Schedule Viewer

Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer · Uploaded Jun 03, 2026 01:35 PM · 9281 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
63
Completed
37
In Progress
63
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.INT.NS1.02070 RPL10.Interior.NS1 - OFE - Ancillary Skids - Set / Place / Anchor (04.01.26) OFE Complete 04/21/26 04/24/26 5.0 0.0
100%
0.0
RPL10.INT.NS2.01490 RPL10.Interior.NS2 - OFE - Control Fault Domain 3 SQ4.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS2 Control Fault Domain 3 Active 04/21/26 06/22/26 55.0 20.0
0%
7.5
RPL10.INT.NS2.02625 RPL10.Interior.NS2 - OFE - Control Fault Domain 3 SQ4.2 (LV Side Aisle) OFE NS2 Control Fault Domain 3 Complete 04/21/26 04/23/26 5.0 0.0
100%
0.0
RPL10.INT.NS4.01070 RPL10.Interior.NS4 - OFE - MES Skids - Set / Place / Anchor OFE Active 04/21/26 05/28/26 25.0 3.8
0%
130.0
RPL10.INT.SSBC.02260 RPL10.Interior.SSB-Corridor - BoW - Install Electrical Carrier MDF (10.N1.09) Balance of Walls & OverHead Complete 04/21/26 05/04/26 8.8 0.0
100%
0.0
RPL10.MCUP.LP2.1680 RPL10.MCUP.Loop 2 - Tie-in EPMS (LOE) Tie-Ins EPMS Active 04/21/26 06/02/26 32.5 7.5
0%
131.2
RPL10.MCUP.LP2.1700 RPL10.MCUP.Loop 2 - Tie-in EPMS #2 Tie-Ins EPMS Active 04/21/26 06/01/26 8.8 5.0
0%
132.5
RPL10.MCUP.LP2.1780 RPL10.MCUP.Loop 2 - Tie-in EPMS #4 Tie-Ins EPMS Active 04/21/26 06/02/26 7.5 5.0
0%
131.2
RPL10.SSB.BB.1180 RPL10.Ext.Build Back.SSB - LO #5 - Install IMP Wall Exterior Panel Build Back Exterior Leave Out Wall #5 (East SSB) Complete 04/21/26 04/21/26 2.5 0.0
100%
0.0
RPL10.EY.EF2.01160 RPL10.EY.EF2 - Install RPL-3 FSP Columns F/R/P Fiber Support Platform - RPL-3 Complete 04/22/26 04/29/26 6.2 0.0
100%
0.0
RPL10.EY.ENDC.01250 RPL10.EY.End - Install Temp Conditioning Units OFE Complete 04/22/26 04/22/26 1.2 0.0
100%
0.0
RPL10.EY.NS2.01240 RPL10.EY.NS2 - Install GS.IDF Hut (1x GS.IDF) NX06 (04.22.26) OFE Complete 04/22/26 04/28/26 6.2 0.0
100%
0.0
RPL10.EY.NS2.01270 RPL10.EY.NS2 - Install GS.IDF Hut (1x GS.IDF) NX07 (04.22.26) OFE Complete 04/22/26 04/28/26 6.2 0.0
100%
0.0
RPL10.EY.NS4.01180 RPL10.EY.NS4 - Install Tent Electrical Tie-ins Tent and Temp Conditions Complete 04/22/26 04/24/26 3.8 0.0
100%
0.0
RPL10.INT.CTRC.01630 RPL10.Interior.Center-Corridor - BoW - Install Refrigerant Piping Lowside OH on Supplemental Steel Balance of Walls & OverHead Complete 04/22/26 05/13/26 6.2 0.0
100%
0.0
RPL10.INT.CTRC.07720 RPL10.Interior.Center-Corridor - Priority - Install Exterior Wall Drywall, Tape, Float, Paint (Remaining) Priority Walls & OverHead Complete 04/22/26 05/04/26 3.8 0.0
100%
0.0
RPL10.INT.ENDC.01010 RPL10.Interior.End-Corridor - Priority - Install Duct (Highside OH space) Priority Walls & OverHead Complete 04/22/26 05/05/26 12.5 0.0
100%
0.0
RPL10.INT.ENDC.1400 RPL10.Interior.End-Corridor - BoW - Install Door Frames Balance of Walls & Overhead Complete 04/22/26 05/04/26 6.2 0.0
100%
0.0
RPL10.INT.NS1.01184 RPL10.Interior.NS1 - Electrical Panels/Ancillary Skid (ATS,SB House,MCB,MLO, Transformer) - Tie-ins NS1 - LV Skids and TopHat Active 04/22/26 06/05/26 18.8 11.2
0%
25.0
RPL10.INT.NS1.01280 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Set TWMS, UPS and Panel (2) Remaining Tie-ins post Mech Side Aisle install Complete 04/22/26 05/20/26 25.0 0.0
100%
0.0
RPL10.INT.NS1.01330 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Complete 04/22/26 04/29/26 6.2 0.0
100%
0.0
RPL10.INT.NS1.01460 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Complete 04/22/26 05/01/26 5.0 0.0
100%
0.0
RPL10.INT.NS1.02500 RPL10.Interior.NS1 - OFE - Control Fault Domain 5 SQ2.1 (Mech Side Aisle) OFE NS1 Control Fault Domain 5 Complete 04/22/26 05/01/26 16.2 0.0
100%
0.0
RPL10.INT.NS2.02485 RPL10.Interior.NS2 - OFE - Control Fault Domain 6 SQ1.2 - (Mech Side Aisle) OFE NS2 Control Fault Domain 6 Complete 04/22/26 05/08/26 22.5 0.0
100%
0.0
RPL10.INT.SSB.02520 RPL10.Interior.SSB - BoW - ACT - Set Wall Angle Balance of Walls and OverHead Complete 04/22/26 05/01/26 8.8 0.0
100%
0.0
RPL10.MCUP.LP2.1660 RPL10.MCUP.Loop 2 - Tie-in BMS (LOE) Tie-Ins BMS Active 04/22/26 06/03/26 31.2 8.8
0%
131.2
RPL10.MCUP.LP2.1720 RPL10.MCUP.Loop 2 - Tie-in BMS #2 Tie-Ins BMS Active 04/22/26 06/02/26 11.2 5.0
0%
132.5
RPL10.MCUP.LP2.1820 RPL10.MCUP.Loop 2 - Tie-in BMS #4 Tie-Ins BMS Active 04/22/26 06/03/26 8.8 5.0
0%
131.2
RPL10.MCUP.LP2.1880 RPL10.MCUP.Loop 2 - Tie-in BMS #6 Tie-Ins BMS Active 04/22/26 06/03/26 8.8 5.0
0%
131.2
RPL10.MCUP.LP2.1980 RPL10.MCUP.Loop 2 - Tie-in BMS #8 Tie-Ins BMS Active 04/22/26 06/03/26 11.2 5.0
0%
131.2
RPL10.CTRC.BB.2000 RPL10.Int.Build Back.Center-Corr - LO #12 - P3 Frame Remaining Wall & MEP In-Wall/Backing (Around 30"" Mech Pipe) Build Back Interior Leave Out Wall #12 #13 @ 30"" Mech Piping (Center Corr) Complete 04/23/26 05/04/26 2.5 0.0
100%
0.0
RPL10.EY.EF1.01660 RPL10.EY.EF1 - FSP2 - Install Columns Cap Erect Shoring & Decking & F/R/P Fiber Support Platform - RPL-2 Complete 04/23/26 05/04/26 7.5 0.0
100%
0.0
RPL10.INT.NS4.02440 RPL10.Interior.NS43 - Temp Conditions - Drop Curtains (from Corridor to EJ) Temp Conditions Complete 04/23/26 04/24/26 2.5 0.0
100%
0.0
RPL10.INT.NS4.02460 RPL10.Interior.NS43 - Temp Conditions - Install Early Temp Conditions Temp Conditions Complete 04/23/26 04/24/26 2.5 0.0
100%
0.0
RPL10.INT.SSB.01310 RPL10.Interior.SSB - BoW - MEPF Hard Lid Rough-In Balance of Walls and OverHead Complete 04/23/26 05/01/26 6.2 0.0
100%
0.0
RPL10.MCUP.LP2.1840 RPL10.MCUP.Loop 2 - Tie-in EPMS #6 Tie-Ins EPMS Active 04/23/26 06/02/26 7.5 5.0
0%
131.2
RPL10.MCUP.LP2.1900 RPL10.MCUP.Loop 2 - Tie-in Electrical #6 Tie-Ins Electrical Active 04/23/26 06/01/26 8.8 5.0
0%
131.2
RPL10.MCUP.LP2.1940 RPL10.MCUP.Loop 2 - Tie-in EPMS #8 Tie-Ins EPMS Active 04/23/26 06/02/26 8.8 5.0
0%
131.2
RPL10.MCUP.LP2.2620 RPL10.MCUP.Loop 2 - Condenser WaterTie-in Mechanical #2 Tie-in Mechanical #2 Active 04/23/26 05/29/26 10.0 5.0
0%
136.2
RPL10.MCUP.LP2.2660 RPL10.MCUP.Loop 2 - Condenser Water Tie-in Mechanical #4 Tie-in Mechanical #4 Active 04/23/26 05/29/26 7.5 5.0
0%
131.2
RPL10.MCUP.LP2.2700 RPL10.MCUP.Loop 2 - Condenser Water Tie-in Mechanical #6 Tie-in Mechanical #6 Active 04/23/26 05/29/26 7.5 5.0
0%
131.2
RPL10.MCUP.LP2.2740 RPL10.MCUP.Loop 2 - Condenser Water Tie-in Mechanical #8 Tie-in Mechanical #8 Active 04/23/26 05/29/26 10.0 5.0
0%
131.2
RPL10.EY.EF2.01200 RPL10.EY.EF2 - Install RPL-5 FSP Columns F/R/P Fiber Support Platform - RPL-5 Complete 04/24/26 05/01/26 6.2 0.0
100%
0.0
RPL10.INT.CTRC.01650 RPL10.Interior.Center-Corridor - BoW - Tape, Float and Paint BoW Balance of Walls & OverHead Complete 04/24/26 05/04/26 5.0 0.0
100%
0.0
RPL10.INT.EF1.01410 RPL10.Interior.EF1 - EF1 East - Install Lower Trays East EF-1 Complete 04/24/26 05/18/26 6.2 0.0
100%
0.0
RPL10.INT.NS1.01204 RPL10.Interior.NS1 - MES Skids - BMS Tie-Ins NS1 - MES Skids Active 04/24/26 06/10/26 30.0 3.8
0%
133.8
RPL10.INT.NS2.01630 RPL10.Interior.NS2 - OFE - Control Fault Domain 2 SQ5.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS2 Control Fault Domain 2 Active 04/24/26 07/14/26 70.0 20.0
0%
5.0
RPL10.INT.NS2.02685 RPL10.Interior.NS2 - OFE - Control Fault Domain 2 SQ5.2 (LV Side Aisle) OFE NS2 Control Fault Domain 2 Complete 04/24/26 04/27/26 5.0 0.0
100%
0.0
RPL10.MCUP.LP2.2000 RPL10.MCUP.Loop 2 - Tie-in Electrical #8 Tie-Ins Electrical Active 04/24/26 06/01/26 11.2 5.0
0%
131.2
RPL10.EY.EF1.01640 RPL10.EY.EF1 - FSP1 - Install Columns Cap Cure Fiber Support Platform - RPL-1 Complete 04/26/26 05/09/26 8.8 0.0
100%
0.0
RPL10.EY.EF1.01310 RPL10.EY.EF1 - FSP1 - Install Roofing Z Purlin (Logistic #7 Install) Fiber Support Platform - RPL-1 Complete 04/27/26 05/08/26 12.5 0.0
100%
0.0
RPL10.EY.EF2.01930 RPL10.EY.EF2 - FSP3 - Install FSP Anchor Bolt Procurement Delay Fiber Support Platform - RPL-3 Complete 04/27/26 05/07/26 6.2 0.0
100%
0.0
RPL10.EY.NS3.01140 RPL10.EY.NS3 - Install Tent Electrical Panels Tent and Temp Conditions Complete 04/27/26 04/28/26 6.2 0.0
100%
0.0
RPL10.EY.NS3.01150 RPL10.EY.NS3 - Install Tent Heating and Cooling Equipment Tent and Temp Conditions Complete 04/27/26 04/28/26 6.2 0.0
100%
0.0
RPL10.EY.NS3.01180 RPL10.EY.NS3 - Install Tent Electrical Tie-ins Tent and Temp Conditions Complete 04/27/26 04/28/26 3.8 0.0
100%
0.0
RPL10.EY.NS3.01190 RPL10.EY.NS3 - Install Tent Mechanical Tie-ins Tent and Temp Conditions Complete 04/27/26 04/28/26 7.5 0.0
100%
0.0
RPL10.INT.NS1.01300 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Active 04/27/26 05/26/26 25.0 1.2
0%
11.2
RPL10.INT.NS1.01355 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Complete 04/27/26 05/11/26 25.0 0.0
100%
0.0
RPL10.INT.NS1.01370 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install FW Remaining Tie-ins post Mech Side Aisle install Active 04/27/26 05/26/26 25.0 1.2
0%
21.2
RPL10.INT.NS1.02220 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install TW Remaining Tie-ins post Mech Side Aisle install Active 04/27/26 05/26/26 25.0 1.2
0%
21.2
RPL10.INT.NS1.03320 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Complete 04/27/26 05/22/26 25.0 0.0
100%
0.0
RPL10.INT.NS2.01400 RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Duct (LV Side) LV Side Tie-ins Complete 04/27/26 04/27/26 5.0 0.0
100%
0.0
RPL10.INT.NS2.01430 RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 4 SQ3.2 (including IDF) - WBS Summary Tie-Ins NS2 Control Fault Domain 4 Active 04/27/26 07/14/26 68.8 43.8
0%
42.5
RPL10.INT.NS2.01540 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install Duct (LV Side) LV Side Tie-ins Complete 04/27/26 04/27/26 5.0 0.0
100%
0.0
RPL10.INT.NS2.01570 RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 3 SQ4.2 - WBS Summary Tie-Ins NS2 Control Fault Domain 3 Active 04/27/26 07/24/26 78.8 53.8
0%
60.0
RPL10.SSB.BB.1120 RPL10.Ext.Build Back.SSB - LO #5 - Install Exterior Backing, In-Wall Build Back Exterior Leave Out Wall #5 (East SSB) Complete 04/27/26 05/01/26 5.0 0.0
100%
0.0
RPL10.CTRC.BB.2020 RPL10.Int.Build Back.Center-Corr - LO #12 - P3 Hang Drywall (Around 30"" Mech Pipe) Build Back Interior Leave Out Wall #12 #13 @ 30"" Mech Piping (Center Corr) Complete 04/28/26 05/07/26 2.5 0.0
100%
0.0
RPL10.EY.EF2.01830 RPL10.EY.EF2 - FSP5 - Install Columns Cap Erect Shoring & Decking & F/R/P (DPR Side) Fiber Support Platform - RPL-5 Complete 04/28/26 05/04/26 7.5 0.0
100%
0.0
RPL10.EY.ENDC.01145 RPL10.EY.End - Install Mechanical Tie-ins Tie-ins Complete 04/28/26 05/11/26 12.5 0.0
100%
0.0
RPL10.EY.NS2.01250 RPL10.EY.NS2 - Install Electrical Tie-ins (include penetration detail) Tie-ins Complete 04/28/26 05/13/26 12.5 0.0
100%
0.0
RPL10.EY.NS2.01260 RPL10.EY.NS2 - Tie-ins - WBS Summary Tie-ins Active 04/28/26 06/09/26 38.8 13.8
0%
61.2
RPL10.INT.NS2.01094 RPL10.Interior.NS2 - Electrical Panels/Ancillary Skid (ATS,SB House,MCB,MLO, Transformer) - Tie-Ins NS2 - LV Skids and TopHat Active 04/28/26 06/15/26 18.8 18.8
0%
27.5
RPL10.INT.NS2.01790 RPL10.Interior.NS2 - OFE - Control Fault Domain 1 SQ6.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS2 Control Fault Domain 1 Active 04/28/26 08/04/26 86.2 20.0
0%
2.5
RPL10.INT.NS2.02745 RPL10.Interior.NS2 - OFE - Control Fault Domain 1 SQ6.2 (LV Side Aisle) OFE NS2 Control Fault Domain 1 Complete 04/28/26 04/29/26 5.0 0.0
100%
0.0
RPL10.INT.SSB.02540 RPL10.Interior.SSB - BoW - ACT - Ceiling Grid & Wires Balance of Walls and OverHead Complete 04/28/26 05/06/26 8.8 0.0
100%
0.0
RPL10.SSBC.BB.3235 RPL10.Int.Build Back.SSB-Corr - LO #4 - Frame Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Complete 04/28/26 05/01/26 3.8 0.0
100%
0.0
RPL10.EY.NS3.01160 RPL10.EY.NS3 - Install Tent Overhead Doors Tent and Temp Conditions Complete 04/29/26 05/05/26 6.2 0.0
100%
0.0
RPL10.INT.NS2.01150 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install FW Remaining Tie-ins post Mech Side Aisle install Active 04/29/26 05/27/26 25.0 2.5
0%
8.8
RPL10.INT.NS2.02180 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install TW Remaining Tie-ins post Mech Side Aisle install Active 04/29/26 05/27/26 25.0 2.5
0%
8.8
RPL10.INT.NS4.02020 RPL10.Interior.NS4 - OFE - Ancillary Skids - Set / Place / Anchor (04.29.26) OFE Complete 04/29/26 05/04/26 5.0 0.0
100%
0.0
RPL10.EY.EF2.01810 RPL10.EY.EF2 - FSP3 - Install Columns Cap Erect Shoring & Decking & F/R/P (DPR Side) Fiber Support Platform - RPL-3 Complete 04/30/26 05/08/26 6.2 0.0
100%
0.0
RPL10.INT.NS1.01470 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Active 04/30/26 05/29/26 5.0 5.0
100%
37.5
RPL10.INT.SSBC.02860 RPL10.Interior.SSB-Corridor - BoW - Install Doors (Verify with Trades before Installation) Balance of Walls & OverHead Complete 04/30/26 05/22/26 3.8 0.0
100%
0.0
RPL10.INT.CTRC.01300 RPL10.Interior.Center-Corridor - BoW - Frame Hard Lid Balance of Walls & OverHead Complete 05/01/26 05/07/26 6.2 0.0
100%
0.0
RPL10.INT.ENDC.01090 RPL10.Interior.End-Corridor - BoW - Install Security Lowside OH and In-Wall Balance of Walls & Overhead Complete 05/01/26 05/08/26 0.0 0.0
100%
0.0
RPL10.INT.NS1.02540 RPL10.Interior.NS1 - OFE - Control Fault Domain 4 SQ3.1 (HAC) OFE NS1 Control Fault Domain 4 Complete 05/01/26 05/15/26 18.8 0.0
100%
0.0
RPL10.SSB.BB.1125 RPL10.Ext.Build Back.SSB - LO #5 - Hang Exterior Drywall Build Back Exterior Leave Out Wall #5 (East SSB) Complete 05/01/26 05/04/26 6.2 0.0
100%
0.0
RPL10.SSB.BB.1240 RPL10.Ext.Build Back.SSB - LO #5 - Install Security Lowside OH Build Back Exterior Leave Out Wall #5 (East SSB) Complete 05/01/26 05/06/26 5.0 0.0
100%
0.0
RPL10.SSB.BB.1300 RPL10.Ext.Build Back.SSB - LO #5 - Install Electrical Lowside OH Build Back Exterior Leave Out Wall #5 (East SSB) Complete 05/01/26 05/06/26 5.0 0.0
100%
0.0
RPL10.SSB.BB.1320 RPL10.Ext.Build Back.SSB - LO #5 - Install Controls / EPMS / BMS Lowside OH Build Back Exterior Leave Out Wall #5 (East SSB) Complete 05/01/26 05/06/26 5.0 0.0
100%
0.0
RPL10.SSBC.BB.3255 RPL10.Int.Build Back.SSB-Corr - LO #4 - MEPF - In Wall Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Complete 05/01/26 05/08/26 3.8 0.0
100%
0.0
RPL10.EY.NS1.01280 RPL10.EY.NS1 - Install EPMS Tie-ins Tie-ins Active 05/04/26 05/26/26 12.5 1.2
0%
26.2
RPL10.EY.NS2.01280 RPL10.EY.NS2 - Install EPMS Tie-ins Tie-ins Active 05/04/26 05/26/26 12.5 1.2
0%
36.2
RPL10.INT.CTRC.01270 RPL10.Interior.Center-Corridor - OFE - Install UPS in Corridor (2x UPS) NS1/NS2 Balance of Walls & OverHead Active 05/04/26 05/26/26 12.5 1.2
100%
121.2
RPL10.INT.CTRC.01590 RPL10.Interior.Center-Corridor - BoW - Install Electrical - NS3/NS4 UPS Gallery Balance of Walls & OverHead Active 05/04/26 05/26/26 6.2 1.2
100%
101.2
RPL10.INT.CTRC.01610 RPL10.Interior.Center-Corridor - BoW - Install Electrical - Lighning Inverter Rooms (N1/N2) Balance of Walls & OverHead Active 05/04/26 05/26/26 6.2 1.2
100%
101.2
RPL10.INT.CTRC.01790 RPL10.Interior.Center-Corridor - BoW - Install Fire Safing/ Seal all Penetrations (Lowside space) Balance of Walls & OverHead Complete 05/04/26 05/08/26 6.2 0.0
100%
0.0
RPL10.INT.CTRC.01850 RPL10.Interior.Center-Corridor - BoW - Install VAV's/Duct Branches Balance of Walls & OverHead Complete 05/04/26 05/07/26 5.0 0.0
100%
0.0
RPL10.INT.EF2.01090 RPL10.Interior.EF2 - Priority OH - Security OverHead Complete 05/04/26 05/05/26 2.5 0.0
100%
0.0
RPL10.INT.ENDC.01100 RPL10.Interior.End-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall Balance of Walls & Overhead Complete 05/04/26 05/07/26 5.0 0.0
100%