Schedule Viewer

Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer · Uploaded Jun 03, 2026 01:35 PM · 9281 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
2
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.WP2.GSIDF.4100 RPL10.Conn GSIDFNX01 - Network Deployment Network Not Started 06/19/26 06/25/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4240 RPL10.Conn GSIDFNX02 - Network Deployment Network Not Started 06/19/26 06/25/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4800 RPL10.Conn GSIDFNX06 - Network Deployment Network Not Started 06/19/26 06/25/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.4940 RPL10.Conn GSIDFNX07 - Network Deployment Network Not Started 06/19/26 06/25/26 5.0 5.0
0%
670.0
RPL10.WP2.GSIDF.5420 RPL10.Conn GSIDFNX11 - CorpNet Deployment Network Not Started 06/19/26 06/25/26 5.0 5.0
0%
660.0
RPL10.WP4.027240 RPL10.Conn NS1.CFD6.48<>06-10 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/19/26 06/23/26 3.8 3.8
0%
110.0
RPL10.WP4.NS1.01120 RPL10.Conn NS1.CFD6 Network Suite [JXSW<>MA] Multi Drop Cable Pre ORv3 Rack Not Started 06/19/26 06/23/26 3.8 3.8
0%
71.2
DCC.B10.3557 [NWB] Cabling Start : Front End Production Cabling [NWS 4] Connectivity Not Started 06/22/26 06/22/26 0.0 0.0
0%
833.8
DCC.B10.3559 [NWB] Cabling Start : Back End Production Cabling [NWS 4] Connectivity Not Started 06/22/26 06/22/26 0.0 0.0
0%
833.8
FR03.1320 FR03: PSI - NS1 - PCX H01 & H02 - 3rd Party Inspections FR03: House Power Skid Missing Panel Delay Not Started 06/22/26 06/23/26 2.5 2.5
0%
40.0
FR03.1440 FR03: PSI - NS2 - PCX H01 & H02 - 3rd Party Inspections FR03: House Power Skid Missing Panel Delay Not Started 06/22/26 06/23/26 2.5 2.5
0%
53.8
GCD.RPL10.3528 [RPL10] TC Ready: Production Cabling Pathways Complete [NS1 Rows 9-16] TC Ready: Production Cabling - NS1 Not Started 06/22/26 06/22/26 0.0 0.0
0%
25.0
RPL10.CTRC.BB.3515 RPL10.Int.Build Back.Center-Corr - LO #7 - Install Remaining Hilti Steel Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) Not Started 06/22/26 06/24/26 3.8 3.8
0%
142.5
RPL10.EY.EF1.01250 RPL10.EY.EF1 - Install Sleeves MEPL Hardscape and Landscape Not Started 06/22/26 06/26/26 6.2 6.2
0%
416.2
RPL10.EY.EF1.01260 RPL10.EY.EF1 - Install Hardscape and Landscape - WBS Summary Hardscape and Landscape Not Started 06/22/26 08/11/26 45.0 45.0
0%
415.0
RPL10.EY.EF2.01650 RPL10.EY.EF2 - Remaining L2 Checklist Completion Tie-ins Not Started 06/22/26 06/26/26 6.2 6.2
0%
155.0
RPL10.INT.EF1.01270 RPL10.Interior.EF1 - North CRAH Gallery - Pull EPMS / BMS from panel to devices North CRAH Gallery Not Started 06/22/26 06/26/26 6.2 6.2
0%
98.8
RPL10.INT.EF1.01280 RPL10.Interior.EF1 - North CRAH Gallery - Fire Life Safety North CRAH Gallery Not Started 06/22/26 06/26/26 6.2 6.2
0%
166.2
RPL10.INT.EF1.01290 RPL10.Interior.EF1 - North CRAH Gallery - Install copper from GS.IDF to BMS and EPMS panels North CRAH Gallery Not Started 06/22/26 06/26/26 6.2 6.2
0%
98.8
RPL10.INT.EF1.01340 RPL10.Interior.EF1 - South CRAH Gallery - Pull EPMS / BMS from panel to devices South CRAH Gallery Not Started 06/22/26 06/26/26 6.2 6.2
0%
98.8
RPL10.INT.EF1.01350 RPL10.Interior.EF1 - South CRAH Gallery - Fire Life Safety South CRAH Gallery Not Started 06/22/26 06/26/26 6.2 6.2
0%
166.2
RPL10.INT.EF1.01360 RPL10.Interior.EF1 - South CRAH Gallery - Install copper from GS.IDF to BMS and EPMS panels South CRAH Gallery Not Started 06/22/26 06/26/26 6.2 6.2
0%
98.8
RPL10.INT.EF1.01520 RPL10.Interior.EF1 - EF1 West - Pull EPMS / BMS from panel to devices West EF-1 Not Started 06/22/26 06/26/26 6.2 6.2
0%
98.8
RPL10.INT.EF1.01530 RPL10.Interior.EF1 - EF1 West - Install copper from GS.IDF to BMS and EPMS panels West EF-1 Not Started 06/22/26 06/26/26 6.2 6.2
0%
98.8
RPL10.INT.EF1.01540 RPL10.Interior.EF1 - EF1 West - Fire Life Safety West EF-1 Not Started 06/22/26 06/30/26 8.8 8.8
0%
163.8
RPL10.INT.ENDC.01290 RPL10.Interior.End-Corridor - BoW - Install Battery Balance of Walls & Overhead Not Started 06/22/26 07/06/26 12.5 12.5
0%
185.0
RPL10.INT.ENDC.1660 RPL10.Interior.End-Corridor - BoW - Final Paint Balance of Walls & Overhead Not Started 06/22/26 07/01/26 10.0 10.0
0%
202.5
RPL10.INT.NS2.02705 RPL10.Interior.NS2 - OFE - Control Fault Domain 2 SQ5.2 (HAC) OFE NS2 Control Fault Domain 2 Not Started 06/22/26 07/13/26 18.8 18.8
0%
0.0
RPL10.INT.NS3.01092 RPL10.Interior.NS3 - LV Skids and TopHat - Maintenance and Reserve Busways NS3 - LV Skids and TopHat Not Started 06/22/26 07/13/26 18.8 18.8
0%
146.2
RPL10.INT.NS3.01440 RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 3 SQ9.2 (including IDF) - WBS Summary Tie-Ins NS3 Control Fault Domain 3 Not Started 06/22/26 10/28/26 113.8 113.8
0%
81.2
RPL10.INT.NS3.03160 RPL10.Interior.NS3 - Control Fault Domain 3 SQ9.2 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Not Started 06/22/26 07/20/26 25.0 25.0
0%
163.8
RPL10.INT.NS4.01670 RPL10.Interior.NS4 - Control Fault Domain 4 SQ10.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 06/22/26 06/25/26 5.0 5.0
0%
188.8
RPL10.W3B.FE.011161 RPL10.Conn EF1B<>NS1.CFD6 (P2-3) Pull Fiber Trunk (384F) [EF<>SSW] EF1B<>NS1.1 (P2-3) [EF<>SSW] Not Started 06/22/26 06/24/26 3.8 3.8
0%
26.2
RPL10.W3B.FE.011281 RPL10.Conn EF2B<>NS1.CFD6 (P1-4) Pull Fiber Trunk (384F) [EF<>SSW] EF2B<>NS1.1 (P1-4) [EF<>SSW] Not Started 06/22/26 06/24/26 3.8 3.8
0%
18.8
RPL10.WP3A.EF.03000 RPL10.Conn EF1B Infrastructure - WBS Summary Infrastructure & Cabling Not Started 06/22/26 08/03/26 37.5 37.5
0%
172.5
RPL10.WP3A.EF.03020 RPL10.Conn EF1B Infrasturcture 1 (Racks & Vertical Cable Manager,Ladder Racks) Infrastructure & Cabling Not Started 06/22/26 07/20/26 25.0 25.0
0%
110.0
RPL10.WP3A.EF.04000 RPL10.Conn EF1B OSP Pathway - WBS Summary Infrastructure & Cabling Not Started 06/22/26 08/03/26 37.5 37.5
0%
172.5
RPL10.WP3B.FE.01020 RPL10.Conn NS1.CFD6 (FE) ISP Cabling - WBS Summary FENW (Front End Network) Not Started 06/22/26 07/10/26 17.5 17.5
0%
41.2
RPL10.WP3B.FE.01115 RPL10.Conn EF2B<>NS1.CFD6 (P1-4) Pull/Install/Test - WBS Summary EF2B<>NS1.1 (P1-4) [EF<>SSW] Not Started 06/22/26 06/30/26 8.8 8.8
0%
42.5
RPL10.WP3B.FE.01125 RPL10.Conn EF1B<>NS1.CFD6 (P2-3) Pull/Install/Test - WBS Summary EF1B<>NS1.1 (P2-3) [EF<>SSW] Not Started 06/22/26 07/08/26 15.0 15.0
0%
41.2
RPL10.CTRC.BB.3495 RPL10.Int.Build Back.Center-Corr - LO #8 - Tape, Float and Paint Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/23/26 06/29/26 6.2 6.2
0%
142.5
RPL10.EY.EF1.01230 RPL10.EY.EF1 - FSP2 - Install Grounding Wire Fiber Support Platform - RPL-2 Not Started 06/23/26 06/24/26 2.5 2.5
0%
243.8
RPL10.EY.EF1.01420 RPL10.EY.EF1 - FSP2 - Install Interior Hilti Support Fiber Support Platform - RPL-2 Not Started 06/23/26 06/30/26 7.5 7.5
0%
231.2
RPL10.EY.EF1.01720 RPL10.EY.EF1 - FSP2 - Install Final Roof (Standing Seam Panels) Phase 2 Fiber Support Platform - RPL-2 Not Started 06/23/26 06/29/26 6.2 6.2
0%
227.5
RPL10.EY.EF1.01820 RPL10.EY.EF1 - FSP1 - Install Insect Screen Phase 2 Fiber Support Platform - RPL-1 Not Started 06/23/26 06/29/26 6.2 6.2
0%
240.0
RPL10.EY.EF1.01840 RPL10.EY.EF1 - FSP2 - Install Louvers Phase 1 Fiber Support Platform - RPL-2 Not Started 06/23/26 06/29/26 6.2 6.2
0%
227.5
RPL10.EY.NS4.01200 RPL10.EY.NS4 - HAC Prefab prior to install Tent and Temp Conditions Not Started 06/23/26 07/07/26 12.5 12.5
0%
68.8
RPL10.INT.ENDC.1700 RPL10.Interior.End-Corridor - BoW - Plumbing Trim Out Balance of Walls & Overhead Not Started 06/23/26 06/29/26 6.2 6.2
0%
202.5
RPL10.INT.ENDC.1720 RPL10.Interior.SSB-Corridor - BoW - Fire Life Safety Trim Out / Fire Alarm Trim Out Balance of Walls & Overhead Not Started 06/23/26 07/02/26 10.0 10.0
0%
261.2
RPL10.INT.NS1.01420 RPL10.Conn NS1.CFD5 - Set Passive Racks for WP3B Infrastructure Not Started 06/23/26 06/25/26 3.8 3.8
0%
21.2
RPL10.INT.NS1.02860 RPL10.Conn NS1.CFD5 - Set Passive Racks for PON Infrastructure Not Started 06/23/26 06/25/26 3.8 3.8
0%
137.5
RPL10.INT.NS2.01480 RPL10.Interior.NS2 - Control Fault Domain 5 SQ2.2 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/23/26 07/21/26 25.0 25.0
0%
12.5
RPL10.INT.NS4.01690 RPL10.Interior.NS4 - Control Fault Domain 5 SQ11.1 - Install Duct (LV Side) LV Side Tie-ins Not Started 06/23/26 06/26/26 5.0 5.0
0%
171.2
RPL10.INT.SSB.01430 RPL10.Interior.SSB - Loading Dock and Storage - Electrical Trim Out Loading Dock and Storage Not Started 06/23/26 07/01/26 8.8 8.8
0%
153.8
RPL10.INT.SSB.01460 RPL10.Interior.SSB - Loading Dock and Storage - Install Lighting and Devices Loading Dock and Storage Not Started 06/23/26 07/01/26 8.8 8.8
0%
153.8
RPL10.INT.SSB.01470 RPL10.Interior.SSB - Loading Dock and Storage - Install Unit Heaters Loading Dock and Storage Not Started 06/23/26 06/29/26 6.2 6.2
0%
162.5
RPL10.INT.SSB.01480 RPL10.Interior.SSB - Loading Dock and Storage - Security Trim Out Loading Dock and Storage Not Started 06/23/26 07/01/26 8.8 8.8
0%
153.8
RPL10.INT.SSB.01540 RPL10.Interior.SSB - Loading Dock and Storage - Fire Life Safety Trim Out / Fire Alarm Trim Out Loading Dock and Storage Not Started 06/23/26 07/01/26 8.8 8.8
0%
153.8
RPL10.INT.SSB.01780 RPL10.Interior.SSB - Loading Dock and Storage - Install Split Systems/Humidifiers Loading Dock and Storage Not Started 06/23/26 06/29/26 6.2 6.2
0%
162.5
RPL10.INT.SSB.06040 RPL10.Interior.SSB - Loading Dock Area - Electrical Panels Loading Dock and Storage Not Started 06/23/26 07/01/26 8.8 8.8
0%
153.8
RPL10.SKN.EF12.01040 RPL10.SKIN.EF12 - Install Louvers Glazing, Doors and Ext Devices Not Started 06/23/26 06/29/26 6.2 6.2
0%
247.5
RPL10.SKN.EF12.01110 RPL10.SKIN.EF12 - Install Scupper and Downspouts Glazing, Doors and Ext Devices Not Started 06/23/26 06/29/26 6.2 6.2
0%
251.2
RPL10.SKN.NS12.01050 RPL10.SKIN.NS12 - Install Lighting Glazing, Doors and Ext Devices Not Started 06/23/26 06/26/26 5.0 5.0
0%
137.5
RPL10.SKN.NS43.01030 RPL10.SKIN.NS43 - Install Awning over Doors Glazing, Doors and Ext Devices Not Started 06/23/26 06/29/26 6.2 6.2
0%
241.2
RPL10.SSB.BB.1980 RPL10.Ext.Build Back.SSB - LO #5 - Install Doors, Hardware Build Back Exterior Leave Out Wall #5 (East SSB) Not Started 06/23/26 06/24/26 2.5 2.5
0%
405.0
RPL10.WP2.GSIDF.2400 RPL10.Conn GSIDFNX05 Install & Test Network (FIM) Network Not Started 06/23/26 06/25/26 3.8 3.8
0%
196.2
RPL10.WP2.GSIDF.3360 RPL10.Conn GSIDFNX05 Install Copper, WAPs, Security Camera & Access Control Cabling Not Started 06/23/26 06/25/26 3.8 3.8
0%
455.0
RPL10.WP2.GSIDF.5720 RPL10.Conn GSIDFNX13 - CorpNet Live Network Not Started 06/23/26 06/23/26 0.0 0.0
0%
662.0
RPL10.WP4.01220 RPL10.Conn NS1.CFD5.09 Pull Duplex Jumper (LC<>LC) [MA<>JXSW] Pull Duplex Jumper [MA<>JXSW] Not Started 06/23/26 06/25/26 3.8 3.8
0%
135.0
RPL10.WP4.027460 RPL10.Conn NS1.CFD5.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
111.2
RPL10.WP4.027660 RPL10.Conn NS1.CFD4.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
111.2
RPL10.WP4.027860 RPL10.Conn NS1.CFD3.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
111.2
RPL10.WP4.028060 RPL10.Conn NS1.CFD2.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
111.2
RPL10.WP4.028260 RPL10.Conn NS1.CFD1.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
111.2
RPL10.WP4.028460 RPL10.Conn NS2.CFD6.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
122.5
RPL10.WP4.028660 RPL10.Conn NS2.CFD5.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
122.5
RPL10.WP4.028860 RPL10.Conn NS2.CFD4.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
122.5
RPL10.WP4.029060 RPL10.Conn NS2.CFD3.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
122.5
RPL10.WP4.029260 RPL10.Conn NS2.CFD2.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/23/26 06/29/26 6.2 6.2
0%
122.5
RPL10.WP4.NS1.02440 RPL10.Conn NS1.CFD5 Infrastructure - WBS Summary Infrastructure Not Started 06/23/26 06/26/26 5.0 5.0
0%
40.0
RPL10.WP4.NS1.02460 RPL10.Conn NS1.CFD5 Infrastructure Infrastructure Not Started 06/23/26 06/26/26 5.0 5.0
0%
40.0
FR03.1340 FR03: PSI - NS1 - PCX H01 & H02 - Issue Resolution FR03: House Power Skid Missing Panel Delay Not Started 06/24/26 06/25/26 2.5 2.5
0%
40.0
FR03.1460 FR03: PSI - NS2 - PCX H01 & H02 - Issue Resolution FR03: House Power Skid Missing Panel Delay Not Started 06/24/26 06/25/26 2.5 2.5
0%
53.8
RPL.10.D.X35X0.XR Substation Perm Power Cutover - RPL10 NS & mCUPs (Potential for remaining provisioning) Power (XREFs) Not Started 06/24/26 06/24/26 0.0 0.0
0%
301.2
RPL.GF.D.N0270.XR Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to RPL8 Connectivity (XREFs) Not Started 06/24/26 06/24/26 0.0 0.0
0%
202.5
RPL.GF.D.N0300.XR Fiber Pulls, Test & Term All Prod EF to EF Complete RPL 10 to AI3 Connectivity (XREFs) Not Started 06/24/26 06/24/26 0.0 0.0
0%
145.0
RPL10.CTRC.BB.3675 RPL10.Int.Build Back.Center-Corr - LO #9 - Hang Drywall Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) Not Started 06/24/26 06/26/26 3.8 3.8
0%
137.5
RPL10.INT.CTRC.01070 RPL10.Interior.Center-Corridor - BoW - Install Doors (Verify with Trades Before Installation) Balance of Walls & OverHead Not Started 06/24/26 06/26/26 3.8 3.8
0%
86.2
RPL10.INT.CTRC.01100 RPL10.Interior.Center-Corridor - BoW - Security Trim Out (Both Side of Corridor Wall) Balance of Walls & OverHead Not Started 06/24/26 06/25/26 2.5 2.5
0%
162.5
RPL10.INT.EF1.01310 RPL10.Interior.EF1 - South CRAH Gallery - Leak Detection / Heat Trace South CRAH Gallery Not Started 06/24/26 06/30/26 6.2 6.2
0%
96.2
RPL10.INT.EF2.01460 RPL10.Interior.EF2 - EF2 East - Set Passive Panels / Racks East EF-2 Not Started 06/24/26 06/30/26 6.2 6.2
0%
175.0
RPL10.INT.NS3.01120 RPL10.Interior.NS3 - OFE - Control Fault Domain 1 SQ7.2 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS3 Control Fault Domain 1 Not Started 06/24/26 08/21/26 52.5 52.5
0%
0.0
RPL10.INT.NS3.02500 RPL10.Interior.NS3 - OFE - Control Fault Domain 1 SQ7.2 (LV Side Aisle) OFE NS3 Control Fault Domain 1 Not Started 06/24/26 06/30/26 6.2 6.2
0%
33.8
RPL10.INT.NS4.01115 RPL10.Interior.NS4 - MES Skids - EPMS Tie-In NS4 - MES Skids Not Started 06/24/26 07/28/26 30.0 30.0
0%
232.5
RPL10.INT.SSB.02720 RPL10.Interior.SSB - BoW - Install Acoustic Baffle Ceiling Walls in specific rooms Balance of Walls and OverHead Not Started 06/24/26 07/02/26 8.8 8.8
0%
177.5
RPL10.INT.SSB.07140 RPL10.Interior.SSB - BoW - Install Bathroon Flooring and Wall Tile Balance of Walls and OverHead Not Started 06/24/26 06/30/26 6.2 6.2
0%
132.5
RPL10.WP2.GSIDF.5740 RPL10.Conn GSIDFNX13 - Security Deployment Network Not Started 06/24/26 06/30/26 5.0 5.0
0%
662.0
RPL10.WP2.GSIDF.6000 RPL10.Conn GSIDFN13 - CorpNet Live Network Not Started 06/24/26 06/24/26 0.0 0.0
0%
661.0
RPL10.WP2.GSIDF.6420 RPL10.Conn GSIDFN23 - CorpNet Live Network Not Started 06/24/26 06/24/26 0.0 0.0
0%
661.0
RPL10.WP2.GSIDF.6660 RPL10.Conn GSIDFN33 - CorpNet/FacNet Ready (Rack & Stack Active Gear Complete) Network Not Started 06/24/26 06/24/26 0.0 0.0
0%
168.0