.1000 RPL10.Ext.Build Back.SSB - Exterior Leave Out #5 ( East SSB Area) WBS Summary Build Back Exterior Leave Out Wall #5 (East SSB) Active 04/17/26 07/17/26 80.0 22.5
0%
405.0
RPL10.SSB.BB.1140 RPL10.Ext.Build Back.SSB - LO #5 - F/R/P Stem wall Build Back Exterior Leave Out Wall #5 (East SSB) Complete 04/17/26 04/20/26 3.8 0.0
100%
0.0
JCL.C.1360 RPL10 - Cost Risk LOE-19 Connectivity Package 2 - GS Carrier SFZ Cost LOEs Active 04/20/26 12/21/26 233.8 181.2
0%
126.2
RPL.CM.D.C5500.XR Galaxy Road Logistics - Onsite Receive XREF Milestones Complete 04/20/26 04/20/26 0.0 0.0
100%
0.0
RPL.CM.D.N5605.XR LA 183 /Burn Road - Traffic Signal Logistics - Off-Site Receive XREF Milsetones Complete 04/20/26 04/20/26 0.0 0.0
100%
0.0
RPL10.EY.NS4.01140 RPL10.EY.NS4 - Install Tent Electrical Panels Tent and Temp Conditions Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.EY.NS4.01150 RPL10.EY.NS4 - Install Tent Heating and Cooling Equipment Tent and Temp Conditions Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.EY.NS4.01190 RPL10.EY.NS4 - Install Tent Mechanical Tie-ins Tent and Temp Conditions Complete 04/20/26 04/24/26 7.5 0.0
100%
0.0
RPL10.INT.CTRC.01230 RPL10.Interior.Center-Corridor - BoW - Install Security Lowside OH and In-wall Balance of Walls & OverHead Complete 04/20/26 05/04/26 8.8 0.0
100%
0.0
RPL10.INT.EF1.01750 RPL10.Interior.EF1 - Piping Tie-Ins to FW Loop (From MES Skids) Tie-Ins Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.INT.EF2.01210 RPL10.Interior.EF2 - Tie-ins - WBS Summary Tie-Ins Active 04/20/26 08/24/26 111.2 75.0
0%
145.0
RPL10.INT.EF2.01810 RPL10.Interior.EF2 - Piping Tie-Ins to FW Loop (From MES Skids) Tie-Ins Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.INT.NS1.01225 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Complete 04/20/26 04/21/26 25.0 0.0
100%
0.0
RPL10.INT.NS1.01770 RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install Duct (LV Side) LV Side Tie-ins Complete 04/20/26 04/20/26 5.0 0.0
100%
0.0
RPL10.INT.NS1.01800 RPL10.Interior.NS1 - Tie-ins - Control Fault Domain 2 SQ5.1 - WBS Summary Tie-Ins NS1 Control Fault Domain 2 Active 04/20/26 07/14/26 75.0 43.8
0%
83.8
RPL10.INT.NS1.01910 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install Duct (LV Side) LV Side Tie-ins Complete 04/20/26 04/20/26 5.0 0.0
100%
0.0
RPL10.INT.NS1.01940 RPL10.Interior.NS1 - Tie-ins - Control Fault Domain 1 SQ6.1 - WBS Summary Tie-Ins NS1 Control Fault Domain 1 Active 04/20/26 07/10/26 72.5 41.2
0%
92.5
RPL10.INT.NS1.02480 RPL10.Interior.NS1 - OFE - Control Fault Domain 5 SQ2.1 (HAC) OFE NS1 Control Fault Domain 5 Complete 04/20/26 04/30/26 18.8 0.0
100%
0.0
RPL10.INT.NS2.01065 RPL10.Interior.NS2 - OFE - Electrical Panels (ATS) - Set / Anchor OFE Complete 04/20/26 04/28/26 6.2 0.0
100%
0.0
RPL10.INT.NS2.01130 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Duct (LV Side) LV Side Tie-ins Complete 04/20/26 04/20/26 6.2 0.0
100%
0.0
RPL10.INT.NS2.01160 RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 6 SQ1.2 - WBS Summary Tie-Ins NS2 Control Fault Domain 6 Active 04/20/26 07/14/26 75.0 43.8
0%
8.8
RPL10.INT.NS2.01220 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Complete 04/20/26 05/12/26 6.2 0.0
100%
0.0
RPL10.INT.NS2.01260 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (LV Side) LV Side Tie-ins Complete 04/20/26 04/20/26 5.0 0.0
100%
0.0
RPL10.INT.NS2.01300 RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 5 SQ2.2 - WBS Summary Tie-Ins NS2 Control Fault Domain 5 Active 04/20/26 07/21/26 75.0 50.0
0%
12.5
RPL10.INT.NS2.02020 RPL10.Interior.NS2 - OFE - Ancillary Skids - Set / Place / Anchor (04.01.26) OFE Complete 04/20/26 04/24/26 5.0 0.0
100%
0.0
RPL10.INT.NS3.02360 RPL10.Interior.NS3 - Priority - Install Security OverHead Complete 04/20/26 04/21/26 2.5 0.0
100%
0.0
RPL10.INT.NS4.02360 RPL10.Interior.NS4 - Priority - Install Security OverHead Complete 04/20/26 04/21/26 2.5 0.0
100%
0.0
RPL10.INT.SSBC.02900 RPL10.Interior.SSB-Corridor - BoW - Final Paint Balance of Walls & OverHead Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.MCUP.LP1.1780 RPL10.MCUP.Loop 1 - Tie-in EPMS #5 Tie-Ins EPMS Complete 04/20/26 05/22/26 7.5 0.0
100%
0.0
RPL10.MCUP.LP1.1840 RPL10.MCUP.Loop 1 - Install Sleeves MEPL Hardscape and Landscape Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.MCUP.LP1.1900 RPL10.MCUP.Loop 1 - Tie-in EPMS #7 Tie-Ins EPMS Complete 04/20/26 05/22/26 8.8 0.0
100%
0.0
RPL10.MCUP.LP2.1520 RPL10.MCUP.Loop 2 - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Active 04/20/26 08/14/26 103.8 72.5
0%
411.2
RPL10.MCUP.LP2.1540 RPL10.MCUP.Loop 2 - Install Sleeves MEPL Hardscape and Landscape Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.MCUP.LP2.1800 RPL10.MCUP.Loop 2 - Tie-in Mechanical #4 WBS Summary Tie-in Mechanical #4 Active 04/20/26 05/29/26 11.2 5.0
0%
131.2
RPL10.MCUP.LP2.1920 RPL10.MCUP.Loop 2 - Tie-in Mechanical #6 WBS Summary Tie-in Mechanical #6 Active 04/20/26 05/29/26 11.2 5.0
0%
131.2
RPL10.MCUP.LP2.2020 RPL10.MCUP.Loop 2 - Tie-in Mechanical #8 WBS Summary Tie-in Mechanical #8 Active 04/20/26 05/29/26 13.8 5.0
0%
131.2
RPL10.MCUP.LP2.2640 RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #4 Tie-in Mechanical #4 Active 04/20/26 05/29/26 3.8 5.0
0%
131.2
RPL10.MCUP.LP2.2680 RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #6 Tie-in Mechanical #6 Active 04/20/26 05/29/26 3.8 5.0
0%
131.2
RPL10.MCUP.LP2.2720 RPL10.MCUP.Loop 2 - Facility Water Tie-in Mechanical #8 Tie-in Mechanical #8 Active 04/20/26 05/29/26 3.8 5.0
0%
131.2
RPL10.SSB.BB.1160 RPL10.Ext.Build Back.SSB - LO #5 - Install Waterproofing and Flashing Build Back Exterior Leave Out Wall #5 (East SSB) Complete 04/20/26 04/20/26 2.5 0.0
100%
0.0
RPL10.WP2.GSIDF.2000 RPL10.Conn Ext IDF Huts - Install GS Cabling Pull/Term/Test (13x GS.IDF) ~5060 LF - WBS Summary Exterior Active 04/20/26 10/01/26 145.0 113.8
0%
743.8
RPL10.WP2.GSIDF.2800 RPL10.Conn IDF Huts - (GSMDF to GSIDF) mCup NX11 WBS Summary GSIDFNX11 Active 04/20/26 07/10/26 72.5 41.2
0%
816.2
RPL10.WP2.GSIDF.2820 RPL10.Conn GSIDFNX11 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.WP2.GSIDF.2880 RPL10.Conn IDF Huts - (GSMDF to GSIDF) mCup NX12 WBS Summary GSIDFNX12 Active 04/20/26 07/21/26 81.2 50.0
0%
807.5
RPL10.WP2.GSIDF.2900 RPL10.Conn GSIDFNX12 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.WP2.GSIDF.2960 RPL10.Conn GSIDFNX13 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Complete 04/20/26 04/24/26 6.2 0.0
100%
0.0
RPL10.EY.NS4.01160 RPL10.EY.NS4 - Install Tent Overhead Doors Tent and Temp Conditions Complete 04/21/26 04/28/26 6.2 0.0
100%
0.0
RPL10.INT.CTRC.01180 RPL10.Interior.Center-Corridor - BoW - Install Plumbing Lowside OH and In-wall Balance of Walls & OverHead Complete 04/21/26 04/27/26 6.2 0.0
100%
0.0
RPL10.INT.ENDC.6300 RPL10.Interior.End-Corridor - Priority - P7 Wall Tape Finish Paint (Both Sides) Priority Wall (P7) - Grid Line 10-02 Complete 04/21/26 04/29/26 10.0 0.0
100%
0.0
RPL10.INT.NS1.01145 RPL10.Interior.NS1 - OFE - Electrical Panels (ATS) - Set / Anchor OFE Complete 04/21/26 04/28/26 6.2 0.0
100%
0.0