Schedule Viewer
Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer
· Uploaded Jun 03, 2026 01:35 PM
· 9281 activities
Experimental
Auto-populate checklist dates from schedule:
100
Activities Shown
0
Completed
0
In Progress
0
Critical
| Activity ID | Activity Name | WBS | Status | Start | Finish | Dur (d) | Rem (d) | % Comp | Float (d) |
|---|---|---|---|---|---|---|---|---|---|
RPL.GF.D.N0140.XG |
NWB FacNet/CorpNet Live - to IBOS & Admin Building (Mortenson) | Give Milestones (XREFs) | Not Started | 06/05/26 | 06/05/26 | 0.0 | 0.0 |
|
847.5 |
RPL.GF.D.N0150.XG |
NWB FacNet/CorpNet Live - to AI Buildings (Turner) | Give Milestones (XREFs) | Not Started | 06/05/26 | 06/05/26 | 0.0 | 0.0 |
|
847.5 |
RPL.GF.D.N0155.XG |
NWB FacNet/CorpNet Live - to SS Buildings (DPR) | Give Milestones (XREFs) | Not Started | 06/05/26 | 06/05/26 | 0.0 | 0.0 |
|
847.5 |
RPL10.EY.EF1.01320 |
RPL10.EY.EF1 - FSP2 - Install Floor Grating | Fiber Support Platform - RPL-2 | Not Started | 06/05/26 | 06/18/26 | 12.5 | 12.5 |
|
233.8 |
RPL10.EY.NS3.01270 |
RPL10.EY.NS3 - Install GS.IDF Hut (1x GS.IDF) NX09 (06.04.26) | OFE | Not Started | 06/05/26 | 06/11/26 | 6.2 | 6.2 |
|
131.2 |
RPL10.INT.EF2.01170 |
RPL10.Interior.EF2 - CFCI - Set South CRAH Units | OFE | Not Started | 06/05/26 | 06/11/26 | 6.2 | 6.2 |
|
112.5 |
RPL10.INT.EF2.01200 |
RPL10.Interior.EF2 - Tie-ins - North CRAH Gallery - WBS Summary | North CRAH Gallery | Not Started | 06/05/26 | 06/25/26 | 18.8 | 18.8 |
|
178.8 |
RPL10.INT.EF2.01730 |
RPL10.Interior.EF2 - North CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) | North CRAH Gallery | Not Started | 06/05/26 | 06/17/26 | 11.2 | 11.2 |
|
118.8 |
RPL10.INT.NS1.01950 |
RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Pull BMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
67.5 |
RPL10.INT.NS1.01960 |
RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Pull EPMS from panel to devices | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
67.5 |
RPL10.INT.NS1.02000 |
RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
98.8 |
RPL10.INT.NS1.02030 |
RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install copper from GS.IDF to BMS and EPMS panels (UG from Corr IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
67.5 |
RPL10.INT.NS2.01550 |
RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install Vesda / FA | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
35.0 |
RPL10.INT.NS2.01560 |
RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install FW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
28.8 |
RPL10.INT.NS2.01660 |
RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install LV Side Aisle Cable Tray | LV Side Tie-ins | Not Started | 06/05/26 | 06/10/26 | 5.0 | 5.0 |
|
61.2 |
RPL10.INT.NS2.01920 |
RPL10.Interior.NS2 - Control Fault Domain 1 SQ6.2 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/05/26 | 06/10/26 | 5.0 | 5.0 |
|
80.0 |
RPL10.INT.NS2.02240 |
RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install TW | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
28.8 |
RPL10.INT.NS2.02865 |
RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Install Duct (MES Side) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/05/26 | 07/02/26 | 25.0 | 25.0 |
|
28.8 |
RPL10.INT.NS3.01113 |
RPL10.Interior.NS3 - MES Skids - CDU Tie-Ins | NS3 - MES Skids | Not Started | 06/05/26 | 07/09/26 | 30.0 | 30.0 |
|
242.5 |
RPL10.INT.NS4.01270 |
RPL10.Interior.NS4 - Control Fault Domain 2 SQ8.1 - Install Duct (LV Side) | LV Side Tie-ins | Not Started | 06/05/26 | 06/10/26 | 5.0 | 5.0 |
|
118.8 |
RPL10.PR.PR.02320 |
RPL10.PR MDF - Set META gear at GS.MDFs for FacNet | GS-MDFs & IDFs | Not Started | 06/05/26 | 06/05/26 | 1.2 | 1.2 |
|
151.2 |
RPL10.WP2.GSIDF.1210 |
CorpNet & FacNet Available - EF | Network | Not Started | 06/05/26 | 06/05/26 | 0.0 | 0.0 |
|
213.8 |
RPL10.WP2.GSIDF.4020 |
RPL10.Conn GSIDFNX01 - CorpNet Deployment | Network | Not Started | 06/05/26 | 06/11/26 | 5.0 | 5.0 |
|
670.0 |
RPL10.WP2.GSIDF.4160 |
RPL10.Conn GSIDFNX02 - CorpNet Deployment | Network | Not Started | 06/05/26 | 06/11/26 | 5.0 | 5.0 |
|
670.0 |
RPL10.WP2.GSIDF.4720 |
RPL10.Conn GSIDFNX06 - CorpNet Deployment | Network | Not Started | 06/05/26 | 06/11/26 | 5.0 | 5.0 |
|
670.0 |
RPL10.WP2.GSIDF.4860 |
RPL10.Conn GSIDFNX07 - CorpNet Deployment | Network | Not Started | 06/05/26 | 06/11/26 | 5.0 | 5.0 |
|
670.0 |
RPL10.WP2.GSIDF.7540 |
RPL10.Conn GSMDF2 - CorpNet Live | Network | Not Started | 06/05/26 | 06/05/26 | 0.0 | 0.0 |
|
46.0 |
RPL10.WP2.GSIDF.7680 |
RPL10.Conn GSMDF1 - CorpNet Live | Network | Not Started | 06/05/26 | 06/05/26 | 0.0 | 0.0 |
|
46.0 |
FR03.1260 |
FR03: PSI - NS1 - PCX H01 & H02 - FTI Complete Terminations for H01 & H02 | FR03: House Power Skid Missing Panel Delay | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
40.0 |
FR03.1380 |
FR03: PSI - NS2 - PCX H01 & H02 - FTI Complete Terminations for H01 & H02 | FR03: House Power Skid Missing Panel Delay | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
53.8 |
ICM.B10.1212 |
[NWB] Start Fill & Flush of Chilled Water System | Commissioning | Not Started | 06/08/26 | 06/08/26 | 0.0 | 0.0 |
|
63.8 |
JCL.C.1280 |
RPL10 - Cost Risk LOE-15 Security Systems | Cost LOEs | Not Started | 06/08/26 | 12/09/26 | 160.0 | 160.0 |
|
106.2 |
RPL.10.D.X4210.XR |
FW Water Available for mCUP Flush/Fill - Utility connections | Water / Gas Available (XREFs) | Not Started | 06/08/26 | 06/08/26 | 0.0 | 0.0 |
|
12.5 |
RPL.10.D.X4410.XR |
Discharge Available for Fill/Flush Cx - Utility connections | Water / Gas Available (XREFs) | Not Started | 06/08/26 | 06/08/26 | 0.0 | 0.0 |
|
12.5 |
RPL.GF.D.N0260.XR |
Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to RPL7 | Connectivity (XREFs) | Not Started | 06/08/26 | 06/08/26 | 0.0 | 0.0 |
|
217.5 |
RPL10.CTRC.BB.1000 |
RPL10.Int.Build Back.Center-Corr - Interior Leave Out (Center Corridor) #6, #8 WBS Summary | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 06/08/26 | 07/20/26 | 37.5 | 37.5 |
|
142.5 |
RPL10.CTRC.BB.1060 |
RPL10.Int.Build Back.Center-Corr - LO #6,8 - Arch Finishes - Frame, Hang Drywall, Paint, Final Finishes (LOE) | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 06/08/26 | 06/29/26 | 20.0 | 20.0 |
|
142.5 |
RPL10.CTRC.BB.3375 |
RPL10.Int.Build Back.Center-Corr - LO #6 - Hang IMP Wall | Build Back Interior Leave Out Wall #6 #8 (Center Corr) | Not Started | 06/08/26 | 06/10/26 | 3.8 | 3.8 |
|
142.5 |
RPL10.CX.MCUP.01150 |
RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup Yard & FWM - Loop 1 (Phase 1) | Fill and Flush | Not Started | 06/08/26 | 06/17/26 | 10.0 | 10.0 |
|
12.5 |
RPL10.EY.EF1.01560 |
RPL10.EY.EF1 - Install CU (12) | OFE | Not Started | 06/08/26 | 06/09/26 | 2.5 | 2.5 |
|
90.0 |
RPL10.EY.EF2.01770 |
RPL10.EY.EF2 - Install Remaining CU (12) | OFE | Not Started | 06/08/26 | 06/09/26 | 2.5 | 2.5 |
|
155.0 |
RPL10.INT.EF1.01110 |
RPL10.Interior.EF1 - Priority OH - Controls / EPMS / BMS *EPMS Separate Activty | OverHead | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
125.0 |
RPL10.INT.EF1.01180 |
RPL10.Interior.EF1 - North CRAH Gallery - Install Upper Trays Interconnects | North CRAH Gallery | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF1.01250 |
RPL10.Interior.EF1 - South CRAH Gallery - Install Upper Trays Interconnects | South CRAH Gallery | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF1.01260 |
RPL10.Interior.EF1 - Tie-ins - South CRAH Gallery - WBS Summary | South CRAH Gallery | Not Started | 06/08/26 | 06/30/26 | 21.2 | 21.2 |
|
163.8 |
RPL10.INT.EF1.01480 |
RPL10.Interior.EF1 - EF1 West - Install Upper Trays | West EF-1 | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
18.8 |
RPL10.INT.EF2.01410 |
RPL10.Interior.EF2 - EF2 East - Install Lower Trays | East EF-2 | Not Started | 06/08/26 | 06/12/26 | 6.2 | 6.2 |
|
25.0 |
RPL10.INT.EF2.01420 |
RPL10.Interior.EF2 - EF2 East - Install Lighting | East EF-2 | Not Started | 06/08/26 | 06/23/26 | 15.0 | 15.0 |
|
113.8 |
RPL10.INT.NS1.01205 |
RPL10.Interior.NS1 - MES Skids - EPMS Tie-Ins | NS1 - MES Skids | Not Started | 06/08/26 | 07/10/26 | 30.0 | 30.0 |
|
133.8 |
RPL10.INT.NS1.02740 |
RPL10.Interior.NS1 - OFE - Control Fault Domain 1 SQ6.1 (Mech Side Aisle) | OFE NS1 Control Fault Domain 1 | Not Started | 06/08/26 | 06/24/26 | 16.2 | 16.2 |
|
31.2 |
RPL10.INT.SSB.01250 |
RPL10.Interior.SSB - Loading Dock and Storage - Install Security | Loading Dock and Storage | Not Started | 06/08/26 | 06/16/26 | 8.8 | 8.8 |
|
158.8 |
RPL10.INT.SSB.01270 |
RPL10.Interior.SSB - Loading Dock and Storage - Install Controls / BMS *Separate EPMS | Loading Dock and Storage | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
158.8 |
RPL10.INT.SSB.07100 |
RPL10.Interior.SSB - Loading Dock and Storage - Install OverHead Doors (Mob 2) | Loading Dock and Storage | Not Started | 06/08/26 | 06/17/26 | 10.0 | 10.0 |
|
153.8 |
RPL10.INT.SSB.07120 |
RPL10.Interior.SSB - Loading Dock and Storage - Install EPMS | Loading Dock and Storage | Not Started | 06/08/26 | 06/11/26 | 5.0 | 5.0 |
|
158.8 |
RPL10.PR.PR.02340 |
RPL10.PR MDF - Rack/ Stack/ Patch and Provisioning at GS.MDFs for FacNet | GS-MDFs & IDFs | Not Started | 06/08/26 | 07/13/26 | 31.2 | 31.2 |
|
151.2 |
RPL10.SKN.SSB.01070 |
RPL10.SKIN.SSB - Install Security | Glazing, Doors and Ext Devices | Not Started | 06/08/26 | 06/09/26 | 2.5 | 2.5 |
|
156.2 |
RPL10.WP2.GSIDF.7560 |
RPL10.Conn GSMDF2 - Security Deployment | Network | Not Started | 06/08/26 | 06/12/26 | 5.0 | 5.0 |
|
46.0 |
RPL10.WP2.GSIDF.7700 |
RPL10.Conn GSMDF1 - Security Deployment | Network | Not Started | 06/08/26 | 06/12/26 | 5.0 | 5.0 |
|
46.0 |
GCD.RPL10.5805 |
RMU Loop Ready for Energization - NS2 Loop 1 | EY | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
31.2 |
RPL10.EY.EF1.01140 |
RPL10.EY.EF1 - FSP1 - Install Grounding Wire | Fiber Support Platform - RPL-1 | Not Started | 06/09/26 | 06/10/26 | 2.5 | 2.5 |
|
256.2 |
RPL10.EY.EF1.01700 |
RPL10.EY.EF1 - FSP1 - Install Final Roof (Standing Seam Panels) Phase 2 | Fiber Support Platform - RPL-1 | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
227.5 |
RPL10.EY.ENDC.01120 |
RPL10.EY.End - Install Perm Paving | Hardscape and Landscape | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
408.8 |
RPL10.EY.ENDC.01160 |
RPL10.EY.End - Install Hardscape and Landscape - WBS Summary | Hardscape and Landscape | Not Started | 06/09/26 | 08/18/26 | 62.5 | 62.5 |
|
408.8 |
RPL10.EY.ENDC.01180 |
RPL10.EY.End - Install EPMS Tie-ins | Tie-ins | Not Started | 06/09/26 | 06/29/26 | 18.8 | 18.8 |
|
165.0 |
RPL10.INT.EF2.01435 |
RPL10.Interior.EF2 - EF2 East - Install Wall Mounted Ladder Racks on Full Height EF Walls | East EF-2 | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
193.8 |
RPL10.INT.NS1.01570 |
RPL10.Interior.NS1 - Control Fault Domain 5 SQ2.1 - L2 Checklist Completion | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
31.2 |
RPL10.INT.NS1.01590 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
36.2 |
RPL10.INT.NS1.01620 |
RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center ID | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
35.0 |
RPL10.INT.NS1.01730 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
62.5 |
RPL10.INT.NS1.01760 |
RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center ID | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
45.0 |
RPL10.INT.NS1.01860 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
90.0 |
RPL10.INT.NS1.01900 |
RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - Install copper from GS.IDF to BMS and EPMS panels (UG from Corr IDF) | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
55.0 |
RPL10.INT.NS2.01250 |
RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - Install Copper from GS.IDF to BMS and EPMS panels | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
8.8 |
RPL10.INT.NS2.01360 |
RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
12.5 |
RPL10.INT.NS2.01500 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install Mechanical Side Aisle Cable Tray | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
48.8 |
RPL10.INT.NS2.01530 |
RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - Install copper from GS.IDF to BMS and EPMS panels (UG from Center ID | Remaining Tie-ins post Mech Side Aisle install | Not Started | 06/09/26 | 07/07/26 | 25.0 | 25.0 |
|
28.8 |
RPL10.INT.NS4.01350 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 3 SQ9.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary | OFE NS4 Control Fault Domain 3 | Not Started | 06/09/26 | 08/24/26 | 67.5 | 67.5 |
|
73.8 |
RPL10.INT.NS4.01370 |
RPL10.Interior.NS4 - Control Fault Domain 2 SQ8.1 - Install LV Side Aisle HAC Busway | LV Side Tie-ins | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
140.0 |
RPL10.INT.NS4.02600 |
RPL10.Interior.NS4 - OFE - Control Fault Domain 3 SQ9.1 (LV Side Aisle) | OFE NS4 Control Fault Domain 3 | Not Started | 06/09/26 | 06/12/26 | 5.0 | 5.0 |
|
122.5 |
RPL10.INT.SSBC.01360 |
RPL10.Interior.SSB-Corridor - BoW - Final QC | Balance of Walls & OverHead | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
102.5 |
RPL10.SKN.NS12.01030 |
RPL10.SKIN.NS12 - Install Awning over Doors | Glazing, Doors and Ext Devices | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
137.5 |
RPL10.SKN.SSB.01120 |
RPL10.SKIN.SSB - Install Scupper and Downspouts | Glazing, Doors and Ext Devices | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
145.0 |
RPL10.SKN.SSB.01390 |
RPL10.SKIN.BLDG - Install Coping | Skin | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
301.2 |
RPL10.WP2.01120 |
RPL10.Conn GSMDF Ready for ENS Buildout - GSMDF 1&2 | Supporting Services Building | Not Started | 06/09/26 | 06/09/26 | 0.0 | 0.0 |
|
183.8 |
RPL10.WP2.GSIDF.1580 |
RPL10.Conn GSIDFN41 Install & Test Network (FIM) | Network | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
208.8 |
RPL10.WP2.GSIDF.1740 |
RPL10.Conn GSIDFN43 Install & Test Network (FIM) | Network | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
208.8 |
RPL10.WP2.GSIDF.1820 |
RPL10.Conn GSIDFN31 Install & Test Network (FIM) | Network | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
208.8 |
RPL10.WP2.GSIDF.1980 |
RPL10.Conn GSIDFN33 Install & Test Network (FIM) | Network | Not Started | 06/09/26 | 06/11/26 | 3.8 | 3.8 |
|
208.8 |
RPL10.WP2.GSIDF.2340 |
RPL10.Conn IDF Huts - (GSMDF to GSIDF) SSB NX05 WBS Summary | GSIDFNX05 | Not Started | 06/09/26 | 07/17/26 | 35.0 | 35.0 |
|
810.0 |
RPL10.WP2.GSIDF.2360 |
RPL10.Conn GSIDFNX05 Set Infrastructure (Racks, Waterfalls etc.) | Infrastructure | Not Started | 06/09/26 | 06/15/26 | 6.2 | 6.2 |
|
196.2 |
RPL10.WP2.GSIDF.3160 |
RPL10.Conn GSIDFN41 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/09/26 | 06/24/26 | 15.0 | 15.0 |
|
281.2 |
RPL10.WP2.GSIDF.3200 |
RPL10.Conn GSIDFN43 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/09/26 | 06/24/26 | 15.0 | 15.0 |
|
208.8 |
RPL10.WP2.GSIDF.3220 |
RPL10.Conn GSIDFN31 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/09/26 | 06/24/26 | 15.0 | 15.0 |
|
281.2 |
RPL10.WP2.GSIDF.3260 |
RPL10.Conn GSIDFN33 Install Copper, WAPs, Security Camera & Access Control | Cabling | Not Started | 06/09/26 | 06/24/26 | 15.0 | 15.0 |
|
208.8 |
GCD.RPL10.5825 |
RMU Loop Ready for Energization - NS2 Loop 2 | EY | Not Started | 06/10/26 | 06/10/26 | 0.0 | 0.0 |
|
61.2 |
RPL10.CFCI.5260 |
RPL10 - Fabricate / Deliver - Bathroom Accessories | (CFCI) Div. 10 - Specialities | Not Started | 06/10/26 | 06/23/26 | 12.5 | 12.5 |
|
132.5 |
RPL10.EY.EF1.01210 |
RPL10.EY.EF1 - Install Mechanical Tie-ins (include penetration detail) | Tie-ins | Not Started | 06/10/26 | 06/19/26 | 10.0 | 10.0 |
|
105.0 |
RPL10.EY.EF1.01220 |
RPL10.EY.EF1 - Tie-ins - WBS Summary | Tie-ins | Not Started | 06/10/26 | 07/22/26 | 37.5 | 37.5 |
|
90.0 |
RPL10.EY.EF1.01330 |
RPL10.EY.EF1 - Install Electrical Tie-ins (include penetration detail) | Tie-ins | Not Started | 06/10/26 | 06/30/26 | 18.8 | 18.8 |
|
90.0 |
RPL10.EY.EF2.01620 |
RPL10.EY.EF2 - Install Remaining Mechanical Tie-ins | Tie-ins | Not Started | 06/10/26 | 06/19/26 | 10.0 | 10.0 |
|
155.0 |