Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer · Uploaded Jun 03, 2026 01:35 PM · 9281 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.EY.EF2.01630 RPL10.EY.EF2 - Install Remaining Electrical Tie-ins Tie-ins Not Started 06/10/26 06/16/26 6.2 6.2
0%
158.8
RPL10.EY.NS1.01340 RPL10.EY.NS1 - Install Lighting Hardscape and Landscape Not Started 06/10/26 06/23/26 12.5 12.5
0%
168.8
RPL10.EY.NS2.01340 RPL10.EY.NS2 - Install Lighting Hardscape and Landscape Not Started 06/10/26 06/23/26 12.5 12.5
0%
180.0
RPL10.INT.NS3.01060 RPL10.Interior.NS3 - OFE - LV Skids and TopHat - Set / Place / Anchor (04.30.26) (Rev-05.11.26) OFE Not Started 06/10/26 07/08/26 25.0 25.0
0%
33.8
RPL10.INT.NS3.01160 RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 1 SQ7.2 - WBS Summary Tie-Ins NS3 Control Fault Domain 1 Not Started 06/10/26 10/16/26 113.8 113.8
0%
66.2
RPL10.INT.NS3.03120 RPL10.Interior.NS3 - Control Fault Domain 1 SQ7.2 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Not Started 06/10/26 07/08/26 25.0 25.0
0%
148.8
RPL10.INT.NS4.01390 RPL10.Interior.NS4 - Control Fault Domain 2 SQ8.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 06/10/26 06/15/26 5.0 5.0
0%
140.0
RPL10.SSBC.BB.1180 RPL10.Int.Build Back.SSB-Corr - LO #2,3,4 - Final Clean Build Back Interior Leave Out Wall #2 #3 #4 (SSB Corr) Not Started 06/10/26 06/15/26 5.0 5.0
0%
170.0
RPL10.WP4.NS1.01040 RPL10.Conn NS1.CFD6 Infrastructure - WBS Summary Infrastructure Not Started 06/10/26 06/15/26 5.0 5.0
0%
71.2
RPL10.WP4.NS1.01060 RPL10.Conn NS1.CFD6 Infrastructure Infrastructure Not Started 06/10/26 06/15/26 5.0 5.0
0%
71.2
GCD.RPL10.5745 [RPL10] TC Ready: All General Services [RPL10-Exterior IDFs] TC Ready: General Services Not Started 06/11/26 06/11/26 0.0 0.0
0%
208.8
ICM.B10.2530 [NWB] L3/L4 Start EY - NS1 Commissioning Not Started 06/11/26 06/11/26 0.0 0.0
0%
166.2
RPL.GF.D.N0100.XG GS.EF1 Infrastructure Ready RPL10 Give Milestones (XREFs) Not Started 06/11/26 06/11/26 0.0 0.0
0%
841.2
RPL.GF.D.N0290.XR Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to AI2 Connectivity (XREFs) Not Started 06/11/26 06/11/26 0.0 0.0
0%
156.2
RPL.GF.D.N0610.XG GS.IDF Hut Install Complete (03, 04, 08, 09, 10) Give Milestones (XREFs) Not Started 06/11/26 06/11/26 0.0 0.0
0%
841.2
RPL10.CTRC.BB.3395 RPL10.Int.Build Back.Center-Corr - LO #6 - Install Remaining Hilti Steel Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/11/26 06/15/26 3.8 3.8
0%
151.2
RPL10.CTRC.BB.3435 RPL10.Int.Build Back.Center-Corr - LO #8 - Frame Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/11/26 06/12/26 2.5 2.5
0%
142.5
RPL10.CX.MCUP.01040 RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - FWM mCup Loop 1 (mCup #1,#3,#5,#7) Not Started 06/11/26 06/24/26 12.5 12.5
0%
26.2
RPL10.CX.NS1.01020 RPL10.CX.NS1 - L3/L4 - MV Skids (8) Loop 2 NS1 ELECTRICAL Not Started 06/11/26 06/22/26 10.0 10.0
0%
18.8
RPL10.INT.CTRC.01350 RPL10.Interior.Center-Corridor - BoW - Final Paint Balance of Walls & OverHead Not Started 06/11/26 06/17/26 6.2 6.2
0%
86.2
RPL10.INT.EF1.01230 RPL10.Interior.EF1 - North CRAH Gallery - Leak Detection / Heat Trace North CRAH Gallery Not Started 06/11/26 06/17/26 6.2 6.2
0%
101.2
RPL10.INT.EF1.01470 RPL10.Interior.EF1 - EF1 East - Set Passive Panels / Racks East EF-1 Not Started 06/11/26 06/17/26 6.2 6.2
0%
175.0
RPL10.INT.EF1.01630 RPL10.Interior.EF1 - South CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) South CRAH Gallery Not Started 06/11/26 06/23/26 11.2 11.2
0%
96.2
RPL10.INT.EF2.01240 RPL10.Interior.EF2 - North CRAH Gallery - Leak Detection / Heat Trace North CRAH Gallery Not Started 06/11/26 06/17/26 6.2 6.2
0%
118.8
RPL10.INT.NS2.01800 RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 06/11/26 06/16/26 5.0 5.0
0%
66.2
RPL10.INT.NS4.01410 RPL10.Interior.NS4 - Control Fault Domain 3 SQ9.1 - Install Duct (LV Side) LV Side Tie-ins Not Started 06/11/26 06/16/26 5.0 5.0
0%
138.8
RPL10.INT.NS4.01860 RPL10.Interior.NS4 - Tie-ins - Control Fault Domain 6 SQ12.1 - WBS Summary Tie-Ins NS4 Control Fault Domain 6 Not Started 06/11/26 11/25/26 146.2 146.2
0%
103.8
RPL10.INT.NS4.03200 RPL10.Interior.NS4 - Control Fault Domain 6 SQ12.1 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Not Started 06/11/26 07/09/26 25.0 25.0
0%
216.2
RPL10.WP2.GSIDF.4040 RPL10.Conn GSIDFNX01 - CorpNet Live Network Not Started 06/11/26 06/11/26 0.0 0.0
0%
670.0
RPL10.WP2.GSIDF.4180 RPL10.Conn GSIDFNX02 - CorpNet Live Network Not Started 06/11/26 06/11/26 0.0 0.0
0%
670.0
RPL10.WP2.GSIDF.4740 RPL10.Conn GSIDFNX06 - CorpNet Live Network Not Started 06/11/26 06/11/26 0.0 0.0
0%
670.0
RPL10.WP2.GSIDF.4880 RPL10.Conn GSIDFNX07 - CorpNet Live Network Not Started 06/11/26 06/11/26 0.0 0.0
0%
670.0
GCD.RPL10.3985 MCUP Ready for Energization - (MCUPs Loop 2) mCup Not Started 06/12/26 06/12/26 0.0 0.0
0%
137.5
RPL10.Conn.MS.02210 FacNet Ready @ NS1-EY IDFs Connectivity Milestones Not Started 06/12/26 06/12/26 0.0 0.0
0%
207.5
RPL10.Conn.MS.02230 FacNet Ready @ NS2-EY IDFs Connectivity Milestones Not Started 06/12/26 06/12/26 0.0 0.0
0%
207.5
RPL10.INT.EF2.01110 RPL10.Interior.EF2 - Priority OH - Controls / EPMS / BMS OverHead Not Started 06/12/26 06/17/26 5.0 5.0
0%
131.2
RPL10.INT.EF2.01180 RPL10.Interior.EF2 - North CRAH Gallery - Install Upper Trays Interconnects North CRAH Gallery Not Started 06/12/26 06/18/26 6.2 6.2
0%
20.0
RPL10.INT.EF2.01220 RPL10.Interior.EF2 - South CRAH Gallery - Install Upper Trays Interconnects South CRAH Gallery Not Started 06/12/26 06/18/26 6.2 6.2
0%
20.0
RPL10.INT.EF2.01230 RPL10.Interior.EF2 - North CRAH Gallery - Install Lower Trays Interconnects North CRAH Gallery Not Started 06/12/26 06/18/26 6.2 6.2
0%
20.0
RPL10.INT.EF2.01260 RPL10.Interior.EF2 - Tie-ins - South CRAH Gallery - WBS Summary South CRAH Gallery Not Started 06/12/26 06/25/26 12.5 12.5
0%
178.8
RPL10.INT.EF2.01270 RPL10.Interior.EF2 - South CRAH Gallery - Install Lower Trays Interconnects South CRAH Gallery Not Started 06/12/26 06/18/26 6.2 6.2
0%
20.0
RPL10.INT.EF2.01480 RPL10.Interior.EF2 - EF2 West - Install Upper Trays West EF-2 Not Started 06/12/26 06/18/26 6.2 6.2
0%
20.0
RPL10.INT.EF2.01490 RPL10.Interior.EF2 - Tie-ins - EF2 West - WBS Summary West EF-2 Not Started 06/12/26 08/24/26 63.8 63.8
0%
145.0
RPL10.INT.EF2.01500 RPL10.Interior.EF2 - EF2 West - Install Lower Trays West EF-2 Not Started 06/12/26 06/18/26 6.2 6.2
0%
20.0
RPL10.INT.EF2.01750 RPL10.Interior.EF2 - South CRAH Gallery - Piping Tie-ins FW (In Gallery #3 CRAH Units) South CRAH Gallery Not Started 06/12/26 06/24/26 11.2 11.2
0%
112.5
RPL10.INT.ENDC.01320 RPL10.Interior.End-Corridor - BoW - Install Toilet Accessories Balance of Walls & Overhead Not Started 06/12/26 06/22/26 8.8 8.8
0%
202.5
RPL10.INT.NS1.02040 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/12/26 07/10/26 25.0 25.0
0%
67.5
RPL10.INT.NS2.01580 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Pull BMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 06/12/26 07/10/26 25.0 25.0
0%
35.0
RPL10.INT.NS2.01590 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Pull EPMS from panel to devices Remaining Tie-ins post Mech Side Aisle install Not Started 06/12/26 07/10/26 25.0 25.0
0%
35.0
RPL10.INT.NS2.01600 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - Set UPS and Panel (2) Remaining Tie-ins post Mech Side Aisle install Not Started 06/12/26 07/10/26 25.0 25.0
0%
28.8
RPL10.INT.NS3.01090 RPL10.Interior.NS3 - LV Skids and TopHat Tie-ins (LOE) NS3 - LV Skids and TopHat Not Started 06/12/26 07/20/26 32.5 32.5
0%
146.2
RPL10.INT.NS3.01091 RPL10.Interior.NS3 - LV Skids and TopHat - Set & Anchor Interconnects NS3 - LV Skids and TopHat Not Started 06/12/26 07/08/26 22.5 22.5
0%
146.2
RPL10.INT.NS4.01093 RPL10.Interior.NS4 - LV Skids and TopHat - Top Hat Busway NS4 - LV Skids and TopHat Not Started 06/12/26 07/02/26 18.8 18.8
0%
147.5
RPL10.INT.NS4.01114 RPL10.Interior.NS4 - MES Skids - BMS Tie-Ins NS4 - MES Skids Not Started 06/12/26 07/16/26 30.0 30.0
0%
232.5
RPL10.WP2.GSIDF.4060 RPL10.Conn GSIDFNX01 - Security Deployment Network Not Started 06/12/26 06/18/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4200 RPL10.Conn GSIDFNX02 - Security Deployment Network Not Started 06/12/26 06/18/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4760 RPL10.Conn GSIDFNX06 - Security Deployment Network Not Started 06/12/26 06/18/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4900 RPL10.Conn GSIDFNX07 - Security Deployment Network Not Started 06/12/26 06/18/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.7580 RPL10.Conn GSMDF2 - Security Live Network Not Started 06/12/26 06/12/26 0.0 0.0
0%
46.0
RPL10.WP2.GSIDF.7720 RPL10.Conn GSMDF1 - Security Live Network Not Started 06/12/26 06/12/26 0.0 0.0
0%
46.0
FR03.1280 FR03: PSI - NS1 - PCX H01 & H02 - FTI Quality Checks FR03: House Power Skid Missing Panel Delay Not Started 06/15/26 06/16/26 2.5 2.5
0%
40.0
FR03.1400 FR03: PSI - NS2 - PCX H01 & H02 - FTI Quality Checks FR03: House Power Skid Missing Panel Delay Not Started 06/15/26 06/16/26 2.5 2.5
0%
53.8
RPL.10.D.X38X1.XR 100MW (40 MW Initial , 60 MW later) Cx Temp Power to MV Skids RPL10 mCUPs (South)Available Power (XREFs) Not Started 06/15/26 06/15/26 0.0 0.0
0%
130.0
RPL10.CTRC.BB.3455 RPL10.Int.Build Back.Center-Corr - LO #8 - MEPF - In Wall Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/15/26 06/17/26 3.8 3.8
0%
142.5
RPL10.Conn.MS.02290 FacNet Ready @ MCUP IDFs Connectivity Milestones Not Started 06/15/26 06/15/26 0.0 0.0
0%
206.2
RPL10.INT.EF1.01220 RPL10.Interior.EF1 - North CRAH Gallery - Install Lower Trays Interconnects North CRAH Gallery Not Started 06/15/26 06/19/26 6.2 6.2
0%
18.8
RPL10.INT.EF1.01300 RPL10.Interior.EF1 - South CRAH Gallery - Install Lower Trays Interconnects South CRAH Gallery Not Started 06/15/26 06/19/26 6.2 6.2
0%
18.8
RPL10.INT.EF1.01500 RPL10.Interior.EF1 - EF1 West - Install Lower Trays West EF-1 Not Started 06/15/26 06/19/26 6.2 6.2
0%
18.8
RPL10.INT.EF1.01510 RPL10.Interior.EF1 - EF1 West - Install Lighting West EF-1 Not Started 06/15/26 06/30/26 15.0 15.0
0%
96.2
RPL10.INT.EF2.01430 RPL10.Interior.EF2 - EF2 East - Pull EPMS / BMS from panel to devices East EF-2 Not Started 06/15/26 06/19/26 6.2 6.2
0%
116.2
RPL10.INT.EF2.01440 RPL10.Interior.EF2 - EF2 East - Install copper from GS.IDF to BMS and EPMS panels East EF-2 Not Started 06/15/26 06/19/26 6.2 6.2
0%
116.2
RPL10.INT.EF2.01450 RPL10.Interior.EF2 - EF2 East - Fire Life Safety East EF-2 Not Started 06/15/26 06/23/26 8.8 8.8
0%
181.2
RPL10.INT.ENDC.01250 RPL10.Interior.End-Corridor - BoW - Set Equipment / Interior Balance of Walls & Overhead Not Started 06/15/26 06/19/26 6.2 6.2
0%
185.0
RPL10.INT.NS4.01490 RPL10.Interior.NS4 - OFE - Control Fault Domain 4 SQ10.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS4 Control Fault Domain 4 Not Started 06/15/26 09/08/26 75.0 75.0
0%
93.8
RPL10.INT.NS4.01510 RPL10.Interior.NS4 - Control Fault Domain 3 SQ9.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 06/15/26 06/18/26 5.0 5.0
0%
170.0
RPL10.INT.NS4.02660 RPL10.Interior.NS4 - OFE - Control Fault Domain 4 SQ10.1 (LV Side Aisle) OFE NS4 Control Fault Domain 4 Not Started 06/15/26 06/18/26 5.0 5.0
0%
151.2
RPL10.MCUP.LP1.2000 RPL10.MCUP.Loop 1 - Install Lighting Hardscape and Landscape Not Started 06/15/26 06/26/26 12.5 12.5
0%
441.2
RPL10.MCUP.LP1.2500 RPL10.MCUP.Loop 1 - Install Bollards Hardscape and Landscape Not Started 06/15/26 06/26/26 12.5 12.5
0%
430.0
RPL10.WP2.GSIDF.7600 RPL10.Conn GSMDF2 - Network Deployment Network Not Started 06/15/26 06/26/26 10.0 10.0
0%
46.0
RPL10.WP2.GSIDF.7740 RPL10.Conn GSMDF1 - Network Deployment Network Not Started 06/15/26 06/26/26 10.0 10.0
0%
46.0
RPL10.CTRC.BB.3415 RPL10.Int.Build Back.Center-Corr - LO #6 - Install Remaining Cable Tray on Hilti Steel Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/16/26 06/18/26 3.8 3.8
0%
151.2
RPL10.EY.EF1.01370 RPL10.EY.EF1 - FSP2 - Install Final Roof (Standing Seam Panels) Phase 1 Fiber Support Platform - RPL-2 Not Started 06/16/26 06/22/26 6.2 6.2
0%
227.5
RPL10.EY.EF1.01800 RPL10.EY.EF1 - FSP1 - Install Louvers Phase 2 Fiber Support Platform - RPL-1 Not Started 06/16/26 06/22/26 6.2 6.2
0%
240.0
RPL10.EY.ENDC.01170 RPL10.EY.End - Install Lighting Hardscape and Landscape Not Started 06/16/26 07/07/26 18.8 18.8
0%
408.8
RPL10.INT.EF2.01525 RPL10.Interior.EF2 - EF2 West - Install Wall Mounted Ladder Racks on Full Height EF Walls West EF-2 Not Started 06/16/26 06/22/26 6.2 6.2
0%
193.8
RPL10.INT.NS1.01710 RPL10.Interior.NS1 - Control Fault Domain 4 SQ3.1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/16/26 07/14/26 25.0 25.0
0%
35.0
RPL10.INT.NS1.01850 RPL10.Interior.NS1 - Control Fault Domain 3 SQ4.1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/16/26 07/14/26 25.0 25.0
0%
45.0
RPL10.INT.NS1.01990 RPL10.Interior.NS1 - Control Fault Domain 2 SQ5.1 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/16/26 07/14/26 25.0 25.0
0%
55.0
RPL10.INT.NS2.01290 RPL10.Interior.NS2 - Control Fault Domain 6 SQ1.2 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/16/26 07/14/26 25.0 25.0
0%
8.8
RPL10.INT.NS2.01390 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - Install Copper from GS.IDF to BMS and EPMS panels Remaining Tie-ins post Mech Side Aisle install Not Started 06/16/26 07/14/26 25.0 25.0
0%
12.5
RPL10.INT.NS2.01620 RPL10.Interior.NS2 - Control Fault Domain 4 SQ3.2 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/16/26 07/14/26 25.0 25.0
0%
28.8
RPL10.INT.NS3.01300 RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 2 SQ8.2 - WBS Summary Tie-Ins NS3 Control Fault Domain 2 Not Started 06/16/26 10/21/26 112.5 112.5
0%
72.5
RPL10.INT.NS3.03140 RPL10.Interior.NS3 - Control Fault Domain 2 SQ8.2 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Not Started 06/16/26 07/14/26 25.0 25.0
0%
153.8
RPL10.INT.NS4.01530 RPL10.Interior.NS4 - Control Fault Domain 3 SQ9.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 06/16/26 06/19/26 5.0 5.0
0%
170.0
RPL10.INT.SSBC.01440 RPL10.Interior.SSB-Corridor - BoW - Electrical L2 Checklist Completion Balance of Walls & OverHead Not Started 06/16/26 06/29/26 12.5 12.5
0%
102.5
RPL10.INT.SSBC.01470 RPL10.Interior.SSB-Corridor - BoW - Mechanical L2 Checklist Completion Balance of Walls & OverHead Not Started 06/16/26 06/29/26 12.5 12.5
0%
102.5
RPL10.SKN.EF12.01030 RPL10.SKIN.EF12 - Install Awning over Doors Glazing, Doors and Ext Devices Not Started 06/16/26 06/22/26 6.2 6.2
0%
241.2
RPL10.SKN.NS12.01040 RPL10.SKIN.NS12 - Install Louvers Glazing, Doors and Ext Devices Not Started 06/16/26 06/22/26 6.2 6.2
0%
137.5
RPL10.SKN.NS12.01110 RPL10.SKIN.NS12 - Install Scupper and Downspouts Glazing, Doors and Ext Devices Not Started 06/16/26 06/22/26 6.2 6.2
0%
145.0
RPL10.SKN.SSB.01170 RPL10.SKIN.SSB - QC Glazing, Doors and Ext Devices Not Started 06/16/26 06/17/26 2.5 2.5
0%
151.2