Schedule Viewer

Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer · Uploaded Jun 03, 2026 01:35 PM · 9281 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
17
Completed
41
In Progress
18
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.MCUP.LP1.2060 RPL10.MCUP.Loop 1 - Tie-in - Electrical L2 Checklist Completion Tie-Ins Electrical Active 05/12/26 05/26/26 11.2 1.2
0%
25.0
RPL10.WP2.CMDF1.1000 RPL10.Conn CMDF1 Install Infrastructure Racks, Tier1 Infrastructure Complete 05/12/26 05/15/26 6.2 0.0
100%
0.0
RPL.GF.D.G4620.XG Rack & Cabinets Complete - DHB - RPL6 Give Milestones (XREFs) Not Started 05/13/26 05/13/26 0.0 0.0
0%
227.0
RPL10.EY.EF1.01380 RPL10.EY.EF1 - FSP1 - Install Interior Hilti Support Fiber Support Platform - RPL-1 Active 05/13/26 06/17/26 15.0 15.0
0%
237.5
RPL10.INT.CTRC.07780 RPL10.Interior.Center-Corridor - BoW - Install Cable Tray (Remaining) Balance of Walls & OverHead Complete 05/13/26 05/19/26 6.2 0.0
100%
0.0
RPL10.INT.SSB.01400 RPL10.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls and OverHead Active 05/13/26 06/05/26 8.8 11.2
0%
196.2
RPL10.INT.SSB.01490 RPL10.Interior.SSB - BoW - Install Lighting Balance of Walls and OverHead Complete 05/13/26 05/22/26 8.8 0.0
100%
0.0
RPL10.INT.SSB.04380 RPL10.Interior.SSB - BoW - Install Lights in ACT Ceiling Balance of Walls and OverHead Complete 05/13/26 05/15/26 3.0 0.0
100%
0.0
RPL10.INT.SSBC.02700 RPL10.Interior.SSB-Corridor - BoW - Install Split Systems/Humidifiers Balance of Walls & OverHead Active 05/13/26 05/26/26 6.2 1.2
0%
120.0
RPL10.INT.SSBC.03040 RPL10.Interior.SSB-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls & OverHead Active 05/13/26 06/05/26 12.5 6.2
0%
122.5
RPL10.INT.SSBC.04120 RPL10.Interior.SSB-Corridor - BoW - Install Fire Alarm Panel (Fire Riser Room NS1) Balance of Walls & OverHead Complete 05/13/26 05/15/26 2.5 0.0
100%
0.0
RPL10.INT.CTRC.01870 RPL10.Interior.Center-Corridor - BoW - Install Split Systems/Humidifiers Balance of Walls & OverHead Active 05/14/26 05/26/26 5.0 1.2
0%
127.5
RPL10.EY.EF1.01340 RPL10.EY.EF1 - FSP1 - Install Final Roof (Standing Seam Panels) Phase 1 Fiber Support Platform - RPL-1 Complete 05/15/26 05/22/26 6.2 0.0
100%
0.0
RPL10.EY.EF2.01850 RPL10.EY.EF2 - FSP3 - Columns Cap Cure Fiber Support Platform - RPL-3 Complete 05/15/26 05/20/26 8.8 0.0
100%
0.0
RPL10.EY.EF2.01870 RPL10.EY.EF2 - FSP5 - Columns Cap Cure Fiber Support Platform - RPL-5 Complete 05/15/26 05/21/26 8.8 0.0
100%
0.0
RPL10.INT.NS1.02620 RPL10.Interior.NS1 - OFE - Control Fault Domain 3 SQ4.1 (Mech Side Aisle) OFE NS1 Control Fault Domain 3 Complete 05/15/26 05/22/26 16.2 0.0
100%
0.0
RPL10.MCUP.LP1.2080 RPL10.MCUP.Loop 1 - Tie-in - Mechanical L2 Checklist Completion Tie-Ins Mechanical Active 05/15/26 06/01/26 11.2 1.2
0%
20.0
RPL10.EY.EF1.01280 RPL10.EY.EF1 - FSP2 - Install Steel Span Structure Modules Fiber Support Platform - RPL-2 Active 05/18/26 06/04/26 16.2 10.0
0%
221.2
RPL10.EY.NS1.01300 RPL10.EY.NS1 - MV Loop 1 - L2 Checklist Completion Tie-ins Active 05/18/26 06/02/26 12.5 6.2
0%
26.2
RPL10.EY.NS1.01310 RPL10.EY.NS1 - MV Loop 2 - L2 Checklist Completion Tie-ins Active 05/18/26 06/02/26 12.5 6.2
0%
26.2
RPL10.EY.SSB.01240 RPL10.EY.SSB - Install EPMS Tie-ins Tie-ins Active 05/18/26 06/08/26 18.8 12.5
0%
53.8
RPL10.INT.CTRC.01220 RPL10.Interior.Center-Corridor - BoW - Install Controls / BMS OH and In-wall Balance of Walls & OverHead Active 05/18/26 05/26/26 5.0 1.2
0%
121.2
RPL10.INT.CTRC.01280 RPL10.Interior.Center-Corridor - BoW - Install Duct and Drops Balance of Walls & OverHead Complete 05/18/26 05/22/26 6.2 0.0
100%
0.0
RPL10.INT.CTRC.01360 RPL10.Interior.Center-Corridor - BoW - Install Flooring Tiles / Resinous Flooring in specific rooms Balance of Walls & OverHead Active 05/18/26 05/26/26 3.8 1.2
100%
111.2
RPL10.INT.CTRC.01410 RPL10.Interior.Center-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls & OverHead Complete 05/18/26 05/21/26 5.0 0.0
100%
0.0
RPL10.INT.CTRC.07800 RPL10.Interior.Center-Corridor - BoW - Install EPMS OH and In-wall *EPMS Separate Activty Balance of Walls & OverHead Active 05/18/26 05/26/26 5.0 1.2
0%
121.2
RPL10.INT.NS1.01430 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Active 05/18/26 06/29/26 25.0 25.0
0%
11.2
RPL10.INT.NS1.01740 RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Complete 05/18/26 05/22/26 5.0 0.0
100%
0.0
RPL10.INT.NS1.02240 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install TW Remaining Tie-ins post Mech Side Aisle install Active 05/18/26 06/15/26 25.0 18.8
0%
41.2
RPL10.INT.NS1.02760 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Complete 05/18/26 05/19/26 25.0 0.0
100%
0.0
RPL10.INT.NS1.03280 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Active 05/18/26 06/15/26 25.0 18.8
0%
53.8
RPL10.INT.NS1.03300 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Active 05/18/26 06/15/26 25.0 18.8
0%
43.8
RPL10.INT.NS2.01270 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Active 05/18/26 06/15/26 25.0 18.8
0%
31.2
RPL10.INT.NS2.01510 RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Active 05/18/26 06/02/26 5.0 7.5
0%
57.5
RPL10.INT.NS2.02200 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install TW Remaining Tie-ins post Mech Side Aisle install Active 05/18/26 06/22/26 25.0 25.0
0%
12.5
RPL10.INT.NS2.02805 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Complete 05/18/26 05/19/26 25.0 0.0
100%
0.0
RPL10.INT.NS2.03345 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Active 05/18/26 06/15/26 25.0 18.8
0%
27.5
RPL10.INT.SSB.01760 RPL10.Interior.SSB - Loading Dock and Storage - Mechanical Tie-In Loading Dock and Storage Complete 05/18/26 05/22/26 6.2 0.0
100%
0.0
RPL10.INT.SSBC.01590 RPL10.Interior.SSB-Corridor - BoW - Install Mechanical Tie-Ins (needs to micro plan) Balance of Walls & OverHead Active 05/18/26 05/26/26 6.2 1.2
100%
120.0
RPL10.SSBC.BB.1480 RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - MEPF - OH, Lowside, Lights Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Active 05/18/26 06/01/26 12.5 6.2
0%
171.2
RPL10.SSBC.BB.3275 RPL10.Int.Build Back.SSB-Corr - LO #4 - Hang Drywall Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Complete 05/18/26 05/20/26 3.8 0.0
100%
0.0
JCL.C.1380 RPL10 - Cost Risk LOE-19 Connectivity Package 3A - Front End Infra & Cabling (OSP,OH) Cost LOEs Active 05/19/26 08/31/26 87.5 86.2
0%
117.5
RPL10.INT.ENDC.01480 RPL10.Interior.End-Corridor - BoW - Tape Finish Paint BoW Balance of Walls & Overhead Active 05/19/26 05/26/26 6.2 1.2
0%
185.0
RPL10.INT.ENDC.1440 RPL10.Interior.End-Corridor - BoW - Mechanical Tie-In Balance of Walls & Overhead Active 05/19/26 05/26/26 6.2 1.2
0%
233.8
RPL10.INT.NS1.02780 RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Complete 05/19/26 05/22/26 25.0 0.0
100%
0.0
RPL10.INT.NS2.02605 RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (Mech Side Aisle) OFE NS2 Control Fault Domain 4 Active 05/19/26 05/29/26 16.2 5.0
0%
11.2
RPL10.INT.NS2.02825 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Active 05/19/26 05/26/26 25.0 1.2
0%
12.5
RPL10.WP3A.EF.01020 RPL10.Conn EF1F Infrasturcture 1 (Racks & Vertical Cable Manager, Ladder Racks) Infrastructure & Cabling Active 05/19/26 06/16/26 25.0 20.0
0%
113.8
RPL10.WP3A.EF.02000 RPL10.Conn EF1F OSP Pathway - WBS Summary Infrastructure & Cabling Active 05/19/26 06/30/26 37.5 32.5
0%
201.2
RPL10.INT.NS1.01870 RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Active 05/20/26 06/02/26 5.0 5.0
0%
83.8
RPL10.INT.SSB.01360 RPL10.Interior.SSB - BoW - Electrical Trim Out Balance of Walls and OverHead Active 05/20/26 05/27/26 6.2 2.5
0%
156.2
RPL10.INT.SSB.01820 RPL10.Interior.SSB - BoW - Mechanical Tie-In Balance of Walls and OverHead Active 05/20/26 05/27/26 6.2 2.5
0%
156.2
RPL10.EY.EF2.01390 RPL10.EY.EF2 - FSP3 - Install Roofing Z Purlin (Logistic #7 Install) Fiber Support Platform - RPL-3 Active 05/21/26 06/02/26 10.0 7.5
0%
248.8
RPL10.INT.EF1.01150 RPL10.Interior.EF1 - CFCI - Set North CRAH Units OFE Active 05/21/26 05/28/26 6.2 3.8
0%
96.2
RPL10.INT.NS1.01260 RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Active 05/21/26 06/18/26 25.0 22.5
0%
11.2
RPL10.INT.NS2.01114 RPL10.Interior.NS2 - MES Skids - BMS Tie-Ins ( 2 per day) NS2 - MES Skids Active 05/21/26 06/24/26 30.0 27.5
0%
148.8
RPL10.MCUP.LP2.2080 RPL10.MCUP.Loop 2 - Tie-in - Mechanical L2 Checklist Completion Tie-Ins Mechanical Active 05/21/26 06/10/26 12.5 12.5
0%
132.5
RPL10.SSBC.BB.3295 RPL10.Int.Build Back.SSB-Corr - LO #4 - Tape, Float and Paint Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Active 05/21/26 05/26/26 6.2 1.2
100%
170.0
RPL10.EY.SSB.01260 RPL10.EY.SSB - L2 Checklist Completion Tie-ins Active 05/22/26 06/08/26 12.5 12.5
0%
53.8
DCC.B10.3010 [NWB] Production Gear Delivered [Network Suite] DR/EBB Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3015 [NWB] Production Gear Delivered [Network Suite] MA Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
408.8
DCC.B10.3020 [NWB] Production Gear Delivered [Network Suite] XSW Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
408.8
DCC.B10.3025 [NWB] Production Gear Delivered [NWS1] Front End (SSW & FSW) Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3027 [NWB] Production Gear Delivered [NWS1] Back End Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3035 [NWB] Production Gear Delivered [NWS2] Front End (SSW & FSW) Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3037 [NWB] Production Gear Delivered [NWS2] Back End Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3045 [NWB] Production Gear Delivered [NWS3] Front End (SSW & FSW) Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3047 [NWB] Production Gear Delivered [NWS3] Back End Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3055 [NWB] Production Gear Delivered [NWS4] Front End (SSW & FSW) Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3057 [NWB] Production Gear Delivered [NWS4] Back End Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3165 [NWB] PortMaps Delivered : GS Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3170 [NWB] PortMaps Delivered : Elevations & Cabling Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3175 [NWB] PortMaps Delivered :Backbone Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3180 [NWB] PortMaps Delivered :Front End Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3185 [NWB] PortMaps Delivered :Back End Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3300 [NWB] Cabling Start : OSP Pathways - Primary GS Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3410 [NWB] IBB1.1 - Circuit Delivered Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3420 [NWB] IBB1.2 - Circuit Delivered Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3430 [NWB] DCN 1 - Circuit Delivered Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3440 [NWB] CORP 1 - Circuit Delivered Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3450 [NWB] CORP OOB1 - Circuit Delivered Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3460 [NWB] Production Dark Fiber Path 1 - Circuit Delivered Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3527 [NWB] Cabling Start : Front End Production Cabling [NWS 1] Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3529 [NWB] Cabling Start : Back End Production Cabling [NWS 1] Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
DCC.B10.3707 [NWB] Cabling Start : General Services (GS) Connectivity Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
GCD.RPL10.3527 [RPL10] TC Ready: Production Cabling Pathways Complete [NS1 Rows 1-8] TC Ready: Production Cabling - NS1 Not Started 05/26/26 05/26/26 0.0 0.0
0%
41.2
ICM.B10.1805 [NWB] Delivery of Substation MSG Alpha (First Delivery) NOT DPR SCOPE Construction Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
JCL.C.1260 RPL10 - Cost Risk LOE-14 Cabling Cost LOEs Not Started 05/26/26 05/26/26 0.0 0.0
0%
208.8
JCL.C.1420 RPL10 - Cost Risk LOE-19 Connectivity Package 4A - Front End Network Cost LOEs Not Started 05/26/26 03/23/27 258.8 258.8
0%
0.0
RPL.10.D.X1440.XR Ready for Fiber Support Platform Construction - AI 2 (TCCO est Release 01-May-26) Connectivity (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
243.8
RPL.10.D.X3210.XR 500kva Temp Power Skids Energized (First 10 MW or Gen) Power (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
26.2
RPL.10.D.X33X0.XR Pull and Term mCUP Skids - RPL10 North Power (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
26.2
RPL.10.D.X33X1.XR Pull and Term MV Skids - RPL10 NS1 Loop 1 & 2 Power (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
33.8
RPL.10.D.X33X7.XR Cable Pull to Concrete Pad - RPL10 NS4 Loop 1 & 2 Power (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
33.8
RPL.10.D.X3900.XG Ready for MV Cable Pull mCUP South Loop (Loop#2) Give Milestones (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
RPL.10.D.X4420.XR Natural Gas Available for Fill/Flush Cx - Utility connections (L3/L4) Water / Gas Available (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
41.2
RPL.10.D.X4510.XR Storm Available for Roof Drain Tie-ins Pad Ready (XREFs) Not Started 05/26/26 05/26/26 0.0 0.0
0%
157.5
RPL.CM.D.C5620.XR Naboo Road Logistics - Onsite Receive XREF Milestones Not Started 05/26/26 05/26/26 0.0 0.0
0%
857.5
RPL.CM.D.N5620.XR LA 183 /Wade - Traffic Signal Logistics - Off-Site Receive XREF Milsetones Not Started 05/26/26 05/26/26 0.0 0.0
0%
115.0
RPL.CM.D.N5630.XR LA 183 /Fortenberry - Traffic Signal Logistics - Off-Site Receive XREF Milsetones Not Started 05/26/26 05/26/26 0.0 0.0
0%
471.2