Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer
· Uploaded Jun 03, 2026 01:35 PM
· 9281 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
17
Completed
41
In Progress
18
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL10.MCUP.LP1.2060 |
RPL10.MCUP.Loop 1 - Tie-in - Electrical L2 Checklist Completion | Tie-Ins Electrical | Active | 05/12/26 | 05/26/26 | 11.2 | 1.2 |
|
25.0 |
RPL10.WP2.CMDF1.1000 |
RPL10.Conn CMDF1 Install Infrastructure Racks, Tier1 | Infrastructure | Complete | 05/12/26 | 05/15/26 | 6.2 | 0.0 |
|
0.0 |
RPL.GF.D.G4620.XG |
Rack & Cabinets Complete - DHB - RPL6 | Give Milestones (XREFs) | Not Started | 05/13/26 | 05/13/26 | 0.0 | 0.0 |
|
227.0 |
RPL10.EY.EF1.01380 |
RPL10.EY.EF1 - FSP1 - Install Interior Hilti Support | Fiber Support Platform - RPL-1 | Active | 05/13/26 | 06/17/26 | 15.0 | 15.0 |
|
237.5 |
RPL10.INT.CTRC.07780 |
RPL10.Interior.Center-Corridor - BoW - Install Cable Tray (Remaining) | Balance of Walls & OverHead | Complete | 05/13/26 | 05/19/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.SSB.01400 |
RPL10.Interior.SSB - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls and OverHead | Active | 05/13/26 | 06/05/26 | 8.8 | 11.2 |
|
196.2 |
RPL10.INT.SSB.01490 |
RPL10.Interior.SSB - BoW - Install Lighting | Balance of Walls and OverHead | Complete | 05/13/26 | 05/22/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.INT.SSB.04380 |
RPL10.Interior.SSB - BoW - Install Lights in ACT Ceiling | Balance of Walls and OverHead | Complete | 05/13/26 | 05/15/26 | 3.0 | 0.0 |
|
0.0 |
RPL10.INT.SSBC.02700 |
RPL10.Interior.SSB-Corridor - BoW - Install Split Systems/Humidifiers | Balance of Walls & OverHead | Active | 05/13/26 | 05/26/26 | 6.2 | 1.2 |
|
120.0 |
RPL10.INT.SSBC.03040 |
RPL10.Interior.SSB-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls & OverHead | Active | 05/13/26 | 06/05/26 | 12.5 | 6.2 |
|
122.5 |
RPL10.INT.SSBC.04120 |
RPL10.Interior.SSB-Corridor - BoW - Install Fire Alarm Panel (Fire Riser Room NS1) | Balance of Walls & OverHead | Complete | 05/13/26 | 05/15/26 | 2.5 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01870 |
RPL10.Interior.Center-Corridor - BoW - Install Split Systems/Humidifiers | Balance of Walls & OverHead | Active | 05/14/26 | 05/26/26 | 5.0 | 1.2 |
|
127.5 |
RPL10.EY.EF1.01340 |
RPL10.EY.EF1 - FSP1 - Install Final Roof (Standing Seam Panels) Phase 1 | Fiber Support Platform - RPL-1 | Complete | 05/15/26 | 05/22/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.EY.EF2.01850 |
RPL10.EY.EF2 - FSP3 - Columns Cap Cure | Fiber Support Platform - RPL-3 | Complete | 05/15/26 | 05/20/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.EY.EF2.01870 |
RPL10.EY.EF2 - FSP5 - Columns Cap Cure | Fiber Support Platform - RPL-5 | Complete | 05/15/26 | 05/21/26 | 8.8 | 0.0 |
|
0.0 |
RPL10.INT.NS1.02620 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 3 SQ4.1 (Mech Side Aisle) | OFE NS1 Control Fault Domain 3 | Complete | 05/15/26 | 05/22/26 | 16.2 | 0.0 |
|
0.0 |
RPL10.MCUP.LP1.2080 |
RPL10.MCUP.Loop 1 - Tie-in - Mechanical L2 Checklist Completion | Tie-Ins Mechanical | Active | 05/15/26 | 06/01/26 | 11.2 | 1.2 |
|
20.0 |
RPL10.EY.EF1.01280 |
RPL10.EY.EF1 - FSP2 - Install Steel Span Structure Modules | Fiber Support Platform - RPL-2 | Active | 05/18/26 | 06/04/26 | 16.2 | 10.0 |
|
221.2 |
RPL10.EY.NS1.01300 |
RPL10.EY.NS1 - MV Loop 1 - L2 Checklist Completion | Tie-ins | Active | 05/18/26 | 06/02/26 | 12.5 | 6.2 |
|
26.2 |
RPL10.EY.NS1.01310 |
RPL10.EY.NS1 - MV Loop 2 - L2 Checklist Completion | Tie-ins | Active | 05/18/26 | 06/02/26 | 12.5 | 6.2 |
|
26.2 |
RPL10.EY.SSB.01240 |
RPL10.EY.SSB - Install EPMS Tie-ins | Tie-ins | Active | 05/18/26 | 06/08/26 | 18.8 | 12.5 |
|
53.8 |
RPL10.INT.CTRC.01220 |
RPL10.Interior.Center-Corridor - BoW - Install Controls / BMS OH and In-wall | Balance of Walls & OverHead | Active | 05/18/26 | 05/26/26 | 5.0 | 1.2 |
|
121.2 |
RPL10.INT.CTRC.01280 |
RPL10.Interior.Center-Corridor - BoW - Install Duct and Drops | Balance of Walls & OverHead | Complete | 05/18/26 | 05/22/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.01360 |
RPL10.Interior.Center-Corridor - BoW - Install Flooring Tiles / Resinous Flooring in specific rooms | Balance of Walls & OverHead | Active | 05/18/26 | 05/26/26 | 3.8 | 1.2 |
|
111.2 |
RPL10.INT.CTRC.01410 |
RPL10.Interior.Center-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out | Balance of Walls & OverHead | Complete | 05/18/26 | 05/21/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.CTRC.07800 |
RPL10.Interior.Center-Corridor - BoW - Install EPMS OH and In-wall *EPMS Separate Activty | Balance of Walls & OverHead | Active | 05/18/26 | 05/26/26 | 5.0 | 1.2 |
|
121.2 |
RPL10.INT.NS1.01430 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Active | 05/18/26 | 06/29/26 | 25.0 | 25.0 |
|
11.2 |
RPL10.INT.NS1.01740 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Complete | 05/18/26 | 05/22/26 | 5.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.02240 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Active | 05/18/26 | 06/15/26 | 25.0 | 18.8 |
|
41.2 |
RPL10.INT.NS1.02760 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Complete | 05/18/26 | 05/19/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.NS1.03280 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install HAC Busway and Cable Tray Tie-In | Remaining Tie-ins post Mech Side Aisle install | Active | 05/18/26 | 06/15/26 | 25.0 | 18.8 |
|
53.8 |
RPL10.INT.NS1.03300 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - Install HAC Busway and Cable Tray Tie-In | Remaining Tie-ins post Mech Side Aisle install | Active | 05/18/26 | 06/15/26 | 25.0 | 18.8 |
|
43.8 |
RPL10.INT.NS2.01270 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Active | 05/18/26 | 06/15/26 | 25.0 | 18.8 |
|
31.2 |
RPL10.INT.NS2.01510 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Active | 05/18/26 | 06/02/26 | 5.0 | 7.5 |
|
57.5 |
RPL10.INT.NS2.02200 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Active | 05/18/26 | 06/22/26 | 25.0 | 25.0 |
|
12.5 |
RPL10.INT.NS2.02805 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Complete | 05/18/26 | 05/19/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.03345 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install HAC Busway and Cable Tray Tie-In | Remaining Tie-ins post Mech Side Aisle install | Active | 05/18/26 | 06/15/26 | 25.0 | 18.8 |
|
27.5 |
RPL10.INT.SSB.01760 |
RPL10.Interior.SSB - Loading Dock and Storage - Mechanical Tie-In | Loading Dock and Storage | Complete | 05/18/26 | 05/22/26 | 6.2 | 0.0 |
|
0.0 |
RPL10.INT.SSBC.01590 |
RPL10.Interior.SSB-Corridor - BoW - Install Mechanical Tie-Ins (needs to micro plan) | Balance of Walls & OverHead | Active | 05/18/26 | 05/26/26 | 6.2 | 1.2 |
|
120.0 |
RPL10.SSBC.BB.1480 |
RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - MEPF - OH, Lowside, Lights | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Active | 05/18/26 | 06/01/26 | 12.5 | 6.2 |
|
171.2 |
RPL10.SSBC.BB.3275 |
RPL10.Int.Build Back.SSB-Corr - LO #4 - Hang Drywall | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Complete | 05/18/26 | 05/20/26 | 3.8 | 0.0 |
|
0.0 |
JCL.C.1380 |
RPL10 - Cost Risk LOE-19 Connectivity Package 3A - Front End Infra & Cabling (OSP,OH) | Cost LOEs | Active | 05/19/26 | 08/31/26 | 87.5 | 86.2 |
|
117.5 |
RPL10.INT.ENDC.01480 |
RPL10.Interior.End-Corridor - BoW - Tape Finish Paint BoW | Balance of Walls & Overhead | Active | 05/19/26 | 05/26/26 | 6.2 | 1.2 |
|
185.0 |
RPL10.INT.ENDC.1440 |
RPL10.Interior.End-Corridor - BoW - Mechanical Tie-In | Balance of Walls & Overhead | Active | 05/19/26 | 05/26/26 | 6.2 | 1.2 |
|
233.8 |
RPL10.INT.NS1.02780 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Complete | 05/19/26 | 05/22/26 | 25.0 | 0.0 |
|
0.0 |
RPL10.INT.NS2.02605 |
RPL10.Interior.NS2 - OFE - Control Fault Domain 4 SQ3.2 (Mech Side Aisle) | OFE NS2 Control Fault Domain 4 | Active | 05/19/26 | 05/29/26 | 16.2 | 5.0 |
|
11.2 |
RPL10.INT.NS2.02825 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Active | 05/19/26 | 05/26/26 | 25.0 | 1.2 |
|
12.5 |
RPL10.WP3A.EF.01020 |
RPL10.Conn EF1F Infrasturcture 1 (Racks & Vertical Cable Manager, Ladder Racks) | Infrastructure & Cabling | Active | 05/19/26 | 06/16/26 | 25.0 | 20.0 |
|
113.8 |
RPL10.WP3A.EF.02000 |
RPL10.Conn EF1F OSP Pathway - WBS Summary | Infrastructure & Cabling | Active | 05/19/26 | 06/30/26 | 37.5 | 32.5 |
|
201.2 |
RPL10.INT.NS1.01870 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Active | 05/20/26 | 06/02/26 | 5.0 | 5.0 |
|
83.8 |
RPL10.INT.SSB.01360 |
RPL10.Interior.SSB - BoW - Electrical Trim Out | Balance of Walls and OverHead | Active | 05/20/26 | 05/27/26 | 6.2 | 2.5 |
|
156.2 |
RPL10.INT.SSB.01820 |
RPL10.Interior.SSB - BoW - Mechanical Tie-In | Balance of Walls and OverHead | Active | 05/20/26 | 05/27/26 | 6.2 | 2.5 |
|
156.2 |
RPL10.EY.EF2.01390 |
RPL10.EY.EF2 - FSP3 - Install Roofing Z Purlin (Logistic #7 Install) | Fiber Support Platform - RPL-3 | Active | 05/21/26 | 06/02/26 | 10.0 | 7.5 |
|
248.8 |
RPL10.INT.EF1.01150 |
RPL10.Interior.EF1 - CFCI - Set North CRAH Units | OFE | Active | 05/21/26 | 05/28/26 | 6.2 | 3.8 |
|
96.2 |
RPL10.INT.NS1.01260 |
RPL10.Interior.NS1 - Control Fault Domain 6 SQ1.1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Active | 05/21/26 | 06/18/26 | 25.0 | 22.5 |
|
11.2 |
RPL10.INT.NS2.01114 |
RPL10.Interior.NS2 - MES Skids - BMS Tie-Ins ( 2 per day) | NS2 - MES Skids | Active | 05/21/26 | 06/24/26 | 30.0 | 27.5 |
|
148.8 |
RPL10.MCUP.LP2.2080 |
RPL10.MCUP.Loop 2 - Tie-in - Mechanical L2 Checklist Completion | Tie-Ins Mechanical | Active | 05/21/26 | 06/10/26 | 12.5 | 12.5 |
|
132.5 |
RPL10.SSBC.BB.3295 |
RPL10.Int.Build Back.SSB-Corr - LO #4 - Tape, Float and Paint | Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) | Active | 05/21/26 | 05/26/26 | 6.2 | 1.2 |
|
170.0 |
RPL10.EY.SSB.01260 |
RPL10.EY.SSB - L2 Checklist Completion | Tie-ins | Active | 05/22/26 | 06/08/26 | 12.5 | 12.5 |
|
53.8 |
DCC.B10.3010 |
[NWB] Production Gear Delivered [Network Suite] DR/EBB | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3015 |
[NWB] Production Gear Delivered [Network Suite] MA | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
408.8 |
DCC.B10.3020 |
[NWB] Production Gear Delivered [Network Suite] XSW | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
408.8 |
DCC.B10.3025 |
[NWB] Production Gear Delivered [NWS1] Front End (SSW & FSW) | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3027 |
[NWB] Production Gear Delivered [NWS1] Back End | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3035 |
[NWB] Production Gear Delivered [NWS2] Front End (SSW & FSW) | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3037 |
[NWB] Production Gear Delivered [NWS2] Back End | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3045 |
[NWB] Production Gear Delivered [NWS3] Front End (SSW & FSW) | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3047 |
[NWB] Production Gear Delivered [NWS3] Back End | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3055 |
[NWB] Production Gear Delivered [NWS4] Front End (SSW & FSW) | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3057 |
[NWB] Production Gear Delivered [NWS4] Back End | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3165 |
[NWB] PortMaps Delivered : GS | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3170 |
[NWB] PortMaps Delivered : Elevations & Cabling | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3175 |
[NWB] PortMaps Delivered :Backbone | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3180 |
[NWB] PortMaps Delivered :Front End | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3185 |
[NWB] PortMaps Delivered :Back End | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3300 |
[NWB] Cabling Start : OSP Pathways - Primary GS | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3410 |
[NWB] IBB1.1 - Circuit Delivered | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3420 |
[NWB] IBB1.2 - Circuit Delivered | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3430 |
[NWB] DCN 1 - Circuit Delivered | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3440 |
[NWB] CORP 1 - Circuit Delivered | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3450 |
[NWB] CORP OOB1 - Circuit Delivered | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3460 |
[NWB] Production Dark Fiber Path 1 - Circuit Delivered | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3527 |
[NWB] Cabling Start : Front End Production Cabling [NWS 1] | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3529 |
[NWB] Cabling Start : Back End Production Cabling [NWS 1] | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
DCC.B10.3707 |
[NWB] Cabling Start : General Services (GS) | Connectivity | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
GCD.RPL10.3527 |
[RPL10] TC Ready: Production Cabling Pathways Complete [NS1 Rows 1-8] | TC Ready: Production Cabling - NS1 | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
41.2 |
ICM.B10.1805 |
[NWB] Delivery of Substation MSG Alpha (First Delivery) NOT DPR SCOPE | Construction | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
JCL.C.1260 |
RPL10 - Cost Risk LOE-14 Cabling | Cost LOEs | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
208.8 |
JCL.C.1420 |
RPL10 - Cost Risk LOE-19 Connectivity Package 4A - Front End Network | Cost LOEs | Not Started | 05/26/26 | 03/23/27 | 258.8 | 258.8 |
|
0.0 |
RPL.10.D.X1440.XR |
Ready for Fiber Support Platform Construction - AI 2 (TCCO est Release 01-May-26) | Connectivity (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
243.8 |
RPL.10.D.X3210.XR |
500kva Temp Power Skids Energized (First 10 MW or Gen) | Power (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
26.2 |
RPL.10.D.X33X0.XR |
Pull and Term mCUP Skids - RPL10 North | Power (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
26.2 |
RPL.10.D.X33X1.XR |
Pull and Term MV Skids - RPL10 NS1 Loop 1 & 2 | Power (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
33.8 |
RPL.10.D.X33X7.XR |
Cable Pull to Concrete Pad - RPL10 NS4 Loop 1 & 2 | Power (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
33.8 |
RPL.10.D.X3900.XG |
Ready for MV Cable Pull mCUP South Loop (Loop#2) | Give Milestones (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
RPL.10.D.X4420.XR |
Natural Gas Available for Fill/Flush Cx - Utility connections (L3/L4) | Water / Gas Available (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
41.2 |
RPL.10.D.X4510.XR |
Storm Available for Roof Drain Tie-ins | Pad Ready (XREFs) | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
157.5 |
RPL.CM.D.C5620.XR |
Naboo Road | Logistics - Onsite Receive XREF Milestones | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
857.5 |
RPL.CM.D.N5620.XR |
LA 183 /Wade - Traffic Signal | Logistics - Off-Site Receive XREF Milsetones | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
115.0 |
RPL.CM.D.N5630.XR |
LA 183 /Fortenberry - Traffic Signal | Logistics - Off-Site Receive XREF Milsetones | Not Started | 05/26/26 | 05/26/26 | 0.0 | 0.0 |
|
471.2 |