Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer · Uploaded Jun 03, 2026 01:35 PM · 9281 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL.GF.D.N0140.XG NWB FacNet/CorpNet Live - to IBOS & Admin Building (Mortenson) Give Milestones (XREFs) Not Started 06/05/26 06/05/26 0.0 0.0
0%
847.5
RPL.GF.D.N0150.XG NWB FacNet/CorpNet Live - to AI Buildings (Turner) Give Milestones (XREFs) Not Started 06/05/26 06/05/26 0.0 0.0
0%
847.5
RPL.GF.D.N0155.XG NWB FacNet/CorpNet Live - to SS Buildings (DPR) Give Milestones (XREFs) Not Started 06/05/26 06/05/26 0.0 0.0
0%
847.5
RPL10.EY.EF1.01320 RPL10.EY.EF1 - FSP2 - Install Floor Grating Fiber Support Platform - RPL-2 Not Started 06/05/26 06/18/26 12.5 12.5
0%
233.8
RPL10.EY.NS3.01270 RPL10.EY.NS3 - Install GS.IDF Hut (1x GS.IDF) NX09 (06.04.26) OFE Not Started 06/05/26 06/11/26 6.2 6.2
0%
131.2
RPL10.INT.EF2.01170 RPL10.Interior.EF2 - CFCI - Set South CRAH Units OFE Not Started 06/05/26 06/11/26 6.2 6.2
0%
112.5
RPL10.INT.EF2.01200 RPL10.Interior.EF2 - Tie-ins - North CRAH Gallery - WBS Summary North CRAH Gallery Not Started 06/05/26 06/25/26 18.8 18.8
0%
178.8
RPL10.INT.EF2.01730 RPL10.Interior.EF2 - North CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) North CRAH Gallery Not Started 06/05/26 06/17/26 11.2 11.2
0%
118.8
RPL10.INT.NS1.01950 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 06/05/26 07/02/26 25.0 25.0
0%
67.5
RPL10.INT.NS1.01960 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Pull EPMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 06/05/26 07/02/26 25.0 25.0
0%
67.5
RPL10.INT.NS1.02000 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 06/05/26 07/02/26 25.0 25.0
0%
98.8
RPL10.INT.NS1.02030 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install copper from GS.IDF to BMS and EPMS panels (UG from Corr IDF) Remaining Tie-ins post Mech Side Aisle install Not Started 06/05/26 07/02/26 25.0 25.0
0%
67.5
RPL10.INT.NS2.01550 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 06/05/26 07/02/26 25.0 25.0
0%
35.0
RPL10.INT.NS2.01560 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 06/05/26 07/02/26 25.0 25.0
0%
28.8
RPL10.INT.NS2.01660 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 06/05/26 06/10/26 5.0 5.0
0%
61.2
RPL10.INT.NS2.01920 RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 06/05/26 06/10/26 5.0 5.0
0%
80.0
RPL10.INT.NS2.02240 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 06/05/26 07/02/26 25.0 25.0
0%
28.8
RPL10.INT.NS2.02865 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 06/05/26 07/02/26 25.0 25.0
0%
28.8
RPL10.INT.NS3.01113 RPL10.Interior.NS3 - MES Skids - CDU Tie-Ins NS3 - MES Skids Not Started 06/05/26 07/09/26 30.0 30.0
0%
242.5
RPL10.INT.NS4.01270 RPL10.Interior.NS4 - Control Fault Domain 2 SQ8.1 - Install Duct (LV Side) LV Side Tie-ins Not Started 06/05/26 06/10/26 5.0 5.0
0%
118.8
RPL10.PR.PR.02320 RPL10.PR MDF - Set META gear at GS.MDFs for FacNet GS-MDFs & IDFs Not Started 06/05/26 06/05/26 1.2 1.2
0%
151.2
RPL10.WP2.GSIDF.1210 CorpNet & FacNet Available - EF Network Not Started 06/05/26 06/05/26 0.0 0.0
0%
213.8
RPL10.WP2.GSIDF.4020 RPL10.Conn GSIDFNX01 - CorpNet Deployment Network Not Started 06/05/26 06/11/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4160 RPL10.Conn GSIDFNX02 - CorpNet Deployment Network Not Started 06/05/26 06/11/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4720 RPL10.Conn GSIDFNX06 - CorpNet Deployment Network Not Started 06/05/26 06/11/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4860 RPL10.Conn GSIDFNX07 - CorpNet Deployment Network Not Started 06/05/26 06/11/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.7540 RPL10.Conn GSMDF2 - CorpNet Live Network Not Started 06/05/26 06/05/26 0.0 0.0
0%
46.0
RPL10.WP2.GSIDF.7680 RPL10.Conn GSMDF1 - CorpNet Live Network Not Started 06/05/26 06/05/26 0.0 0.0
0%
46.0
FR03.1260 FR03: PSI - NS1 - PCX H01 & H02 - FTI Complete Terminations for H01 & H02 FR03: House Power Skid Missing Panel Delay Not Started 06/08/26 06/12/26 6.2 6.2
0%
40.0
FR03.1380 FR03: PSI - NS2 - PCX H01 & H02 - FTI Complete Terminations for H01 & H02 FR03: House Power Skid Missing Panel Delay Not Started 06/08/26 06/12/26 6.2 6.2
0%
53.8
ICM.B10.1212 [NWB] Start Fill & Flush of Chilled Water System Commissioning Not Started 06/08/26 06/08/26 0.0 0.0
0%
63.8
JCL.C.1280 RPL10 - Cost Risk LOE-15 Security Systems Cost LOEs Not Started 06/08/26 12/09/26 160.0 160.0
0%
106.2
RPL.10.D.X4210.XR FW Water Available for mCUP Flush/Fill - Utility connections Water / Gas Available (XREFs) Not Started 06/08/26 06/08/26 0.0 0.0
0%
12.5
RPL.10.D.X4410.XR Discharge Available for Fill/Flush Cx - Utility connections Water / Gas Available (XREFs) Not Started 06/08/26 06/08/26 0.0 0.0
0%
12.5
RPL.GF.D.N0260.XR Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to RPL7 Connectivity (XREFs) Not Started 06/08/26 06/08/26 0.0 0.0
0%
217.5
RPL10.CTRC.BB.1000 RPL10.Int.Build Back.Center-Corr - Interior Leave Out (Center Corridor) #6, #8 WBS Summary Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/08/26 07/20/26 37.5 37.5
0%
142.5
RPL10.CTRC.BB.1060 RPL10.Int.Build Back.Center-Corr - LO #6,8 - Arch Finishes - Frame, Hang Drywall, Paint, Final Finishes (LOE) Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/08/26 06/29/26 20.0 20.0
0%
142.5
RPL10.CTRC.BB.3375 RPL10.Int.Build Back.Center-Corr - LO #6 - Hang IMP Wall Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/08/26 06/10/26 3.8 3.8
0%
142.5
RPL10.CX.MCUP.01150 RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup Yard & FWM - Loop 1 (Phase 1) Fill and Flush Not Started 06/08/26 06/17/26 10.0 10.0
0%
12.5
RPL10.EY.EF1.01560 RPL10.EY.EF1 - Install CU (12) OFE Not Started 06/08/26 06/09/26 2.5 2.5
0%
90.0
RPL10.EY.EF2.01770 RPL10.EY.EF2 - Install Remaining CU (12) OFE Not Started 06/08/26 06/09/26 2.5 2.5
0%
155.0
RPL10.INT.EF1.01110 RPL10.Interior.EF1 - Priority OH - Controls / EPMS / BMS *EPMS Separate Activty OverHead Not Started 06/08/26 06/11/26 5.0 5.0
0%
125.0
RPL10.INT.EF1.01180 RPL10.Interior.EF1 - North CRAH Gallery - Install Upper Trays Interconnects North CRAH Gallery Not Started 06/08/26 06/12/26 6.2 6.2
0%
18.8
RPL10.INT.EF1.01250 RPL10.Interior.EF1 - South CRAH Gallery - Install Upper Trays Interconnects South CRAH Gallery Not Started 06/08/26 06/12/26 6.2 6.2
0%
18.8
RPL10.INT.EF1.01260 RPL10.Interior.EF1 - Tie-ins - South CRAH Gallery - WBS Summary South CRAH Gallery Not Started 06/08/26 06/30/26 21.2 21.2
0%
163.8
RPL10.INT.EF1.01480 RPL10.Interior.EF1 - EF1 West - Install Upper Trays West EF-1 Not Started 06/08/26 06/12/26 6.2 6.2
0%
18.8
RPL10.INT.EF2.01410 RPL10.Interior.EF2 - EF2 East - Install Lower Trays East EF-2 Not Started 06/08/26 06/12/26 6.2 6.2
0%
25.0
RPL10.INT.EF2.01420 RPL10.Interior.EF2 - EF2 East - Install Lighting East EF-2 Not Started 06/08/26 06/23/26 15.0 15.0
0%
113.8
RPL10.INT.NS1.01205 RPL10.Interior.NS1 - MES Skids - EPMS Tie-Ins NS1 - MES Skids Not Started 06/08/26 07/10/26 30.0 30.0
0%
133.8
RPL10.INT.NS1.02740 RPL10.Interior.NS1 - OFE - Control Fault Domain 1 SQ6.1 (Mech Side Aisle) OFE NS1 Control Fault Domain 1 Not Started 06/08/26 06/24/26 16.2 16.2
0%
31.2
RPL10.INT.SSB.01250 RPL10.Interior.SSB - Loading Dock and Storage - Install Security Loading Dock and Storage Not Started 06/08/26 06/16/26 8.8 8.8
0%
158.8
RPL10.INT.SSB.01270 RPL10.Interior.SSB - Loading Dock and Storage - Install Controls / BMS *Separate EPMS Loading Dock and Storage Not Started 06/08/26 06/11/26 5.0 5.0
0%
158.8
RPL10.INT.SSB.07100 RPL10.Interior.SSB - Loading Dock and Storage - Install OverHead Doors (Mob 2) Loading Dock and Storage Not Started 06/08/26 06/17/26 10.0 10.0
0%
153.8
RPL10.INT.SSB.07120 RPL10.Interior.SSB - Loading Dock and Storage - Install EPMS Loading Dock and Storage Not Started 06/08/26 06/11/26 5.0 5.0
0%
158.8
RPL10.PR.PR.02340 RPL10.PR MDF - Rack/ Stack/ Patch and Provisioning at GS.MDFs for FacNet GS-MDFs & IDFs Not Started 06/08/26 07/13/26 31.2 31.2
0%
151.2
RPL10.SKN.SSB.01070 RPL10.SKIN.SSB - Install Security Glazing, Doors and Ext Devices Not Started 06/08/26 06/09/26 2.5 2.5
0%
156.2
RPL10.WP2.GSIDF.7560 RPL10.Conn GSMDF2 - Security Deployment Network Not Started 06/08/26 06/12/26 5.0 5.0
0%
46.0
RPL10.WP2.GSIDF.7700 RPL10.Conn GSMDF1 - Security Deployment Network Not Started 06/08/26 06/12/26 5.0 5.0
0%
46.0
GCD.RPL10.5805 RMU Loop Ready for Energization - NS2 Loop 1 EY Not Started 06/09/26 06/09/26 0.0 0.0
0%
31.2
RPL10.EY.EF1.01140 RPL10.EY.EF1 - FSP1 - Install Grounding Wire Fiber Support Platform - RPL-1 Not Started 06/09/26 06/10/26 2.5 2.5
0%
256.2
RPL10.EY.EF1.01700 RPL10.EY.EF1 - FSP1 - Install Final Roof (Standing Seam Panels) Phase 2 Fiber Support Platform - RPL-1 Not Started 06/09/26 06/15/26 6.2 6.2
0%
227.5
RPL10.EY.ENDC.01120 RPL10.EY.End - Install Perm Paving Hardscape and Landscape Not Started 06/09/26 06/15/26 6.2 6.2
0%
408.8
RPL10.EY.ENDC.01160 RPL10.EY.End - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Not Started 06/09/26 08/18/26 62.5 62.5
0%
408.8
RPL10.EY.ENDC.01180 RPL10.EY.End - Install EPMS Tie-ins Tie-ins Not Started 06/09/26 06/29/26 18.8 18.8
0%
165.0
RPL10.INT.EF2.01435 RPL10.Interior.EF2 - EF2 East - Install Wall Mounted Ladder Racks on Full Height EF Walls East EF-2 Not Started 06/09/26 06/15/26 6.2 6.2
0%
193.8
RPL10.INT.NS1.01570 RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
31.2
RPL10.INT.NS1.01590 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
36.2
RPL10.INT.NS1.01620 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center ID Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
35.0
RPL10.INT.NS1.01730 RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
62.5
RPL10.INT.NS1.01760 RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center ID Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
45.0
RPL10.INT.NS1.01860 RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
90.0
RPL10.INT.NS1.01900 RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install copper from GS.IDF to BMS and EPMS panels (UG from Corr IDF) Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
55.0
RPL10.INT.NS2.01250 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
8.8
RPL10.INT.NS2.01360 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
12.5
RPL10.INT.NS2.01500 RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Mechanical Side Aisle Cable Tray Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
48.8
RPL10.INT.NS2.01530 RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center ID Remaining Tie-ins post Mech Side Aisle install Not Started 06/09/26 07/07/26 25.0 25.0
0%
28.8
RPL10.INT.NS4.01350 RPL10.Interior.NS4 - OFE - Control Fault Domain 3 SQ9.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS4 Control Fault Domain 3 Not Started 06/09/26 08/24/26 67.5 67.5
0%
73.8
RPL10.INT.NS4.01370 RPL10.Interior.NS4 - Control Fault Domain 2 SQ8.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 06/09/26 06/12/26 5.0 5.0
0%
140.0
RPL10.INT.NS4.02600 RPL10.Interior.NS4 - OFE - Control Fault Domain 3 SQ9.1 (LV Side Aisle) OFE NS4 Control Fault Domain 3 Not Started 06/09/26 06/12/26 5.0 5.0
0%
122.5
RPL10.INT.SSBC.01360 RPL10.Interior.SSB-Corridor - BoW - Final QC Balance of Walls & OverHead Not Started 06/09/26 06/15/26 6.2 6.2
0%
102.5
RPL10.SKN.NS12.01030 RPL10.SKIN.NS12 - Install Awning over Doors Glazing, Doors and Ext Devices Not Started 06/09/26 06/15/26 6.2 6.2
0%
137.5
RPL10.SKN.SSB.01120 RPL10.SKIN.SSB - Install Scupper and Downspouts Glazing, Doors and Ext Devices Not Started 06/09/26 06/15/26 6.2 6.2
0%
145.0
RPL10.SKN.SSB.01390 RPL10.SKIN.BLDG - Install Coping Skin Not Started 06/09/26 06/15/26 6.2 6.2
0%
301.2
RPL10.WP2.01120 RPL10.Conn GSMDF Ready for ENS Buildout - GSMDF 1&2 Supporting Services Building Not Started 06/09/26 06/09/26 0.0 0.0
0%
183.8
RPL10.WP2.GSIDF.1580 RPL10.Conn GSIDFN41 Install & Test Network (FIM) Network Not Started 06/09/26 06/11/26 3.8 3.8
0%
208.8
RPL10.WP2.GSIDF.1740 RPL10.Conn GSIDFN43 Install & Test Network (FIM) Network Not Started 06/09/26 06/11/26 3.8 3.8
0%
208.8
RPL10.WP2.GSIDF.1820 RPL10.Conn GSIDFN31 Install & Test Network (FIM) Network Not Started 06/09/26 06/11/26 3.8 3.8
0%
208.8
RPL10.WP2.GSIDF.1980 RPL10.Conn GSIDFN33 Install & Test Network (FIM) Network Not Started 06/09/26 06/11/26 3.8 3.8
0%
208.8
RPL10.WP2.GSIDF.2340 RPL10.Conn IDF Huts - (GSMDF to GSIDF) SSB NX05 WBS Summary GSIDFNX05 Not Started 06/09/26 07/17/26 35.0 35.0
0%
810.0
RPL10.WP2.GSIDF.2360 RPL10.Conn GSIDFNX05 Set Infrastructure (Racks, Waterfalls etc.) Infrastructure Not Started 06/09/26 06/15/26 6.2 6.2
0%
196.2
RPL10.WP2.GSIDF.3160 RPL10.Conn GSIDFN41 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 06/09/26 06/24/26 15.0 15.0
0%
281.2
RPL10.WP2.GSIDF.3200 RPL10.Conn GSIDFN43 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 06/09/26 06/24/26 15.0 15.0
0%
208.8
RPL10.WP2.GSIDF.3220 RPL10.Conn GSIDFN31 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 06/09/26 06/24/26 15.0 15.0
0%
281.2
RPL10.WP2.GSIDF.3260 RPL10.Conn GSIDFN33 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 06/09/26 06/24/26 15.0 15.0
0%
208.8
GCD.RPL10.5825 RMU Loop Ready for Energization - NS2 Loop 2 EY Not Started 06/10/26 06/10/26 0.0 0.0
0%
61.2
RPL10.CFCI.5260 RPL10 - Fabricate / Deliver - Bathroom Accessories (CFCI) Div. 10 - Specialities Not Started 06/10/26 06/23/26 12.5 12.5
0%
132.5
RPL10.EY.EF1.01210 RPL10.EY.EF1 - Install Mechanical Tie-ins (include penetration detail) Tie-ins Not Started 06/10/26 06/19/26 10.0 10.0
0%
105.0
RPL10.EY.EF1.01220 RPL10.EY.EF1 - Tie-ins - WBS Summary Tie-ins Not Started 06/10/26 07/22/26 37.5 37.5
0%
90.0
RPL10.EY.EF1.01330 RPL10.EY.EF1 - Install Electrical Tie-ins (include penetration detail) Tie-ins Not Started 06/10/26 06/30/26 18.8 18.8
0%
90.0
RPL10.EY.EF2.01620 RPL10.EY.EF2 - Install Remaining Mechanical Tie-ins Tie-ins Not Started 06/10/26 06/19/26 10.0 10.0
0%
155.0