Schedule Viewer

Last schedule upload: D3-R25005-00-RPL10 — 9281 activities — 06/03/2026 08:35 AM CT
RPL10 - GC LIVE SCHEDULE - Data Date 20260524.xer · Uploaded Jun 03, 2026 01:35 PM · 9281 activities
Experimental Auto-populate checklist dates from schedule:
Clear
100
Activities Shown
0
Completed
0
In Progress
0
Critical
Activity ID Activity Name WBS Status Start Finish Dur (d) Rem (d) % Comp Float (d)
RPL10.WP2.GSIDF.6940 RPL10.Conn GSIDFN31 - CorpNet/FacNet Ready (Rack & Stack Active Gear Complete) Network Not Started 06/24/26 06/24/26 0.0 0.0
0%
656.0
RPL10.WP2.GSIDF.7080 RPL10.Conn GSIDFN43 - CorpNet/FacNet Ready (Rack & Stack Active Gear Complete) Network Not Started 06/24/26 06/24/26 0.0 0.0
0%
168.0
RPL10.WP2.GSIDF.7360 RPL10.Conn GSIDFN41 - CorpNet/FacNet Ready (Rack & Stack Active Gear Complete) Network Not Started 06/24/26 06/24/26 0.0 0.0
0%
656.0
RPL10.WP4.027260 RPL10.Conn NS1.CFD6.48<>11-15 Prefab Duplex Jumper (LC<>LC) [RSW<>FSW] Prefab Not Started 06/24/26 06/30/26 6.2 6.2
0%
110.0
DCC.B10.3245 [NWB] CorpNet/Security/FacNet Ready [NWS 3] Connectivity Not Started 06/25/26 06/25/26 0.0 0.0
0%
312.5
DCC.B10.3255 [NWB] CorpNet/Security/FacNet Ready [NWS 4] Connectivity Not Started 06/25/26 06/25/26 0.0 0.0
0%
312.5
GCD.RPL10.6185 L3/L4 Start mCUP [1-4] - RPL10 mCup Not Started 06/25/26 06/25/26 0.0 0.0
0%
456.2
ICM.B10.2550 [NWB] L3/L4 Start mCUP [1-4] - RPL10 Commissioning Not Started 06/25/26 06/25/26 0.0 0.0
0%
456.2
RPL.10.D.X33X4.XR Pull and Term MV Skids - RPL10 NS4 Loop 1 & 2 Power (XREFs) Not Started 06/25/26 06/25/26 0.0 0.0
0%
125.0
RPL.10.D.X3730.XG RMUs/MV Skids Set (Loop 1) - RPL10 NS4 Give Milestones (XREFs) Not Started 06/25/26 06/25/26 0.0 0.0
0%
828.8
RPL.10.D.X3735.XG RMUs/MV Skids Set (Loop 2) - RPL10 NS4 Give Milestones (XREFs) Not Started 06/25/26 06/25/26 0.0 0.0
0%
828.8
RPL10.CTRC.BB.3535 RPL10.Int.Build Back.Center-Corr - LO #7 - Install Remaining Cable Tray Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) Not Started 06/25/26 06/29/26 3.8 3.8
0%
142.5
RPL10.CX.MCUP.01050 RPL10.CX.mCup Loop 1 - L3/L4 - mCUP mCup Loop 1 (mCup #1,#3,#5,#7) Not Started 06/25/26 08/04/26 35.0 35.0
0%
26.2
RPL10.CX.MCUP.01190 RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup1 and Dry Coolers (MV Loop Needed) Fill and Flush Not Started 06/25/26 07/02/26 7.5 7.5
0%
47.5
RPL10.CX.MCUP.01210 RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup3 and Dry Coolers Fill and Flush Not Started 06/25/26 07/02/26 7.5 7.5
0%
47.5
RPL10.CX.MCUP.01230 RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup5 and Dry Coolers Fill and Flush Not Started 06/25/26 07/02/26 7.5 7.5
0%
47.5
RPL10.CX.MCUP.01250 RPL10.CX.mCup Loop 1 - L3/L4 - mCUP - Flush and Fill - mCup7 and Dry Coolers Fill and Flush Not Started 06/25/26 07/02/26 7.5 7.5
0%
47.5
RPL10.CX.NS1.01090 RPL10.CX.NS1 - L3/L4 - WBS Summary (Mechanical) NS1 MECHANICAL Not Started 06/25/26 11/17/26 126.2 126.2
0%
27.5
RPL10.CX.NS1.01260 RPL10.CX.NS1 - L3/L4 - Control Fault Domain 6 - FW Flush and Fill NS1 Control Fault Domain 6 Not Started 06/25/26 07/06/26 8.8 8.8
0%
12.5
RPL10.Conn.MS.01510 Wifi Ready - SSB Connectivity Milestones Not Started 06/25/26 06/25/26 0.0 0.0
0%
455.0
RPL10.ENDC.BB.4355 RPL10.Int.Build Back.End-Corr - Interior Leave Out (End Corridor) #14 WBS Summary Build Back Interior Leave Out Wall #14 (End Corr) Not Started 06/25/26 08/14/26 45.0 45.0
0%
232.5
RPL10.ENDC.BB.4375 RPL10.Int.Build Back.End-Corr - LO #14 - MEPF - In Wall, OH, Lowside, Lights Build Back Interior Leave Out Wall #14 (End Corr) Not Started 06/25/26 07/23/26 25.0 25.0
0%
232.5
RPL10.INT.NS2.02725 RPL10.Interior.NS2 - OFE - Control Fault Domain 2 SQ5.2 (Mech Side Aisle) OFE NS2 Control Fault Domain 2 Not Started 06/25/26 07/14/26 16.2 16.2
0%
5.0
RPL10.INT.NS4.01770 RPL10.Interior.NS4 - OFE - Control Fault Domain 6 SQ12.1 (LV Side Aisle, HAC, Mech Side Aisle) - WBS Summary OFE NS4 Control Fault Domain 6 Not Started 06/25/26 10/06/26 90.0 90.0
0%
113.8
RPL10.INT.NS4.01790 RPL10.Interior.NS4 - Control Fault Domain 5 SQ11.1 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 06/25/26 06/30/26 5.0 5.0
0%
200.0
RPL10.INT.NS4.02780 RPL10.Interior.NS4 - OFE - Control Fault Domain 6 SQ12.1 (LV Side Aisle) OFE NS4 Control Fault Domain 6 Not Started 06/25/26 07/01/26 6.2 6.2
0%
187.5
RPL10.INT.SSBC.01450 RPL10.Int.Build Back.SSB-Corr - LO #1 - Install Remaning NS1 Interior IMP Walls Build Back Interior Leave Out Wall #1 (NS1) Not Started 06/25/26 06/29/26 3.8 3.8
0%
31.2
RPL10.SSB.BB.1200 RPL10.Ext.Build Back.SSB - LO #5 - MEPF Trim Out Build Back Exterior Leave Out Wall #5 (East SSB) Not Started 06/25/26 07/09/26 12.5 12.5
0%
405.0
RPL10.SSBC.BB.2440 RPL10.Int.Build Back.SSB-Corr - Interior Leave Out #1 WBS Summary Build Back Interior Leave Out Wall #1 (NS1) Not Started 06/25/26 09/04/26 63.8 63.8
0%
87.5
RPL10.W3B.FE.011561 RPL10.Conn EF1F<>NS1.CFD6 (P2-3) Pull Fiber Trunk (384F) [EF<>SSW] EF1F<>NS1.1 (P2-3) [EF<>SSW] Not Started 06/25/26 06/29/26 3.8 3.8
0%
26.2
RPL10.W3B.FE.011681 RPL10.Conn EF2F<>NS1.CFD6 (P1-4) Pull Fiber Trunk (384F) [EF<>SSW] EF2F<>NS1.1 (P1-4) [EF<>SSW] Not Started 06/25/26 06/29/26 3.8 3.8
0%
18.8
RPL10.W3B.FE.012081 RPL10.Conn EF2B<>NS1.CFD6 (P1-4) Install Fiber Trunk (384F) [EF<>SSW] EF2B<>NS1.1 (P1-4) [EF<>SSW] Not Started 06/25/26 06/26/26 2.5 2.5
0%
22.5
RPL10.WP2.GSIDF.4560 RPL10.Conn GSIDFNX05 - CorpNet/FacNet Ready (Rack & Stack Active Gear Complete) Network Not Started 06/25/26 06/25/26 0.0 0.0
0%
655.0
RPL10.WP2.GSIDF.5440 RPL10.Conn GSIDFNX11 - CorpNet Live Network Not Started 06/25/26 06/25/26 0.0 0.0
0%
660.0
RPL10.WP2.GSIDF.6020 RPL10.Conn GSIDFN13 - Security Deployment Network Not Started 06/25/26 07/01/26 5.0 5.0
0%
661.0
RPL10.WP2.GSIDF.6440 RPL10.Conn GSIDFN23 - Security Deployment Network Not Started 06/25/26 07/01/26 5.0 5.0
0%
661.0
RPL10.WP2.GSIDF.6680 RPL10.Conn GSIDFN33 - CorpNet Deployment Network Not Started 06/25/26 07/01/26 5.0 5.0
0%
168.0
RPL10.WP2.GSIDF.6960 RPL10.Conn GSIDFN31 - CorpNet Deployment Network Not Started 06/25/26 07/01/26 5.0 5.0
0%
656.0
RPL10.WP2.GSIDF.7100 RPL10.Conn GSIDFN43 - CorpNet Deployment Network Not Started 06/25/26 07/01/26 5.0 5.0
0%
168.0
RPL10.WP2.GSIDF.7380 RPL10.Conn GSIDFN41 - CorpNet Deployment Network Not Started 06/25/26 07/01/26 5.0 5.0
0%
656.0
RPL10.WP3B.FE.01110 RPL10.Conn EF2F<>NS1.CFD6 (P1-4) Pull/Install/Test - WBS Summary EF2F<>NS1.1 (P1-4) [EF<>SSW] Not Started 06/25/26 07/06/26 8.8 8.8
0%
41.2
RPL10.WP3B.FE.01120 RPL10.Conn EF1F<>NS1.CFD6 (P2-3) Pull/Install/Test - WBS Summary EF1F<>NS1.1 (P2-3) [EF<>SSW] Not Started 06/25/26 07/10/26 13.8 13.8
0%
41.2
RPL.CM.D.C5820.XR Yoda Boss Road Logistics - Onsite Receive XREF Milestones Not Started 06/26/26 06/26/26 0.0 0.0
0%
828.8
RPL.CM.D.C5900.XR Jedi Lane Logistics - Onsite Receive XREF Milestones Not Started 06/26/26 06/26/26 0.0 0.0
0%
828.8
RPL10.EY.NS4.01250 RPL10.EY.NS4 - Install Electrical Tie-ins (include penetration detail) Tie-ins Not Started 06/26/26 07/10/26 12.5 12.5
0%
92.5
RPL10.EY.NS4.01260 RPL10.EY.NS4 - Tie-ins - WBS Summary Tie-ins Not Started 06/26/26 08/07/26 37.5 37.5
0%
156.2
RPL10.INT.CTRC.01440 RPL10.Interior.Center-Corridor - BoW - Plumbing Trim Out (Both Side of Corridor Wall) Balance of Walls & OverHead Not Started 06/26/26 07/01/26 5.0 5.0
0%
162.5
RPL10.INT.NS1.03200 RPL10.Interior.NS1 - Control Fault Domain 1 SQ6.1 - Install FA Terminations to Fire Alarm Panel (In Riser Room) Remaining Tie-ins post Mech Side Aisle install Not Started 06/26/26 07/02/26 6.2 6.2
0%
73.8
RPL10.INT.NS2.01690 RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install Vesda / FA Remaining Tie-ins post Mech Side Aisle install Not Started 06/26/26 07/24/26 25.0 25.0
0%
26.2
RPL10.INT.NS2.01700 RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install FW Remaining Tie-ins post Mech Side Aisle install Not Started 06/26/26 07/24/26 25.0 25.0
0%
20.0
RPL10.INT.NS2.01760 RPL10.Interior.NS2 - Control Fault Domain 3 SQ4.2 - L2 Checklist Completion Remaining Tie-ins post Mech Side Aisle install Not Started 06/26/26 07/24/26 25.0 25.0
0%
28.8
RPL10.INT.NS2.02260 RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install TW Remaining Tie-ins post Mech Side Aisle install Not Started 06/26/26 07/24/26 25.0 25.0
0%
20.0
RPL10.INT.NS2.02885 RPL10.Interior.NS2 - Control Fault Domain 2 SQ5.2 - Install Duct (MES Side) Remaining Tie-ins post Mech Side Aisle install Not Started 06/26/26 07/24/26 25.0 25.0
0%
20.0
RPL10.INT.NS3.01130 RPL10.Interior.NS3 - Control Fault Domain 1 SQ7.2 - Install Duct (LV Side) LV Side Tie-ins Not Started 06/26/26 07/02/26 6.2 6.2
0%
48.8
RPL10.INT.NS3.01580 RPL10.Interior.NS3 - Tie-ins - Control Fault Domain 4 SQ10.2 - WBS Summary Tie-Ins NS3 Control Fault Domain 4 Not Started 06/26/26 11/12/26 121.2 121.2
0%
93.8
RPL10.INT.NS3.03180 RPL10.Interior.NS3 - Control Fault Domain 4 SQ10.2 - Install HAC Busway and Cable Tray Tie-In Remaining Tie-ins post Mech Side Aisle install Not Started 06/26/26 07/24/26 25.0 25.0
0%
183.8
RPL10.INT.NS4.01810 RPL10.Interior.NS4 - Control Fault Domain 5 SQ11.1 - Install LV Side Aisle Cable Tray LV Side Tie-ins Not Started 06/26/26 07/01/26 5.0 5.0
0%
200.0
RPL10.ORV3.010020 OFE - Delivery ROJ: ORv3 for CFD NS1.6 (ROJ 07.14.26) (RVCD 08.03.26) NS1 Not Started 06/26/26 07/17/26 18.8 18.8
0%
21.2
RPL10.WP2.GSIDF.4120 RPL10.Conn GSIDFNX01 - FacNet Live Network Not Started 06/26/26 06/26/26 0.0 0.0
0%
669.0
RPL10.WP2.GSIDF.4260 RPL10.Conn GSIDFNX02 - FacNet Live Network Not Started 06/26/26 06/26/26 0.0 0.0
0%
669.0
RPL10.WP2.GSIDF.4580 RPL10.Conn GSIDFNX05 - CorpNet Deployment Network Not Started 06/26/26 07/02/26 5.0 5.0
0%
655.0
RPL10.WP2.GSIDF.4820 RPL10.Conn GSIDFNX06 - FacNet Live Network Not Started 06/26/26 06/26/26 0.0 0.0
0%
669.0
RPL10.WP2.GSIDF.4960 RPL10.Conn GSIDFNX07 - FacNet Live Network Not Started 06/26/26 06/26/26 0.0 0.0
0%
669.0
RPL10.WP2.GSIDF.5460 RPL10.Conn GSIDFNX11 - Security Deployment Network Not Started 06/26/26 07/02/26 5.0 5.0
0%
660.0
RPL10.WP2.GSIDF.7620 RPL10.Conn GSMDF2 - FacNet Live Network Not Started 06/26/26 06/26/26 0.0 0.0
0%
46.0
RPL10.WP2.GSIDF.7760 RPL10.Conn GSMDF1 - FacNet Live Network Not Started 06/26/26 06/26/26 0.0 0.0
0%
46.0
RPL10.WP4.01240 RPL10.Conn NS1.CFD5.10 Pull Duplex Jumper (LC<>LC) [MA<>JXSW] Pull Duplex Jumper [MA<>JXSW] Not Started 06/26/26 06/30/26 3.8 3.8
0%
135.0
GCD.RPL10.4065 [RPL10] TC Ready: Production Cabling Pathways Complete [NS2 Rows 1-8] TC Ready: Production Cabling - NS2 Not Started 06/29/26 06/29/26 0.0 0.0
0%
25.0
JCL.C.1320 RPL10 - Cost Risk LOE-17 Site Cost LOEs Not Started 06/29/26 01/28/27 182.5 182.5
0%
271.2
RPL10.CTRC.BB.3695 RPL10.Int.Build Back.Center-Corr - LO #9 - Paint Build Back Interior Leave Out Wall #7, #7B #9 (Center Corr) Not Started 06/29/26 07/06/26 6.2 6.2
0%
137.5
RPL10.CX.NS1.01620 RPL10.CX.NS1 - Temp Power for CFD6, CFD5, CFD4 ICPs (Frag) NS1 ELECTRICAL Not Started 06/29/26 06/29/26 0.0 0.0
0%
42.5
RPL10.Conn.MS.01490 Wifi Ready - mCUP Yard Connectivity Milestones Not Started 06/29/26 06/29/26 0.0 0.0
0%
452.5
RPL10.INT.CTRC.01390 RPL10.Interior.Center-Corridor - BoW - Final QC Balance of Walls & OverHead Not Started 06/29/26 07/06/26 6.2 6.2
0%
86.2
RPL10.INT.NS3.01093 RPL10.Interior.NS3 - LV Skids and TopHat - Top Hat Busway NS3 - LV Skids and TopHat Not Started 06/29/26 07/20/26 18.8 18.8
0%
146.2
RPL10.INT.NS3.01115 RPL10.Interior.NS3 - MES Skids - EPMS Tie-Ins NS3 - MES Skids Not Started 06/29/26 07/31/26 30.0 30.0
0%
242.5
RPL10.MCUP.LP1.2100 RPL10.MCUP.Loop 1 - Install Exterior Signage Hardscape and Landscape Not Started 06/29/26 07/13/26 12.5 12.5
0%
441.2
RPL10.SKN.NS12.01060 RPL10.SKIN.NS12 - Install Security Glazing, Doors and Ext Devices Not Started 06/29/26 06/30/26 2.5 2.5
0%
137.5
RPL10.W3B.FE.012881 RPL10.Conn EF2B<>NS1.CFD6 (P1-4) Test Fiber Trunk (384F) [EF<>SSW] EF2B<>NS1.1 (P1-4) [EF<>SSW] Not Started 06/29/26 06/30/26 2.5 2.5
0%
42.5
RPL10.WP2.GSIDF.5540 RPL10.Conn GSIDFNX12 - CorpNet/FacNet Ready (Rack & Stack Active Gear Complete) Network Not Started 06/29/26 06/29/26 0.0 0.0
0%
653.0
RPL10.WP3A.EF.03040 RPL10.Conn EF1B Infrasturcture 2 (Tier1 & waterfalls etc.) Infrastructure & Cabling Not Started 06/29/26 07/27/26 25.0 25.0
0%
148.8
RPL10.WP4.NS1.01220 RPL10.Conn NS1.CFD5 Infrastructure - WBS Summary Infrastructure Not Started 06/29/26 07/13/26 12.5 12.5
0%
40.0
RPL10.WP4.NS1.01240 RPL10.Conn NS1.CFD5 Infrastructure Infrastructure Not Started 06/29/26 07/13/26 12.5 12.5
0%
40.0
RPL.GF.D.N0160.XG Infrastructure Complete EF1F Give Milestones (XREFs) Not Started 06/30/26 06/30/26 0.0 0.0
0%
825.0
RPL10.CTRC.BB.1020 RPL10.Int.Build Back.Center-Corr - LO #6,8 - MEPF - OH, Lowside, Lights Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/30/26 07/14/26 12.5 12.5
0%
142.5
RPL10.CTRC.BB.1100 RPL10.Int.Build Back.Center-Corr - LO #6,8 - MEPF Trim Out Build Back Interior Leave Out Wall #6 #8 (Center Corr) Not Started 06/30/26 07/09/26 8.8 8.8
0%
142.5
RPL10.EY.EF1.01390 RPL10.EY.EF1 - Install EY Paving Hardscape and Landscape Not Started 06/30/26 07/07/26 6.2 6.2
0%
415.0
RPL10.EY.EF1.01860 RPL10.EY.EF1 - FSP2 - Install Insect Screen Phase 1 Fiber Support Platform - RPL-2 Not Started 06/30/26 07/07/26 6.2 6.2
0%
227.5
RPL10.EY.EF1.01880 RPL10.EY.EF1 - FSP2 - Install Louvers Phase 2 Fiber Support Platform - RPL-2 Not Started 06/30/26 07/07/26 6.2 6.2
0%
227.5
RPL10.EY.EF2.01440 RPL10.EY.EF2 - Install Early EY Paving Hardscape and Landscape Not Started 06/30/26 07/07/26 6.2 6.2
0%
408.8
RPL10.EY.ENDC.01200 RPL10.EY.End - L2 Checklist Completion Tie-ins Not Started 06/30/26 07/07/26 6.2 6.2
0%
243.8
RPL10.EY.NS3.01200 RPL10.EY.NS3 - HAC Prefab prior to install Tent and Temp Conditions Not Started 06/30/26 07/14/26 12.5 12.5
0%
17.5
RPL10.INT.ENDC.01360 RPL10.Interior.End-Corridor - BoW - Install Lighting Balance of Walls & Overhead Not Started 06/30/26 07/09/26 8.8 8.8
0%
202.5
RPL10.INT.NS2.01200 RPL10.Conn NS2.CFD6 - Set Passive Racks for WP3B Infrastructure Not Started 06/30/26 07/02/26 3.8 3.8
0%
21.2
RPL10.INT.NS2.02925 RPL10.Conn NS2.CFD6 - Set Passive Racks for PON Infrastructure Not Started 06/30/26 07/02/26 3.8 3.8
0%
142.5
RPL10.INT.NS3.01230 RPL10.Interior.NS3 - Control Fault Domain 1 SQ7.2 - Install LV Side Aisle HAC Busway LV Side Tie-ins Not Started 06/30/26 07/07/26 6.2 6.2
0%
80.0
RPL10.INT.NS4.01830 RPL10.Interior.NS4 - Control Fault Domain 6 SQ12.1 - Install Duct (LV Side) LV Side Tie-ins Not Started 06/30/26 07/06/26 5.0 5.0
0%
187.5
RPL10.INT.SSBC.01420 RPL10.Interior.SSB-Corridor - BoW - Final Clean Balance of Walls & OverHead Not Started 06/30/26 07/06/26 5.0 5.0
0%
102.5
RPL10.OFCI.7060 OFCI - Delivery ROJ: FE Fiber for CFD NS4.1 (ROJ ) (RVCD ) NS4 Not Started 06/30/26 07/21/26 18.8 18.8
0%
111.2
RPL10.SKN.EF12.01050 RPL10.SKIN.EF12 - Install Lighting Glazing, Doors and Ext Devices Not Started 06/30/26 07/06/26 5.0 5.0
0%
247.5
RPL10.SKN.NS43.01040 RPL10.SKIN.NS43 - Install Louvers Glazing, Doors and Ext Devices Not Started 06/30/26 07/07/26 6.2 6.2
0%
241.2