Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer
· Uploaded Jun 03, 2026 01:35 PM
· 9281 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
63
Completed
37
In Progress
63
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.INT.NS1.02070 |
RPL10.Interior.NS1 - OFE - Ancillary Skids - Set / Place / Anchor (04.01.26) | OFE | Complete | 04/21/26 | 04/24/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01490 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 3 SQ4.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS2 Control Fault Domain 3 | Active | 04/21/26 | 06/22/26 | 55.0 | 20.0 |
|
7.5 |
RPL10.INT.NS2.02625 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 3 SQ4.2 (LV Side Aisle) | OFE NS2 Control Fault Domain 3 | Complete | 04/21/26 | 04/23/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS4.01070 |
RPL10.Interior.NS4 - OFE - MES Skids - Set / Place / Anchor | OFE | Active | 04/21/26 | 05/28/26 | 25.0 | 3.8 |
|
130.0 |
RPL10.INT.SSBC.02260 |
RPL10.Interior.SSB-Corridor - BoW - Install Electrical Carrier MDF (10.N1.09) | Balance of Walls & OverHead | Complete | 04/21/26 | 05/04/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.1680 |
RPL10.MCUP.Loop 2 - Tie-in EPMS (LOE) | Tie-Ins EPMS | Active | 04/21/26 | 06/02/26 | 32.5 | 7.5 |
|
131.2 |
RPL10.MCUP.LP2.1700 |
RPL10.MCUP.Loop 2 - Tie-in EPMS #2 | Tie-Ins EPMS | Active | 04/21/26 | 06/01/26 | 8.8 | 5.0 |
|
132.5 |
RPL10.MCUP.LP2.1780 |
RPL10.MCUP.Loop 2 - Tie-in EPMS #4 | Tie-Ins EPMS | Active | 04/21/26 | 06/02/26 | 7.5 | 5.0 |
|
131.2 |
RPL10.SSB.BB.1180 |
RPL10.Ext.Build Back.SSB - LO #5 - Install IMP Wall Exterior Panel | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 04/21/26 | 04/21/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.EY.EF2.01160 |
RPL10.EY.EF2 - Install RPL-3 FSP Columns F/R/P | Fiber Support Platform - RPL-3 | Complete | 04/22/26 | 04/29/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.ENDC.01250 |
RPL10.EY.End - Install Temp Conditioning Units | OFE | Complete | 04/22/26 | 04/22/26 | 1.2 | 0.0 |
|
0.0 |
RPL10.EY.NS2.01240 |
RPL10.EY.NS2 - Install GS.IDF Hut (1x GS.IDF) NX06 (04.22.26) | OFE | Complete | 04/22/26 | 04/28/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS2.01270 |
RPL10.EY.NS2 - Install GS.IDF Hut (1x GS.IDF) NX07 (04.22.26) | OFE | Complete | 04/22/26 | 04/28/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS4.01180 |
RPL10.EY.NS4 - Install Tent Electrical Tie-ins | Tent and Temp Conditions | Complete | 04/22/26 | 04/24/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01630 |
RPL10.Interior.Center-Corridor - BoW - Install Refrigerant Piping Lowside OH on Supplemental Steel | Balance of Walls & OverHead | Complete | 04/22/26 | 05/13/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.07720 |
RPL10.Interior.Center-Corridor - Priority - Install Exterior Wall Drywall, Tape, Float, Paint (Remaining) | Priority Walls & OverHead | Complete | 04/22/26 | 05/04/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.01010 |
RPL10.Interior.End-Corridor - Priority - Install Duct (Highside OH space) | Priority Walls & OverHead | Complete | 04/22/26 | 05/05/26 | 12.5 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.1400 |
RPL10.Interior.End-Corridor - BoW - Install Door Frames | Balance of Walls & Overhead | Complete | 04/22/26 | 05/04/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01184 |
RPL10.Interior.NS1 - Electrical Panels/Ancillary Skid (ATS,SB House,MCB,MLO, Transformer) - Tie-ins | NS1 - LV Skids and TopHat | Active | 04/22/26 | 06/05/26 | 18.8 | 11.2 |
|
25.0 |
RPL10.INT.NS1.01280 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Set TWMS, UPS and Panel (2) | Remaining Tie-ins post Mech Side Aisle install | Complete | 04/22/26 | 05/20/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01330 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Complete | 04/22/26 | 04/29/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01460 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Complete | 04/22/26 | 05/01/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.02500 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 5 SQ2.1 (Mech Side Aisle) | OFE NS1 Control Fault Domain 5 | Complete | 04/22/26 | 05/01/26 | 16.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.02485 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 6 SQ1.2 - (Mech Side Aisle) | OFE NS2 Control Fault Domain 6 | Complete | 04/22/26 | 05/08/26 | 22.5 | 0.0 |
|
0.0 |
RPL10.INT.SSB.02520 |
RPL10.Interior.SSB - BoW - ACT - Set Wall Angle | Balance of Walls and OverHead | Complete | 04/22/26 | 05/01/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.1660 |
RPL10.MCUP.Loop 2 - Tie-in BMS (LOE) | Tie-Ins BMS | Active | 04/22/26 | 06/03/26 | 31.2 | 8.8 |
|
131.2 |
RPL10.MCUP.LP2.1720 |
RPL10.MCUP.Loop 2 - Tie-in BMS #2 | Tie-Ins BMS | Active | 04/22/26 | 06/02/26 | 11.2 | 5.0 |
|
132.5 |
RPL10.MCUP.LP2.1820 |
RPL10.MCUP.Loop 2 - Tie-in BMS #4 | Tie-Ins BMS | Active | 04/22/26 | 06/03/26 | 8.8 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.1880 |
RPL10.MCUP.Loop 2 - Tie-in BMS #6 | Tie-Ins BMS | Active | 04/22/26 | 06/03/26 | 8.8 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.1980 |
RPL10.MCUP.Loop 2 - Tie-in BMS #8 | Tie-Ins BMS | Active | 04/22/26 | 06/03/26 | 11.2 | 5.0 |
|
131.2 |
RPL10.CTRC.BB.2000 |
RPL10.Int.Build Back.Center-Corr - LO #12 - P3 Frame Remaining Wall & MEP In-Wall/Backing (Around 30"" Mech Pipe) | Build Back Interior Leave Out Wall #12 #13 @ 30"" Mech Piping (Center Corr) | Complete | 04/23/26 | 05/04/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.EY.EF1.01660 |
RPL10.EY.EF1 - FSP2 - Install Columns Cap Erect Shoring & Decking & F/R/P | Fiber Support Platform - RPL-2 | Complete | 04/23/26 | 05/04/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.INT.NS4.02440 |
RPL10.Interior.NS43 - Temp Conditions - Drop Curtains (from Corridor to EJ) | Temp Conditions | Complete | 04/23/26 | 04/24/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.NS4.02460 |
RPL10.Interior.NS43 - Temp Conditions - Install Early Temp Conditions | Temp Conditions | Complete | 04/23/26 | 04/24/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.SSB.01310 |
RPL10.Interior.SSB - BoW - MEPF Hard Lid Rough-In | Balance of Walls and OverHead | Complete | 04/23/26 | 05/01/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.1840 |
RPL10.MCUP.Loop 2 - Tie-in EPMS #6 | Tie-Ins EPMS | Active | 04/23/26 | 06/02/26 | 7.5 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.1900 |
RPL10.MCUP.Loop 2 - Tie-in Electrical #6 | Tie-Ins Electrical | Active | 04/23/26 | 06/01/26 | 8.8 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.1940 |
RPL10.MCUP.Loop 2 - Tie-in EPMS #8 | Tie-Ins EPMS | Active | 04/23/26 | 06/02/26 | 8.8 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.2620 |
RPL10.MCUP.Loop 2 - Condenser WaterTie-in Mechanical #2 | Tie-in Mechanical #2 | Active | 04/23/26 | 05/29/26 | 10.0 | 5.0 |
|
136.2 |
RPL10.MCUP.LP2.2660 |
RPL10.MCUP.Loop 2 - Condenser Water Tie-in Mechanical #4 | Tie-in Mechanical #4 | Active | 04/23/26 | 05/29/26 | 7.5 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.2700 |
RPL10.MCUP.Loop 2 - Condenser Water Tie-in Mechanical #6 | Tie-in Mechanical #6 | Active | 04/23/26 | 05/29/26 | 7.5 | 5.0 |
|
131.2 |
RPL10.MCUP.LP2.2740 |
RPL10.MCUP.Loop 2 - Condenser Water Tie-in Mechanical #8 | Tie-in Mechanical #8 | Active | 04/23/26 | 05/29/26 | 10.0 | 5.0 |
|
131.2 |
RPL10.EY.EF2.01200 |
RPL10.EY.EF2 - Install RPL-5 FSP Columns F/R/P | Fiber Support Platform - RPL-5 | Complete | 04/24/26 | 05/01/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01650 |
RPL10.Interior.Center-Corridor - BoW - Tape, Float and Paint BoW | Balance of Walls & OverHead | Complete | 04/24/26 | 05/04/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.EF1.01410 |
RPL10.Interior.EF1 - EF1 East - Install Lower Trays | East EF-1 | Complete | 04/24/26 | 05/18/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01204 |
RPL10.Interior.NS1 - MES Skids - BMS Tie-Ins | NS1 - MES Skids | Active | 04/24/26 | 06/10/26 | 30.0 | 3.8 |
|
133.8 |
RPL10.INT.NS2.01630 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 2 SQ5.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS2 Control Fault Domain 2 | Active | 04/24/26 | 07/14/26 | 70.0 | 20.0 |
|
5.0 |
RPL10.INT.NS2.02685 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 2 SQ5.2 (LV Side Aisle) | OFE NS2 Control Fault Domain 2 | Complete | 04/24/26 | 04/27/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.MCUP.LP2.2000 |
RPL10.MCUP.Loop 2 - Tie-in Electrical #8 | Tie-Ins Electrical | Active | 04/24/26 | 06/01/26 | 11.2 | 5.0 |
|
131.2 |
RPL10.EY.EF1.01640 |
RPL10.EY.EF1 - FSP1 - Install Columns Cap Cure | Fiber Support Platform - RPL-1 | Complete | 04/26/26 | 05/09/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.EY.EF1.01310 |
RPL10.EY.EF1 - FSP1 - Install Roofing Z Purlin (Logistic #7 Install) | Fiber Support Platform - RPL-1 | Complete | 04/27/26 | 05/08/26 | 12.5 | 0.0 |
|
0.0 |
RPL10.EY.EF2.01930 |
RPL10.EY.EF2 - FSP3 - Install FSP Anchor Bolt Procurement Delay | Fiber Support Platform - RPL-3 | Complete | 04/27/26 | 05/07/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS3.01140 |
RPL10.EY.NS3 - Install Tent Electrical Panels | Tent and Temp Conditions | Complete | 04/27/26 | 04/28/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS3.01150 |
RPL10.EY.NS3 - Install Tent Heating and Cooling Equipment | Tent and Temp Conditions | Complete | 04/27/26 | 04/28/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.NS3.01180 |
RPL10.EY.NS3 - Install Tent Electrical Tie-ins | Tent and Temp Conditions | Complete | 04/27/26 | 04/28/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.EY.NS3.01190 |
RPL10.EY.NS3 - Install Tent Mechanical Tie-ins | Tent and Temp Conditions | Complete | 04/27/26 | 04/28/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01300 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Active | 04/27/26 | 05/26/26 | 25.0 | 1.2 |
|
11.2 |
RPL10.INT.NS1.01355 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Complete | 04/27/26 | 05/11/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01370 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Active | 04/27/26 | 05/26/26 | 25.0 | 1.2 |
|
21.2 |
RPL10.INT.NS1.02220 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Active | 04/27/26 | 05/26/26 | 25.0 | 1.2 |
|
21.2 |
RPL10.INT.NS1.03320 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Install HAC Busway and Cable Tray Tie-In | Remaining Tie-ins post Mech Side Aisle install | Complete | 04/27/26 | 05/22/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01400 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/27/26 | 04/27/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01430 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 4 SQ3.2 (including IDF) - WBS Summary | Tie-Ins NS2 Control Fault Domain 4 | Active | 04/27/26 | 07/14/26 | 68.8 | 43.8 |
|
42.5 |
RPL10.INT.NS2.01540 |
RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install Duct (LV Side) | LV Side Tie-ins | Complete | 04/27/26 | 04/27/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01570 |
RPL10.Interior.NS2 - Tie-ins - Control Fault Domain 3 SQ4.2 - WBS Summary | Tie-Ins NS2 Control Fault Domain 3 | Active | 04/27/26 | 07/24/26 | 78.8 | 53.8 |
|
60.0 |
RPL10.SSB.BB.1120 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Exterior Backing, In-Wall | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 04/27/26 | 05/01/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.CTRC.BB.2020 |
RPL10.Int.Build Back.Center-Corr - LO #12 - P3 Hang Drywall (Around 30"" Mech Pipe) | Build Back Interior Leave Out Wall #12 #13 @ 30"" Mech Piping (Center Corr) | Complete | 04/28/26 | 05/07/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.EY.EF2.01830 |
RPL10.EY.EF2 - FSP5 - Install Columns Cap Erect Shoring & Decking & F/R/P (DPR Side) | Fiber Support Platform - RPL-5 | Complete | 04/28/26 | 05/04/26 | 7.5 | 0.0 |
|
0.0 |
RPL10.EY.ENDC.01145 |
RPL10.EY.End - Install Mechanical Tie-ins | Tie-ins | Complete | 04/28/26 | 05/11/26 | 12.5 | 0.0 |
|
0.0 |
RPL10.EY.NS2.01250 |
RPL10.EY.NS2 - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Complete | 04/28/26 | 05/13/26 | 12.5 | 0.0 |
|
0.0 |
RPL10.EY.NS2.01260 |
RPL10.EY.NS2 - Tie-ins - WBS Summary | Tie-ins | Active | 04/28/26 | 06/09/26 | 38.8 | 13.8 |
|
61.2 |
RPL10.INT.NS2.01094 |
RPL10.Interior.NS2 - Electrical Panels/Ancillary Skid (ATS,SB House,MCB,MLO, Transformer) - Tie-Ins | NS2 - LV Skids and TopHat | Active | 04/28/26 | 06/15/26 | 18.8 | 18.8 |
|
27.5 |
RPL10.INT.NS2.01790 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 1 SQ6.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS2 Control Fault Domain 1 | Active | 04/28/26 | 08/04/26 | 86.2 | 20.0 |
|
2.5 |
RPL10.INT.NS2.02745 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 1 SQ6.2 (LV Side Aisle) | OFE NS2 Control Fault Domain 1 | Complete | 04/28/26 | 04/29/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.SSB.02540 |
RPL10.Interior.SSB - BoW - ACT - Ceiling Grid & Wires | Balance of Walls and OverHead | Complete | 04/28/26 | 05/06/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.SSBC.BB.3235 |
RPL10.Int.Build Back.SSB-Corr - LO #4 - Frame | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Complete | 04/28/26 | 05/01/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.EY.NS3.01160 |
RPL10.EY.NS3 - Install Tent Overhead Doors | Tent and Temp Conditions | Complete | 04/29/26 | 05/05/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS2.01150 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Active | 04/29/26 | 05/27/26 | 25.0 | 2.5 |
|
8.8 |
RPL10.INT.NS2.02180 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Active | 04/29/26 | 05/27/26 | 25.0 | 2.5 |
|
8.8 |
RPL10.INT.NS4.02020 |
RPL10.Interior.NS4 - OFE - Ancillary Skids - Set / Place / Anchor (04.29.26) | OFE | Complete | 04/29/26 | 05/04/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.EY.EF2.01810 |
RPL10.EY.EF2 - FSP3 - Install Columns Cap Erect Shoring & Decking & F/R/P (DPR Side) | Fiber Support Platform - RPL-3 | Complete | 04/30/26 | 05/08/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.NS1.01470 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Active | 04/30/26 | 05/29/26 | 5.0 | 5.0 |
|
37.5 |
RPL10.INT.SSBC.02860 |
RPL10.Interior.SSB-Corridor - BoW - Install Doors (Verify with Trades before Installation) | Balance of Walls & OverHead | Complete | 04/30/26 | 05/22/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01300 |
RPL10.Interior.Center-Corridor - BoW - Frame Hard Lid | Balance of Walls & OverHead | Complete | 05/01/26 | 05/07/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.01090 |
RPL10.Interior.End-Corridor - BoW - Install Security Lowside OH and In-Wall | Balance of Walls & Overhead | Complete | 05/01/26 | 05/08/26 | 0.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.02540 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 4 SQ3.1 (HAC) | OFE NS1 Control Fault Domain 4 | Complete | 05/01/26 | 05/15/26 | 18.8 | 0.0 |
|
0.0 |
RPL10.SSB.BB.1125 |
RPL10.Ext.Build Back.SSB - LO #5 - Hang Exterior Drywall | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 05/01/26 | 05/04/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.SSB.BB.1240 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Security Lowside OH | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 05/01/26 | 05/06/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.SSB.BB.1300 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Electrical Lowside OH | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 05/01/26 | 05/06/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.SSB.BB.1320 |
RPL10.Ext.Build Back.SSB - LO #5 - Install Controls / EPMS / BMS Lowside OH | Build Back Exterior Leave Out Wall #5 (East SSB) | Complete | 05/01/26 | 05/06/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.SSBC.BB.3255 |
RPL10.Int.Build Back.SSB-Corr - LO #4 - MEPF - In Wall | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Complete | 05/01/26 | 05/08/26 | 3.8 | 0.0 |
|
0.0 |
RPL10.EY.NS1.01280 |
RPL10.EY.NS1 - Install EPMS Tie-ins | Tie-ins | Active | 05/04/26 | 05/26/26 | 12.5 | 1.2 |
|
26.2 |
RPL10.EY.NS2.01280 |
RPL10.EY.NS2 - Install EPMS Tie-ins | Tie-ins | Active | 05/04/26 | 05/26/26 | 12.5 | 1.2 |
|
36.2 |
RPL10.INT.CTRC.01270 |
RPL10.Interior.Center-Corridor - OFE - Install UPS in Corridor (2x UPS) NS1/NS2 | Balance of Walls & OverHead | Active | 05/04/26 | 05/26/26 | 12.5 | 1.2 |
|
121.2 |
RPL10.INT.CTRC.01590 |
RPL10.Interior.Center-Corridor - BoW - Install Electrical - NS3/NS4 UPS Gallery | Balance of Walls & OverHead | Active | 05/04/26 | 05/26/26 | 6.2 | 1.2 |
|
101.2 |
RPL10.INT.CTRC.01610 |
RPL10.Interior.Center-Corridor - BoW - Install Electrical - Lighning Inverter Rooms (N1/N2) | Balance of Walls & OverHead | Active | 05/04/26 | 05/26/26 | 6.2 | 1.2 |
|
101.2 |
RPL10.INT.CTRC.01790 |
RPL10.Interior.Center-Corridor - BoW - Install Fire Safing/ Seal all Penetrations (Lowside space) | Balance of Walls & OverHead | Complete | 05/04/26 | 05/08/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01850 |
RPL10.Interior.Center-Corridor - BoW - Install VAV's/Duct Branches | Balance of Walls & OverHead | Complete | 05/04/26 | 05/07/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.EF2.01090 |
RPL10.Interior.EF2 - Priority OH - Security | OverHead | Complete | 05/04/26 | 05/05/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.ENDC.01100 |
RPL10.Interior.End-Corridor - BoW - Install Controls / EPMS / BMS OH and In-wall | Balance of Walls & Overhead | Complete | 05/04/26 | 05/07/26 | 5.0 | 0.0 |
|
0.0 |